X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524071410023

Well Details

Well ID: 0524071410023
Loading map...
Location: 02/10-14-052-07W4/3
Location Alias: 02/10-14-52-07 W4M
Location Alias 2: 02/10-14-052-07 W4/03
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 07
Section: 14
County/Municipality: County of Vermilion River
Well Name: CALTEX 102 SWIMMING 10-14-52-7
Operator Name: Crew Energy Inc.
License Number: 0422091
License Date: 2010-07-22
License Status: Suspension
Spud Date: 2010-08-25
Final Drill Date: 2010-08-27
Well Total Depth: 635.00 m
Surface Hole Latitude: 53.490635
Surface Hole Longitude: -110.923470

For data sources see[1][2]

Well History

Date Event
2010-07-22 Obtained License
2010-08-26 Surface Casing Operation Performed
2010-08-27 Finished Drilling
2010-08-27 Well Log Performed
2010-08-27 Well Mode changed to Drilled and Cased
2010-08-28 Production Casing Operation Performed
2010-08-28 Rig Released
2010-09-23 Perforation Treatment Performed - Jet Perforation
2011-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-16 Plug Back Performed
2011-02-24 Perforation Treatment Performed - Cement Squeeze
2011-02-24 Perforation Treatment Performed - Jet Perforation
2011-07-20 Perforation Treatment Performed - Jet Perforation
2011-07-22 Perforation Treatment Performed - Cement Squeeze
2011-07-27 Perforation Treatment Performed - Jet Perforation
2012-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-11 Perforation Treatment Performed - Jet Perforation
2012-07-26 Well Began Production
2012-07-26 Well Fluid changed to Crude Oil
2012-07-26 Well Mode changed to Pumping
2013-10-01 Well Fluid changed to Crude Oil
2013-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-09-23 Perforation 595.00 597.00 26
2012-07-11 Perforation 551.00 553.00 26
2011-02-16 Packing Device Capped w/Cement 582.00 590.00 0
2011-02-24 Perforation 175.00 177.00 20
2011-02-24 Cement Squeeze 175.00 177.00 0
2011-07-20 Perforation 172.00 173.00 20
2011-07-22 Cement Squeeze 172.00 173.00 0
2011-07-27 Perforation 565.00 566.20 26
2011-07-27 Perforation 568.00 570.00 26
2012-07-11 Packing Device Capped w/Cement 560.00 563.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1958 0.0 0.0 0.0
2013 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-11 No Incident Encountered 0.00 0.00
2012-07-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References