X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524141110002

Well Details

Well ID: 0524141110002
Loading map...
Location: 00/10-11-052-14W4/2
Location Alias: 00/10-11-52-14 W4M
Location Alias 2: 00/10-11-052-14 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 14
Section: 11
County/Municipality: County of Minburn No. 27
Well Name: OMERS ENERGY WARWICK 10-11-52-14
Operator Name: AlphaBow Energy Ltd.
License Number: 0232737
License Date: 2000-01-27
License Status: Suspension
Spud Date: 2000-02-14
Final Drill Date: 2000-02-16
Well Total Depth: 788.00 m
Surface Hole Latitude: 53.478107
Surface Hole Longitude: -111.950951

For data sources see[1][2]

Well History

Date Event
2000-01-27 Obtained License
2000-02-15 Surface Casing Operation Performed
2000-02-16 Finished Drilling
2000-02-16 Production Casing Operation Performed
2000-02-16 Well Log Performed
2000-02-16 Well Mode changed to Drilled and Cased
2000-02-17 Rig Released
2000-02-21 Perforation Treatment Performed - Jet Perforation
2000-02-22 Perforation Treatment Performed - Jet Perforation
2000-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-23 Plug Back Performed
2000-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-24 Plug Back Performed
2000-02-25 Perforation Treatment Performed - Jet Perforation
2000-02-29 Perforation Treatment Performed - Fractured
2003-01-13 Well Log Performed
2003-01-22 Perforation Treatment Performed - Jet Perforation
2003-01-26 Perforation Treatment Performed - Fractured
2003-01-28 Well Began Production
2003-01-28 Well Fluid changed to Gas
2003-01-28 Well Mode changed to Flowing
2011-11-01 Well Fluid changed to Gas
2011-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-02-21 Perforation 746.00 750.00 13
2000-02-22 Perforation 740.50 742.50 13
2000-02-23 Packing Device Capped w/Cement 737.00 745.00 0
2000-02-24 Packing Device Capped w/Cement 724.00 732.00 0
2000-02-25 Perforation 642.00 651.50 13
2000-02-29 Fracture 642.00 651.50 0
2003-01-22 Perforation 453.00 456.00 14
2003-01-26 Fracture 453.00 456.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 988 0.0 0.0 0.0
2004 844 0.0 0.0 0.0
2005 1165 0.0 0.0 0.0

For data sources see[5]

References