X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524122315004

Well Details

Well ID: 0524122315004
Loading map...
Location: 00/15-23-052-12W4/4
Location Alias: 00/15-23-52-12 W4M
Location Alias 2: 00/15-23-052-12 W4/04
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 12
Section: 23
County/Municipality: County of Minburn No. 27
Well Name: MONTANE PLAIN 15-23-52-12
Operator Name: Canadian Coyote Energy Ltd.
License Number: 0409417
License Date: 2009-02-24
License Status: Issued
Spud Date: 2009-03-02
Final Drill Date: 2009-03-06
Well Total Depth: 847.00 m
Surface Hole Latitude: 53.511575
Surface Hole Longitude: -111.656174

For data sources see[1][2]

Well History

Date Event
2009-02-24 Obtained License
2009-03-03 Direction Drilling Operation Performed - Deviate
2009-03-03 Surface Casing Operation Performed
2009-03-06 Finished Drilling
2009-03-06 Well Mode changed to Drilled and Cased
2009-03-07 Production Casing Operation Performed
2009-03-07 Rig Released
2009-03-07 Well Log Performed
2009-03-31 Perforation Treatment Performed - Jet Perforation
2009-03-31 Well Log Performed
2009-04-09 Perforation Treatment Performed - Jet Perforation
2009-04-09 Well Log Performed
2010-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-23 Perforation Treatment Performed - Jet Perforation
2010-02-23 Plug Back Performed
2010-02-23 Well Log Performed
2010-03-02 Perforation Treatment Performed - Jet Perforation
2010-03-02 Well Log Performed
2010-03-17 Well Began Production
2010-03-17 Well Fluid changed to Gas
2010-03-17 Well Mode changed to Flowing
2011-02-20 Perforation Treatment Performed - Jet Perforation
2011-02-20 Well Log Performed
2011-03-02 Well Structure changed to Commingled
2019-03-03 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-03-03 134.70 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-03-31 Perforation 832.00 834.00 17
2009-04-09 Perforation 791.50 793.00 17
2009-04-09 Perforation 788.50 789.50 17
2010-02-23 Packing Device Capped w/Cement 822.00 830.00 0
2010-02-23 Packing Device Capped w/Cement 778.00 786.00 0
2010-02-23 Perforation 763.50 766.00 17
2010-02-23 Perforation 761.00 762.00 17
2010-03-02 Perforation 736.50 739.50 17
2011-02-20 Perforation 690.50 691.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6905 0.0 0.0 0.0
2011 1176 0.0 0.0 0.0

For data sources see[6]

References