If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524142706002 |
![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() | ||||||||||||||||||||
Location: 00/06-27-052-14W4/2 | |||||||||||||||||||||
Location Alias: 00/06-27-52-14 W4M | |||||||||||||||||||||
Location Alias 2: 00/06-27-052-14 W4/02 | |||||||||||||||||||||
Country: Canada | |||||||||||||||||||||
Province: Alberta | |||||||||||||||||||||
Township: 052 | |||||||||||||||||||||
Meridian: 4 | |||||||||||||||||||||
Range: 14 | |||||||||||||||||||||
Section: 27 | |||||||||||||||||||||
County/Municipality: County of Minburn No. 27 | |||||||||||||||||||||
Well Name: OMERS ENERGY WARWICK 6-27-52-14 | |||||||||||||||||||||
Operator Name: AlphaBow Energy Ltd. | |||||||||||||||||||||
License Number: 0038859 | |||||||||||||||||||||
License Date: 1970-09-24 | |||||||||||||||||||||
License Status: Suspension | |||||||||||||||||||||
Spud Date: 1970-09-25 | |||||||||||||||||||||
Final Drill Date: 1970-09-26 | |||||||||||||||||||||
Well Total Depth: 701.00 m | |||||||||||||||||||||
Surface Hole Latitude: 53.516564 | |||||||||||||||||||||
Surface Hole Longitude: -111.986101 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1970-09-24 | Obtained License |
1970-09-26 | Finished Drilling |
1970-09-26 | Well Mode changed to Drilled and Cased |
1970-09-27 | Drill Stem Test Performed |
1970-09-27 | Production Casing Operation Performed |
1970-10-01 | Perforation Treatment Performed - Acid Wash - No Pressure |
1970-10-01 | Perforation Treatment Performed - Jet Perforation |
1973-03-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1973-03-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-03-09 | Perforation Treatment Performed - Jet Perforation |
1973-03-22 | Well Began Production |
1973-03-22 | Well Fluid changed to Gas |
1973-03-22 | Well Mode changed to Flowing |
1973-10-31 | Well Fluid changed to Gas |
1973-10-31 | Well Mode changed to Suspended |
1977-11-30 | Perforation Treatment Performed - Cement Squeeze |
1977-12-03 | Perforation Treatment Performed - Jet Perforation |
1977-12-07 | Perforation Treatment Performed - Jet Perforation |
1977-12-12 | Perforation Treatment Performed - Jet Perforation |
1997-11-12 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1970-10-01 | Perforation | 668.10 | 671.20 | 7 |
1970-10-01 | Acid Wash | 668.10 | 671.20 | 0 |
1973-03-08 | Packing Device Capped w/Cement | 667.20 | 667.20 | 0 |
1973-03-09 | Perforation | 662.00 | 662.60 | 7 |
1973-03-09 | Acid Treatment | 662.00 | 662.60 | 0 |
1977-11-30 | Cement Squeeze | 668.10 | 671.20 | 0 |
1977-12-03 | Perforation | 662.00 | 662.60 | 7 |
1977-12-07 | Perforation | 629.70 | 630.90 | 7 |
1977-12-12 | Perforation | 568.80 | 570.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1973 | 4634 | 0.0 | 0.0 | 0.0 |
For data sources see[5]