If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524130202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.457364,"lon":-111.807351,"icon":""}]} |
Location: 00/02-02-052-13W4/0 | |
Location Alias: 00/02-02-52-13 W4M | |
Location Alias 2: 00/02-02-052-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 13 | |
Section: 02 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: PINE CLIFF PLAIN 2-2-52-13 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0085591 | |
License Date: 1980-09-12 | |
License Status: Abandoned | |
Spud Date: 1980-09-26 | |
Final Drill Date: 1980-09-29 | |
Well Total Depth: 775.00 m | |
Surface Hole Latitude: 53.457364 | |
Surface Hole Longitude: -111.807351 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-09-12 | Obtained License |
1980-09-29 | Finished Drilling |
1980-09-30 | Production Casing Operation Performed |
1980-09-30 | Well Mode changed to Drilled and Cased |
1980-11-01 | Perforation Treatment Performed - Jet Perforation |
1982-10-15 | Perforation Treatment Performed - Jet Perforation |
1982-10-16 | Perforation Treatment Performed - Jet Perforation |
1982-10-16 | Well Mode changed to Drilled and Cased |
1982-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-04-01 | Well Began Production |
1983-04-01 | Well Fluid changed to Gas |
1983-04-01 | Well Mode changed to Flowing |
1983-05-01 | Well Fluid changed to Gas |
1983-05-01 | Well Mode changed to Suspended |
1994-03-02 | Perforation Treatment Performed - Jet Perforation |
1994-03-11 | Well Fluid changed to Gas |
1994-03-11 | Well Mode changed to Flowing |
1998-09-01 | Well Fluid changed to Gas |
1998-09-01 | Well Mode changed to Suspended |
2004-01-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-01-06 | Plug Back Performed |
2004-01-06 | Well Fluid changed to Gas |
2004-01-06 | Well Mode changed to Abandoned Zone |
2004-01-07 | Well Log Performed |
2008-12-04 | Perforation Treatment Performed - Jet Perforation |
2008-12-04 | Perforation Treatment Performed - Remedial Casing |
2008-12-04 | Well Log Performed |
2008-12-05 | Perforation Treatment Performed - Jet Perforation |
2008-12-05 | Perforation Treatment Performed - Remedial Casing |
2008-12-05 | Well Log Performed |
2009-07-13 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-11-01 | Perforation | 607.50 | 609.00 | 6 |
1994-03-02 | Perforation | 608.00 | 609.30 | 13 |
2004-01-06 | Packing Device Capped w/Cement | 592.00 | 600.00 | 0 |
2008-12-04 | Perforation | 434.00 | 435.00 | 17 |
2008-12-04 | Remedial Casing Cementing | 434.00 | 435.00 | 0 |
2008-12-05 | Perforation | 254.00 | 255.00 | 17 |
2008-12-05 | Remedial Casing Cementing | 254.00 | 255.00 | 0 |
1980-11-01 | Perforation | 616.80 | 617.50 | 6 |
1982-10-15 | Perforation | 616.50 | 620.00 | 13 |
1982-10-15 | Perforation | 613.00 | 615.50 | 13 |
1982-10-15 | Perforation | 610.50 | 612.00 | 13 |
1982-10-15 | Perforation | 607.50 | 616.50 | 13 |
1982-10-15 | Perforation | 741.50 | 743.50 | 13 |
1982-10-16 | Perforation | 647.00 | 649.00 | 13 |
1982-10-17 | Packing Device Capped w/Cement | 727.00 | 735.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 169 | 0.0 | 0.0 | 0.0 |
1983 | 50 | 0.0 | 0.0 | 0.0 |
1988 | 89 | 0.0 | 0.0 | 0.0 |
1994 | 29 | 0.0 | 0.0 | 0.0 |
For data sources see[5]