If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515182016023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.420206,"lon":-116.613289,"icon":""}]} |
| Location: 02/16-20-051-18W5/3 | |
| Location Alias: 02/16-20-51-18 W5M | |
| Location Alias 2: 02/16-20-051-18 W5/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 20 | |
| County/Municipality: Yellowhead County | |
| Well Name: TOURMALINE EDSON 16-20-51-18 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0353517 | |
| License Date: 2006-03-07 | |
| License Status: Amended | |
| Spud Date: 2006-11-02 | |
| Final Drill Date: 2006-11-06 | |
| Well Total Depth: 3670.00 m | |
| Surface Hole Latitude: 53.420206 | |
| Surface Hole Longitude: -116.613289 |
| Date | Event |
|---|---|
| 2006-03-07 | Obtained License |
| 2006-11-02 | Direction Drilling Operation Performed - Deviate |
| 2006-11-06 | Finished Drilling |
| 2006-11-06 | Perforation Treatment Performed - Jet Perforation |
| 2006-11-06 | Well Mode changed to Drilled and Cased |
| 2006-11-07 | Well Log Performed |
| 2006-11-08 | Perforation Treatment Performed - Jet Perforation |
| 2006-11-10 | Perforation Treatment Performed - Fractured |
| 2006-11-15 | Perforation Treatment Performed - Jet Perforation |
| 2006-11-16 | Well Log Performed |
| 2006-11-19 | Perforation Treatment Performed - Fractured |
| 2006-12-15 | Rig Released |
| 2007-02-06 | Well Began Production |
| 2007-02-06 | Well Fluid changed to Gas |
| 2007-02-06 | Well Mode changed to Flowing |
| 2010-07-07 | Perforation Treatment Performed - Jet Perforation |
| 2010-07-07 | Well Log Performed |
| 2010-07-08 | Liner Casing Operation Performed |
| 2010-07-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-07-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-07-24 | Well Log Performed |
| 2011-12-06 | Well Fluid changed to Gas |
| 2011-12-06 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2006-11-02 | 2456.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-11-06 | Perforation | 2967.00 | 2968.00 | 13 |
| 2006-11-15 | Perforation | 2810.00 | 2816.00 | 20 |
| 2006-11-19 | Fracture | 2810.00 | 2816.00 | 0 |
| 2010-07-07 | Perforation | 2931.00 | 2932.00 | 6 |
| 2010-07-07 | Perforation | 2901.00 | 2902.00 | 3 |
| 2010-07-07 | Perforation | 2855.50 | 2856.50 | 17 |
| 2010-07-07 | Perforation | 2833.00 | 2834.00 | 17 |
| 2010-07-07 | Perforation | 2817.00 | 2818.10 | 17 |
| 2010-07-07 | Perforation | 2763.00 | 2764.00 | 6 |
| 2010-07-07 | Perforation | 2723.00 | 2724.00 | 3 |
| 2010-07-07 | Perforation | 2673.00 | 2674.00 | 17 |
| 2006-11-06 | Perforation | 2970.80 | 2971.80 | 13 |
| 2010-07-07 | Perforation | 2638.00 | 2639.00 | 17 |
| 2010-07-17 | Multi-Stage Fracture | 2901.00 | 2932.00 | 0 |
| 2010-07-17 | Multi-Stage Fracture | 2855.50 | 2856.50 | 0 |
| 2010-07-18 | Multi-Stage Fracture | 2833.00 | 2834.00 | 0 |
| 2010-07-18 | Multi-Stage Fracture | 2817.00 | 2818.10 | 0 |
| 2010-07-18 | Multi-Stage Fracture | 2723.00 | 2764.00 | 0 |
| 2010-07-18 | Multi-Stage Fracture | 2673.00 | 2674.00 | 0 |
| 2010-07-18 | Multi-Stage Fracture | 2638.00 | 2639.00 | 0 |
| 2006-11-06 | Perforation | 2973.00 | 2974.50 | 13 |
| 2006-11-06 | Perforation | 2975.20 | 2976.50 | 13 |
| 2006-11-06 | Perforation | 2977.50 | 2978.00 | 13 |
| 2006-11-06 | Perforation | 2980.00 | 2981.50 | 13 |
| 2006-11-08 | Perforation | 2976.00 | 2981.00 | 20 |
| 2006-11-08 | Perforation | 2972.00 | 2976.00 | 20 |
| 2006-11-10 | Fracture | 2967.00 | 2981.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2007 | 7892 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 7678 | 0.0 | 0.0 | 0.0 |
| 2010 | 6643 | 0.0 | 0.0 | 0.0 |
| 2011 | 8249 | 0.0 | 0.0 | 0.0 |
| 2012 | 7391 | 0.0 | 0.0 | 0.0 |
| 2013 | 1632 | 0.0 | 0.0 | 0.0 |
| 2014 | 5796 | 0.0 | 0.0 | 0.0 |
| 2015 | 2191 | 0.0 | 0.0 | 0.0 |
| 2016 | 8417 | 0.0 | 0.0 | 0.0 |
| 2017 | 3591 | 0.0 | 0.0 | 0.0 |
| 2018 | 5458 | 0.0 | 0.0 | 0.0 |
| 2019 | 8616 | 0.0 | 0.0 | 0.0 |
| 2020 | 2147 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2010-07-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]