Well ID: 0524192410000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.506821,"lon":-112.666,"icon":""}]} |
Location: 00/10-24-052-19W4/0 | |
Location Alias: 00/10-24-52-19 W4M | |
Location Alias 2: 00/10-24-052-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 19 | |
Section: 24 | |
County/Municipality: Beaver County | |
Well Name: NUL BEAVERHILL LAKE 10-24-52-19 | |
Operator Name: Northwestern Utilities Limited | |
License Number: 0006848 | |
License Date: 1953-07-29 | |
License Status: RecCertified | |
Spud Date: 1953-07-29 | |
Final Drill Date: 1953-08-04 | |
Well Total Depth: 803.10 m | |
Surface Hole Latitude: 53.506821 | |
Surface Hole Longitude: -112.666000 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-07-29 | Obtained License |
1953-08-04 | Drill Stem Test Performed |
1953-08-04 | Finished Drilling |
1953-08-05 | Drill Stem Test Performed |
1953-08-05 | Production Casing Operation Performed |
1953-08-06 | Drill Stem Test Performed |
1953-08-09 | Perforation Treatment Performed - Bullet Perforation |
1953-08-09 | Well Mode changed to Drilled and Cased |
1984-09-19 | Well Log Performed |
1984-09-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-09-20 | Plug Back Performed |
1984-09-20 | Well Abandoned |
1984-09-20 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-08-09 | Bullet Perforation | 791.90 | 793.40 | 13 |
1953-08-09 | Bullet Perforation | 784.60 | 788.20 | 13 |
1953-08-09 | Bullet Perforation | 778.50 | 781.50 | 13 |
1953-08-09 | Bullet Perforation | 763.80 | 766.90 | 13 |
1984-09-20 | Packing Device Capped w/Cement | 725.00 | 790.00 | 0 |
For data sources see[4]