If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515182201000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.424079,"lon":-116.582383,"icon":""}]} |
| Location: 00/01-22-051-18W5/0 | |
| Location Alias: 00/01-22-51-18 W5M | |
| Location Alias 2: 00/01-22-051-18 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 22 | |
| County/Municipality: Yellowhead County | |
| Well Name: ROGCI HZ EDSON 1-22-51-18 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0478866 | |
| License Date: 2016-01-22 | |
| License Status: Issued | |
| Spud Date: 2016-08-13 | |
| Final Drill Date: 2016-08-31 | |
| Well Total Depth: 4889.00 m | |
| Surface Hole Latitude: 53.424079 | |
| Surface Hole Longitude: -116.582383 |
| Date | Event |
|---|---|
| 2016-01-22 | Obtained License |
| 2016-08-13 | Surface Casing Operation Performed |
| 2016-08-20 | Direction Drilling Operation Performed - Deviate |
| 2016-08-22 | Well Log Performed |
| 2016-08-23 | Intermediate Casing Operation Performed |
| 2016-08-25 | Direction Drilling Operation Performed - Horizontal |
| 2016-08-31 | Finished Drilling |
| 2016-08-31 | Well Log Performed |
| 2016-08-31 | Well Mode changed to Drilled and Cased |
| 2016-09-02 | Production Casing Operation Performed |
| 2016-09-04 | Perforation Treatment Performed - Open-Hole Completion |
| 2016-09-04 | Rig Released |
| 2016-12-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-12-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-12-14 | Well Fluid changed to Gas |
| 2016-12-14 | Well Mode changed to Testing |
| 2017-01-12 | Well Began Production |
| 2017-01-12 | Well Fluid changed to Gas |
| 2017-01-12 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2016-08-14 | Trinidad Drilling Ltd. | 418 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2016-08-20 | 2497.10 | Deviate (5 - 79 degrees) |
| 2016-08-25 | 2954.50 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2016-09-04 | Open Hole/Barefoot Completion | 4881.00 | 4889.00 | 0 |
| 2016-12-01 | Multi-Stage Fracture | 4291.50 | 4291.60 | 0 |
| 2016-12-01 | Multi-Stage Fracture | 4221.20 | 4221.30 | 0 |
| 2016-12-01 | Multi-Stage Fracture | 4150.80 | 4150.90 | 0 |
| 2016-12-01 | Multi-Stage Fracture | 4080.40 | 4080.50 | 0 |
| 2016-12-01 | Multi-Stage Fracture | 4010.10 | 4010.20 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 3939.70 | 3939.80 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 3869.80 | 3869.90 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 3799.50 | 3799.60 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 3729.10 | 3729.20 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 3658.70 | 3658.80 | 0 |
| 2016-12-01 | Multi-Stage Fracture | 4844.80 | 4844.90 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 3588.40 | 3588.50 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 3518.60 | 3518.70 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 3448.20 | 3448.30 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 3377.90 | 3378.00 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 3307.50 | 3307.60 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 3237.20 | 3237.30 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 3166.80 | 3166.90 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 3096.50 | 3096.60 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 3026.10 | 3026.20 | 0 |
| 2016-12-02 | Multi-Stage Fracture | 2955.70 | 2955.80 | 0 |
| 2016-12-01 | Multi-Stage Fracture | 4783.50 | 4783.60 | 0 |
| 2016-12-01 | Multi-Stage Fracture | 4713.10 | 4713.20 | 0 |
| 2016-12-01 | Multi-Stage Fracture | 4642.70 | 4642.80 | 0 |
| 2016-12-01 | Multi-Stage Fracture | 4572.40 | 4572.50 | 0 |
| 2016-12-01 | Multi-Stage Fracture | 4502.40 | 4502.50 | 0 |
| 2016-12-01 | Multi-Stage Fracture | 4432.30 | 4432.40 | 0 |
| 2016-12-01 | Multi-Stage Fracture | 4361.90 | 4362.00 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2016-12-01 | 2016-12-02 | 2,793 | 10,284 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 82.5251 | N/A | |||
| Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 15.9537 | N/A | ||
| Sand - Tier 2 (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 1.1227 | N/A | ||
| AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0098 | N/A | |
| 2-mercaptoethanol | 60-24-2 | 100 | 0.0098 | N/A | ||||
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0098 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0098 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0098 | N/A | ||||
| WBO-2 | Trican | Breaker | sodium persulfate | 7775-27-1 | 100 | 0.0213 | N/A | |
| CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1543 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.1543 | N/A | ||||
| FR-18 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0849 | N/A | |
| distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0849 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0849 | N/A | ||||
| GSI-1W | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0451 | N/A | |
| propylene glycol | 57-55-6 | 100 | 0.0451 | N/A | ||||
| PFC-3 | Trican | Surfactant | aminofunctional polymer | 10352 | 100 | 0.0627 | N/A | |
| glycol ether | 10352 | 100 | 0.0627 | N/A | ||||
| petroleum distillates | 10352 | 100 | 0.0627 | N/A | ||||
| silicon compound | 10352 | 100 | 0.0627 | N/A | ||||
| S-17W | Trican | Surfactant | ethylene/propylene oxide polymer | Not Available | 100 | 0.02 | N/A | |
| methanol | 67-56-1 | 100 | 0.02 | N/A | ||||
| water | Not Available | 100 | 0.02 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2016-10-25 | 2016-11-29 | Surface Water - Lake | 9399 |
| 2016-11-20 | 2016-11-20 | Recycled Fracturing Water (treated at well site) | 745 |
| 2016-11-25 | 2016-12-07 | Municipal Water | 94 |
| 2016-12-02 | 2016-12-18 | Municipal Water | 98 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2016 | 48 | 0.0 | 0.0 | 0.0 |
| 2017 | 8374 | 0.0 | 0.0 | 0.0 |
| 2018 | 8043 | 0.0 | 0.0 | 0.0 |
| 2019 | 8371 | 0.0 | 0.0 | 0.0 |
| 2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-09-04 | No Incident Encountered | 0.00 | 0.00 |
| 2016-12-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]