X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515181216000

Well Details

Well ID: 0515181216000
Loading map...
Location: 00/16-12-051-18W5/0
Location Alias: 00/16-12-51-18 W5M
Location Alias 2: 00/16-12-051-18 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 18
Section: 12
County/Municipality: Yellowhead County
Well Name: TALISMAN HZ EDSON 16-12-51-18
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0476765
License Date: 2015-09-01
License Status: Issued
Spud Date: 2016-01-29
Final Drill Date: 2016-02-14
Well Total Depth: 4335.00 m
Surface Hole Latitude: 53.379803
Surface Hole Longitude: -116.508442

For data sources see[1][2]

Well History

Date Event
2015-09-01 Obtained License
2016-01-30 Surface Casing Operation Performed
2016-02-01 Well Log Performed
2016-02-05 Intermediate Casing Operation Performed
2016-02-06 Direction Drilling Operation Performed - Deviate
2016-02-08 Direction Drilling Operation Performed - Horizontal
2016-02-09 Well Log Performed
2016-02-14 Finished Drilling
2016-02-14 Well Log Performed
2016-02-14 Well Mode changed to Drilled and Cased
2016-02-15 Production Casing Operation Performed
2016-02-16 Perforation Treatment Performed - Jet Perforation
2016-02-16 Perforation Treatment Performed - Open-Hole Completion
2016-02-16 Perforation Treatment Performed - Remedial Casing
2016-02-16 Rig Released
2016-02-16 Well Log Performed
2016-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-10 Well Fluid changed to Shale Gas and Other
2016-03-10 Well Mode changed to Testing
2016-04-01 Well Began Production
2016-04-01 Well Fluid changed to Shale Gas and Other
2016-04-01 Well Mode changed to Flowing
2019-12-01 Well Fluid changed to Shale Gas and Other
2019-12-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-01-29 Horizon Drilling Inc. 48 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-02-06 2355.00 Deviate (5 - 79 degrees)
2016-02-08 2943.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-02-16 Perforation 112.00 113.00 17
2016-03-07 Multi-Stage Fracture 4032.70 4032.80 0
2016-03-07 Multi-Stage Fracture 3962.10 3962.20 0
2016-03-07 Multi-Stage Fracture 3891.80 3891.90 0
2016-03-07 Multi-Stage Fracture 3821.40 3821.50 0
2016-03-07 Multi-Stage Fracture 3750.90 3751.00 0
2016-03-07 Multi-Stage Fracture 3680.60 3680.70 0
2016-03-07 Multi-Stage Fracture 3610.10 3610.20 0
2016-03-07 Multi-Stage Fracture 3540.00 3540.10 0
2016-03-07 Multi-Stage Fracture 3470.30 3470.40 0
2016-03-08 Multi-Stage Fracture 3399.90 3400.00 0
2016-02-16 Remedial Casing Cementing 112.00 113.00 0
2016-03-08 Multi-Stage Fracture 3329.30 3329.40 0
2016-03-08 Multi-Stage Fracture 3258.80 3258.90 0
2016-03-08 Multi-Stage Fracture 3188.60 3188.70 0
2016-03-08 Multi-Stage Fracture 3118.40 3118.50 0
2016-03-08 Multi-Stage Fracture 3061.70 3061.80 0
2016-03-08 Multi-Stage Fracture 3018.50 3018.60 0
2016-02-16 Perforation 56.00 57.00 17
2016-02-16 Remedial Casing Cementing 56.00 57.00 0
2016-02-16 Open Hole/Barefoot Completion 4327.50 4335.00 0
2016-03-07 Multi-Stage Fracture 4302.00 4302.10 0
2016-03-07 Multi-Stage Fracture 4243.70 4243.80 0
2016-03-07 Multi-Stage Fracture 4173.40 4173.50 0
2016-03-07 Multi-Stage Fracture 4103.10 4103.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-03-07 2016-03-08 2,786 7,482 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.8527 N/A
30/50 Sanjel Crystalline Silica 14808-60-7 100 7.8631 N/A
40/70 Sanjel Crystalline Silica 14808-60-7 100 1.1173 N/A
B-1008 Sanjel Bactericide/Biocide Broponol 52-51-7 100 0.0171 N/A
Methanol 67-56-1 100 0.0171 N/A
Non-Hazardous Ingredients Not Available 100 0.0171 N/A
SCC-1L Sanjel Clay Control Non-Hazardous Ingredients Not Available 100 0.1676 N/A
FRW-3 Sanjel Friction Reducer Isoparaffinic Solvent 64742-47-8 100 0.0674 N/A
Non-Hazardous Ingredients Not Available 100 0.0674 N/A
Surfactant 68131-40-8 100 0.0674 N/A
SI-18 (TPC-F-038) Sanjel Scale Inhibitor Non-Hazardous Ingredients Not Available 100 0.0084 N/A
NE-8 (LDP-F-2415) Sanjel Surfactant 2-Propanol 67-63-0 100 0.0429 N/A
Non-Hazardous Ingredients Not Available 100 0.0429 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-03-07 2016-03-07 Recycled Fracturing Water (treated at well site) 2591
2016-03-03 2016-03-07 Surface Water - River 5091

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 6478 0.0 0.0 0.0
2017 7661 0.0 0.0 0.0
2018 7935 0.0 0.0 0.0
2019 8247 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-02-16 No Incident Encountered 0.00 0.00
2016-03-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References