If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524032201002 | |
Location: 00/01-22-052-03W4/2 | |
Location Alias: 00/01-22-52-03 W4M | |
Location Alias 2: 00/01-22-052-03 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 03 | |
Section: 22 | |
County/Municipality: County of Vermilion River | |
Well Name: DAYLIGHT LLOYD 1-22-52-3 | |
Operator Name: Gear Energy Ltd. | |
License Number: 0385812 | |
License Date: 2007-11-27 | |
License Status: Abandoned | |
Spud Date: 2007-12-03 | |
Final Drill Date: 2007-12-06 | |
Well Total Depth: 640.00 m | |
Surface Hole Latitude: 53.498686 | |
Surface Hole Longitude: -110.354110 |
Date | Event |
---|---|
2007-11-27 | Obtained License |
2007-12-04 | Surface Casing Operation Performed |
2007-12-06 | Finished Drilling |
2007-12-06 | Well Mode changed to Drilled and Cased |
2007-12-07 | Production Casing Operation Performed |
2007-12-07 | Well Log Performed |
2007-12-08 | Rig Released |
2007-12-19 | Perforation Treatment Performed - Jet Perforation |
2007-12-19 | Well Log Performed |
2012-03-02 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
2012-03-02 | Perforation Treatment Performed - Jet Perforation |
2012-03-02 | Well Log Performed |
2012-03-04 | Well Began Production |
2012-03-04 | Well Fluid changed to Crude Oil |
2012-03-04 | Well Mode changed to Pumping |
2013-09-09 | Well Log Performed |
2013-09-10 | Perforation Treatment Performed - Jet Perforation |
2013-09-10 | Well Fluid changed to Crude Oil |
2013-09-10 | Well Log Performed |
2013-09-10 | Well Mode changed to Suspended |
2013-10-25 | Perforation Treatment Performed - Cement Squeeze |
2013-10-25 | Plug Back Performed |
2013-10-25 | Well Fluid changed to Crude Oil |
2013-10-25 | Well Mode changed to Abandoned Zone |
2013-10-28 | Perforation Treatment Performed - Jet Perforation |
2017-10-16 | Perforation Treatment Performed - Jet Perforation |
2017-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-10-17 | Plug Back Performed |
2017-10-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-10-18 | Plug Back Performed |
2017-10-27 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-12-19 | Perforation | 491.00 | 493.00 | 26 |
2012-03-02 | Casing Patch | 491.00 | 493.00 | 0 |
2012-03-02 | Perforation | 582.00 | 585.00 | 26 |
2013-09-10 | Perforation | 570.00 | 572.50 | 17 |
2013-10-25 | Cement Squeeze | 582.00 | 585.00 | 0 |
2013-10-28 | Perforation | 525.00 | 527.00 | 17 |
2017-10-16 | Perforation | 491.00 | 493.00 | 17 |
2017-10-17 | Packing Device Capped w/Cement | 515.50 | 523.50 | 0 |
2017-10-18 | Packing Device Capped w/Cement | 481.50 | 489.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1362 | 0.0 | 0.0 | 0.0 |
2013 | 445 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-09-10 | No Incident Encountered | 0.00 | 0.00 |
2013-10-25 | No Incident Encountered | 0.00 | 0.00 |
2013-10-28 | No Incident Encountered | 0.00 | 0.00 |
2017-10-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]