If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524093104004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.527855,"lon":-111.327392,"icon":""}]} |
Location: 00/04-31-052-09W4/4 | |
Location Alias: 00/04-31-52-09 W4M | |
Location Alias 2: 00/04-31-052-09 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 09 | |
Section: 31 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: CNRL MUSIDORA 4-31-52-9 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0214877 | |
License Date: 1998-05-01 | |
License Status: Suspension | |
Spud Date: 1998-05-21 | |
Final Drill Date: 1998-05-26 | |
Well Total Depth: 770.00 m | |
Surface Hole Latitude: 53.527855 | |
Surface Hole Longitude: -111.327392 |
Date | Event |
---|---|
1998-05-01 | Obtained License |
1998-05-21 | Lost Circulation Occurred |
1998-05-23 | Surface Casing Operation Performed |
1998-05-25 | Well Log Performed |
1998-05-26 | Finished Drilling |
1998-05-26 | Production Casing Operation Performed |
1998-05-26 | Well Mode changed to Drilled and Cased |
1998-05-27 | Rig Released |
1998-06-15 | Perforation Treatment Performed - Jet Perforation |
1998-06-15 | Well Log Performed |
1998-06-17 | Perforation Treatment Performed - Jet Perforation |
1998-06-17 | Well Log Performed |
1999-06-02 | Perforation Treatment Performed - Cement Squeeze |
1999-06-05 | Perforation Treatment Performed - Jet Perforation |
1999-06-05 | Well Log Performed |
1999-08-09 | Perforation Treatment Performed - Cement Squeeze |
1999-08-09 | Plug Back Performed |
1999-08-11 | Perforation Treatment Performed - Jet Perforation |
1999-08-11 | Well Log Performed |
1999-08-11 | Well Mode changed to Drilled and Cased |
2005-06-22 | Perforation Treatment Performed - Jet Perforation |
2005-06-22 | Well Log Performed |
2005-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-06-25 | Perforation Treatment Performed - Jet Perforation |
2005-06-25 | Plug Back Performed |
2005-06-25 | Well Log Performed |
2005-06-29 | Well Log Performed |
2005-06-30 | Perforation Treatment Performed - Jet Perforation |
2005-06-30 | Well Log Performed |
2005-08-01 | Well Began Production |
2005-08-01 | Well Fluid changed to Gas |
2005-08-01 | Well Mode changed to Flowing |
2008-12-31 | Well Fluid changed to Gas |
2008-12-31 | Well Mode changed to Suspended |
2009-05-01 | Well Fluid changed to Gas |
2009-05-01 | Well Mode changed to Flowing |
2009-12-01 | Well Fluid changed to Gas |
2009-12-01 | Well Mode changed to Suspended |
2010-09-01 | Well Fluid changed to Gas |
2010-09-01 | Well Mode changed to Flowing |
2011-03-31 | Well Fluid changed to Gas |
2011-03-31 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-06-15 | Perforation | 699.80 | 700.30 | 2 |
2005-06-25 | Packing Device Capped w/Cement | 685.00 | 693.00 | 0 |
2005-06-25 | Perforation | 596.00 | 597.00 | 17 |
2005-06-30 | Perforation | 551.00 | 553.00 | 17 |
1998-06-15 | Perforation | 699.80 | 700.30 | 20 |
1998-06-17 | Perforation | 676.30 | 678.30 | 20 |
1999-06-02 | Cement Squeeze | 676.30 | 678.30 | 0 |
1999-06-05 | Perforation | 650.10 | 650.30 | 2 |
1999-06-05 | Perforation | 649.80 | 650.80 | 13 |
1999-08-09 | Cement Squeeze | 649.80 | 650.80 | 0 |
1999-08-11 | Perforation | 586.00 | 587.00 | 13 |
2005-06-22 | Perforation | 698.00 | 698.50 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 2524 | 0.0 | 0.0 | 0.0 |
2006 | 314 | 0.0 | 0.0 | 0.0 |
2008 | 2114 | 0.0 | 0.0 | 0.0 |
2009 | 744 | 0.0 | 0.0 | 0.0 |
2010 | 720 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1998-05-21 | Lost Circulation | 85.00 | 113.00 |
For data sources see[6]