X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524132510002

Well Details

Well ID: 0524132510002
Loading map...
Location: 00/10-25-052-13W4/2
Location Alias: 00/10-25-52-13 W4M
Location Alias 2: 00/10-25-052-13 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 13
Section: 25
County/Municipality: County of Minburn No. 27
Well Name: TIDEWATER PLAIN 10-25-52-13
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0037603
License Date: 1970-01-16
License Status: Issued
Spud Date: 1970-01-21
Final Drill Date: 1970-01-24
Well Total Depth: 762.30 m
Surface Hole Latitude: 53.522796
Surface Hole Longitude: -111.777961

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-01-16 Obtained License
1970-01-24 Finished Drilling
1970-01-25 Drill Stem Test Performed
1970-01-26 Drill Stem Test Performed
1970-01-26 Production Casing Operation Performed
1970-09-16 Perforation Treatment Performed - Jet Perforation
1970-09-27 Perforation Treatment Performed - Cement Squeeze
1970-09-29 Perforation Treatment Performed - Jet Perforation
1976-02-01 Well Mode changed to Drilled and Cased
1976-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-02-25 Perforation Treatment Performed - Jet Perforation
1976-02-26 Perforation Treatment Performed - Jet Perforation
1976-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-06 Perforation Treatment Performed - Cement Squeeze
1977-02-06 Well Mode changed to Abandoned Zone
1977-02-12 Perforation Treatment Performed - Cement Squeeze
1977-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-16 Perforation Treatment Performed - Jet Perforation
1977-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-09-16 Perforation 737.60 740.10 7
1977-02-16 Perforation 740.70 741.90 7
1977-02-16 Acid Treatment 740.70 741.90 0
1977-02-20 Acid Treatment 740.70 741.90 0
1970-09-27 Cement Squeeze 737.60 740.10 0
1970-09-29 Perforation 735.20 736.70 7
1976-02-25 Packing Device Capped w/Cement 691.90 698.00 0
1976-02-25 Perforation 643.10 645.00 7
1976-02-26 Perforation 656.50 657.80 7
1976-02-27 Acid Treatment 643.10 657.80 0
1977-02-06 Cement Squeeze 643.10 657.80 0
1977-02-12 Cement Squeeze 735.20 736.70 0

For data sources see[4]



References