X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515182201000

Well Details

Well ID: 0515182201000
Loading map...
Location: 00/01-22-051-18W5/0
Location Alias: 00/01-22-51-18 W5M
Location Alias 2: 00/01-22-051-18 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 18
Section: 22
County/Municipality: Yellowhead County
Well Name: ROGCI HZ EDSON 1-22-51-18
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0478866
License Date: 2016-01-22
License Status: Issued
Spud Date: 2016-08-13
Final Drill Date: 2016-08-31
Well Total Depth: 4889.00 m
Surface Hole Latitude: 53.424079
Surface Hole Longitude: -116.582383

For data sources see[1][2]

Well History

Date Event
2016-01-22 Obtained License
2016-08-13 Surface Casing Operation Performed
2016-08-20 Direction Drilling Operation Performed - Deviate
2016-08-22 Well Log Performed
2016-08-23 Intermediate Casing Operation Performed
2016-08-25 Direction Drilling Operation Performed - Horizontal
2016-08-31 Finished Drilling
2016-08-31 Well Log Performed
2016-08-31 Well Mode changed to Drilled and Cased
2016-09-02 Production Casing Operation Performed
2016-09-04 Perforation Treatment Performed - Open-Hole Completion
2016-09-04 Rig Released
2016-12-01 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-02 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-14 Well Fluid changed to Gas
2016-12-14 Well Mode changed to Testing
2017-01-12 Well Began Production
2017-01-12 Well Fluid changed to Gas
2017-01-12 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-08-14 Trinidad Drilling Ltd. 418 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-08-20 2497.10 Deviate (5 - 79 degrees)
2016-08-25 2954.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-09-04 Open Hole/Barefoot Completion 4881.00 4889.00 0
2016-12-01 Multi-Stage Fracture 4291.50 4291.60 0
2016-12-01 Multi-Stage Fracture 4221.20 4221.30 0
2016-12-01 Multi-Stage Fracture 4150.80 4150.90 0
2016-12-01 Multi-Stage Fracture 4080.40 4080.50 0
2016-12-01 Multi-Stage Fracture 4010.10 4010.20 0
2016-12-02 Multi-Stage Fracture 3939.70 3939.80 0
2016-12-02 Multi-Stage Fracture 3869.80 3869.90 0
2016-12-02 Multi-Stage Fracture 3799.50 3799.60 0
2016-12-02 Multi-Stage Fracture 3729.10 3729.20 0
2016-12-02 Multi-Stage Fracture 3658.70 3658.80 0
2016-12-01 Multi-Stage Fracture 4844.80 4844.90 0
2016-12-02 Multi-Stage Fracture 3588.40 3588.50 0
2016-12-02 Multi-Stage Fracture 3518.60 3518.70 0
2016-12-02 Multi-Stage Fracture 3448.20 3448.30 0
2016-12-02 Multi-Stage Fracture 3377.90 3378.00 0
2016-12-02 Multi-Stage Fracture 3307.50 3307.60 0
2016-12-02 Multi-Stage Fracture 3237.20 3237.30 0
2016-12-02 Multi-Stage Fracture 3166.80 3166.90 0
2016-12-02 Multi-Stage Fracture 3096.50 3096.60 0
2016-12-02 Multi-Stage Fracture 3026.10 3026.20 0
2016-12-02 Multi-Stage Fracture 2955.70 2955.80 0
2016-12-01 Multi-Stage Fracture 4783.50 4783.60 0
2016-12-01 Multi-Stage Fracture 4713.10 4713.20 0
2016-12-01 Multi-Stage Fracture 4642.70 4642.80 0
2016-12-01 Multi-Stage Fracture 4572.40 4572.50 0
2016-12-01 Multi-Stage Fracture 4502.40 4502.50 0
2016-12-01 Multi-Stage Fracture 4432.30 4432.40 0
2016-12-01 Multi-Stage Fracture 4361.90 4362.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-12-01 2016-12-02 2,793 10,284 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.5251 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 15.9537 N/A
Sand - Tier 2 (40/70) Trican silica crystalline 14808-60-7 100 1.1227 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0098 N/A
2-mercaptoethanol 60-24-2 100 0.0098 N/A
dibromoacetonitrile 3252-43-5 100 0.0098 N/A
non-hazardous ingredients Not Available 100 0.0098 N/A
sodium bromide 7647-15-6 100 0.0098 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0213 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1543 N/A
non-hazardous ingredients Not Available 100 0.1543 N/A
FR-18 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0849 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0849 N/A
non-hazardous ingredients Not Available 100 0.0849 N/A
GSI-1W Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0451 N/A
propylene glycol 57-55-6 100 0.0451 N/A
PFC-3 Trican Surfactant aminofunctional polymer 10352 100 0.0627 N/A
glycol ether 10352 100 0.0627 N/A
petroleum distillates 10352 100 0.0627 N/A
silicon compound 10352 100 0.0627 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.02 N/A
methanol 67-56-1 100 0.02 N/A
water Not Available 100 0.02 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-10-25 2016-11-29 Surface Water - Lake 9399
2016-11-20 2016-11-20 Recycled Fracturing Water (treated at well site) 745
2016-11-25 2016-12-07 Municipal Water 94
2016-12-02 2016-12-18 Municipal Water 98

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 48 0.0 0.0 0.0
2017 8374 0.0 0.0 0.0
2018 8043 0.0 0.0 0.0
2019 8371 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-04 No Incident Encountered 0.00 0.00
2016-12-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References