If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524131210003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.476289,"lon":-111.783131,"icon":""}]} |
Location: 00/10-12-052-13W4/3 | |
Location Alias: 00/10-12-52-13 W4M | |
Location Alias 2: 00/10-12-052-13 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 13 | |
Section: 12 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: PINE CLIFF PLAIN 10-12-52-13 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0058210 | |
License Date: 1976-05-17 | |
License Status: Suspension | |
Spud Date: 1976-05-19 | |
Final Drill Date: 1976-05-22 | |
Well Total Depth: 806.20 m | |
Surface Hole Latitude: 53.476289 | |
Surface Hole Longitude: -111.783131 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-05-17 | Obtained License |
1976-05-22 | Finished Drilling |
1976-05-22 | Well Mode changed to Drilled and Cased |
1976-05-23 | Drill Stem Test Performed |
1976-05-24 | Production Casing Operation Performed |
1976-06-02 | Well Log Performed |
1976-06-03 | Perforation Treatment Performed - Jet Perforation |
2003-09-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-09-16 | Plug Back Performed |
2003-09-17 | Perforation Treatment Performed - Jet Perforation |
2003-09-17 | Well Log Performed |
2003-09-20 | Perforation Treatment Performed - Fractured |
2003-10-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-10-21 | Plug Back Performed |
2003-10-22 | Perforation Treatment Performed - Jet Perforation |
2003-10-23 | Perforation Treatment Performed - Fractured |
2003-10-29 | Well Began Production |
2003-10-29 | Well Fluid changed to Gas |
2003-10-29 | Well Mode changed to Flowing |
2007-10-01 | Well Fluid changed to Gas |
2007-10-01 | Well Mode changed to Suspended |
2016-06-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-06-28 | Plug Back Performed |
2016-06-28 | Well Fluid changed to Gas |
2016-06-28 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-06-03 | Perforation | 736.10 | 737.00 | 7 |
1976-06-03 | Perforation | 737.00 | 737.30 | 10 |
2003-09-16 | Packing Device Capped w/Cement | 717.00 | 725.00 | 0 |
2003-09-17 | Perforation | 600.50 | 602.30 | 17 |
2003-09-20 | Fracture | 600.50 | 602.30 | 0 |
2003-10-21 | Packing Device Capped w/Cement | 587.00 | 595.00 | 0 |
2003-10-22 | Perforation | 447.40 | 451.10 | 20 |
2003-10-23 | Fracture | 447.40 | 451.10 | 0 |
2016-06-28 | Packing Device Capped w/Cement | 432.00 | 440.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 1512 | 0.0 | 0.0 | 0.0 |
2004 | 7961 | 0.0 | 0.0 | 0.0 |
2005 | 5298 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-06-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]