If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0515181315020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.407427,"lon":-116.515776,"icon":""}]} |
Location: 02/15-13-051-18W5/0 | |
Location Alias: 02/15-13-51-18 W5M | |
Location Alias 2: 02/15-13-051-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 5 | |
Range: 18 | |
Section: 13 | |
County/Municipality: Yellowhead County | |
Well Name: CABRE ET AL EDSON 15-13-51-18 | |
Operator Name: Enerplus Corporation | |
License Number: 0146267 | |
License Date: 1990-11-09 | |
License Status: Abandoned | |
Spud Date: 1990-11-18 | |
Final Drill Date: 1990-12-11 | |
Well Total Depth: 2440.00 m | |
Surface Hole Latitude: 53.407427 | |
Surface Hole Longitude: -116.515776 |
Date | Event |
---|---|
1990-11-09 | Obtained License |
1990-11-21 | Surface Casing Operation Performed |
1990-12-11 | Finished Drilling |
1990-12-14 | Well Log Performed |
1990-12-16 | Production Casing Operation Performed |
1990-12-16 | Rig Released |
1990-12-16 | Well Mode changed to Drilled and Cased |
1991-01-05 | Well Log Performed |
1991-01-09 | Perforation Treatment Performed - Jet Perforation |
1991-01-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-01-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-01-25 | Perforation Treatment Performed - Jet Perforation |
1991-01-26 | Perforation Treatment Performed - Jet Perforation |
1991-12-19 | Perforation Treatment Performed - Jet Perforation |
1991-12-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-02-27 | Perforation Treatment Performed - Jet Perforation |
1993-02-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2009-03-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-12 | Plug Back Performed |
2009-03-12 | Well Log Performed |
2009-03-12 | Well Mode changed to Abandoned Zone |
2009-03-13 | Perforation Treatment Performed - Jet Perforation |
2009-03-13 | Well Log Performed |
2009-03-14 | Perforation Treatment Performed - Cement Plug |
2009-03-14 | Perforation Treatment Performed - Remedial Casing |
2009-03-16 | Perforation Treatment Performed - Jet Perforation |
2009-03-16 | Well Log Performed |
2009-03-17 | Perforation Treatment Performed - Cement Plug |
2009-03-17 | Perforation Treatment Performed - Remedial Casing |
2009-03-19 | Perforation Treatment Performed - Jet Perforation |
2009-03-19 | Well Log Performed |
2009-03-20 | Perforation Treatment Performed - Cement Plug |
2009-03-20 | Perforation Treatment Performed - Remedial Casing |
2009-03-22 | Perforation Treatment Performed - Jet Perforation |
2009-03-22 | Well Log Performed |
2009-03-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-23 | Perforation Treatment Performed - Remedial Casing |
2009-03-25 | Well Log Performed |
2009-04-01 | Perforation Treatment Performed - Jet Perforation |
2009-04-01 | Well Log Performed |
2009-04-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-04-02 | Perforation Treatment Performed - Remedial Casing |
2009-04-05 | Well Log Performed |
2009-04-08 | Perforation Treatment Performed - Jet Perforation |
2009-04-08 | Well Log Performed |
2009-04-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-04-09 | Perforation Treatment Performed - Remedial Casing |
2009-04-14 | Well Log Performed |
2009-04-15 | Well Abandoned |
2009-04-15 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1991-01-09 | Perforation | 2354.00 | 2369.00 | 13 |
1993-02-27 | Perforation | 2300.00 | 2304.00 | 13 |
1993-02-27 | Perforation | 2271.00 | 2275.00 | 13 |
1993-02-27 | Perforation | 2260.00 | 2270.00 | 13 |
1993-02-28 | Acid Treatment | 2260.00 | 2346.00 | 0 |
2009-03-12 | Packing Device Capped w/Cement | 2239.00 | 2248.00 | 0 |
2009-03-13 | Perforation | 1711.00 | 1712.00 | 13 |
2009-03-13 | Perforation | 1534.00 | 1535.00 | 13 |
2009-03-14 | Remedial Casing Cementing | 1534.00 | 1712.00 | 0 |
2009-03-14 | Cement Plug | 1527.60 | 1715.00 | 0 |
2009-03-14 | Cement Plug | 1519.00 | 1527.60 | 0 |
1991-01-13 | Acid Treatment | 2354.00 | 2369.00 | 0 |
2009-03-16 | Perforation | 1427.00 | 1428.00 | 13 |
2009-03-16 | Perforation | 1376.00 | 1377.00 | 13 |
2009-03-16 | Perforation | 1352.00 | 1353.00 | 13 |
2009-03-16 | Perforation | 1275.50 | 1276.50 | 13 |
2009-03-16 | Perforation | 1240.00 | 1241.00 | 13 |
2009-03-17 | Remedial Casing Cementing | 1240.00 | 1428.00 | 0 |
2009-03-17 | Cement Plug | 1262.39 | 1443.00 | 0 |
2009-03-19 | Perforation | 1152.00 | 1153.00 | 13 |
2009-03-19 | Perforation | 1099.50 | 1100.50 | 13 |
2009-03-19 | Perforation | 1019.50 | 1020.50 | 13 |
1991-01-15 | Acid Treatment | 2354.00 | 2369.00 | 0 |
2009-03-19 | Perforation | 953.00 | 954.00 | 13 |
2009-03-19 | Perforation | 929.00 | 930.00 | 13 |
2009-03-20 | Remedial Casing Cementing | 929.00 | 1153.00 | 0 |
2009-03-20 | Cement Plug | 762.04 | 1262.39 | 0 |
2009-03-22 | Perforation | 601.00 | 602.00 | 13 |
2009-03-23 | Remedial Casing Cementing | 601.00 | 602.00 | 0 |
2009-03-23 | Packing Device Capped w/Cement | 580.00 | 589.00 | 0 |
2009-04-01 | Perforation | 545.00 | 546.00 | 13 |
2009-04-02 | Remedial Casing Cementing | 545.00 | 546.00 | 0 |
2009-04-02 | Packing Device Capped w/Cement | 526.00 | 535.00 | 0 |
1991-01-25 | Perforation | 2315.00 | 2338.00 | 13 |
2009-04-08 | Perforation | 399.00 | 400.00 | 17 |
2009-04-09 | Remedial Casing Cementing | 399.00 | 400.00 | 0 |
2009-04-09 | Packing Device Capped w/Cement | 385.80 | 394.80 | 0 |
1991-01-26 | Perforation | 2371.00 | 2384.00 | 13 |
1991-12-19 | Perforation | 2400.00 | 2437.00 | 10 |
1991-12-21 | Acid Treatment | 2400.00 | 2437.00 | 0 |
1993-02-27 | Perforation | 2342.00 | 2346.00 | 13 |
1993-02-27 | Perforation | 2336.00 | 2339.00 | 13 |
For data sources see[4]