X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524102410000

Well Details

Well ID: 0524102410000
Loading map...
Location: 00/10-24-052-10W4/0
Location Alias: 00/10-24-52-10 W4M
Location Alias 2: 00/10-24-052-10 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 10
Section: 24
County/Municipality: County of Minburn No. 27
Well Name: POC MANN 10-24-52-10
Operator Name: Perpetual Operating Corp.
License Number: 0064616
License Date: 1977-07-05
License Status: Abandoned
Spud Date: 1977-07-08
Final Drill Date: 1977-07-12
Well Total Depth: 694.90 m
Surface Hole Latitude: 53.508567
Surface Hole Longitude: -111.335382

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-07-05 Obtained License
1977-07-10 Drill Stem Test Performed
1977-07-12 Drill Stem Test Performed
1977-07-12 Finished Drilling
1977-07-13 Drill Stem Test Performed
1977-07-14 Production Casing Operation Performed
1978-01-03 Well Mode changed to Drilled and Cased
1987-01-22 Perforation Treatment Performed - Jet Perforation
1987-01-23 Perforation Treatment Performed - Jet Perforation
1987-01-27 Perforation Treatment Performed - Jet Perforation
1987-06-01 Well Began Production
1987-06-01 Well Fluid changed to Gas
1987-06-01 Well Mode changed to Flowing
1992-04-01 Well Fluid changed to Gas
1992-04-01 Well Mode changed to Suspended
2001-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-11-10 Perforation Treatment Performed - Cement Squeeze
2001-11-10 Plug Back Performed
2001-11-10 Well Fluid changed to Gas
2001-11-10 Well Log Performed
2001-11-10 Well Mode changed to Abandoned Zone
2001-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-11-14 Perforation Treatment Performed - Jet Perforation
2001-11-14 Plug Back Performed
2001-11-14 Well Log Performed
2001-11-15 Perforation Treatment Performed - Jet Perforation
2001-11-16 Perforation Treatment Performed - Jet Perforation
2017-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-08-19 Plug Back Performed
2017-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-08-20 Perforation Treatment Performed - Jet Perforation
2017-08-20 Plug Back Performed
2017-08-20 Well Log Performed
2017-08-21 Perforation Treatment Performed - Remedial Casing
2017-09-07 Well Abandoned
2017-09-07 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-01-22 Perforation 610.20 613.20 15
2001-11-15 Perforation 595.00 596.00 17
2001-11-15 Perforation 567.00 568.00 17
2001-11-16 Perforation 588.00 593.00 17
2017-08-19 Packing Device Capped w/Cement 572.00 583.00 0
2017-08-20 Packing Device Capped w/Cement 549.00 560.00 0
2017-08-20 Perforation 300.00 301.00 20
2017-08-21 Remedial Casing Cementing 300.00 301.00 0
1987-01-23 Perforation 637.60 640.60 13
1987-01-27 Perforation 526.10 527.60 13
1987-01-27 Perforation 531.00 533.00 13
2001-11-10 Packing Device Capped w/Cement 632.00 634.00 0
2001-11-10 Cement Squeeze 610.20 613.20 0
2001-11-10 Cement Squeeze 526.10 533.00 0
2001-11-14 Perforation 620.50 622.50 17
2001-11-14 Packing Device Capped w/Cement 610.00 618.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 3564 0.0 0.0 0.0
1988 5502 0.0 0.0 0.0
1989 327 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-19 No Incident Encountered 0.00 0.00
2017-08-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References