X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524233010020

Well Details

Well ID: 0524233010020
Loading map...
Location: 02/10-30-052-23W4/0
Location Alias: 02/10-30-52-23 W4M
Location Alias 2: 02/10-30-052-23 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 23
Section: 30
County/Municipality: Strathcona County
Well Name: CTCRL MORELAND CHAM 10-30-52-23
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0139690
License Date: 1989-04-27
License Status: RecCertified
Spud Date: 1989-05-20
Final Drill Date: 1989-05-27
Well Total Depth: 1195.00 m
Surface Hole Latitude: 53.524827
Surface Hole Longitude: -113.379558

For data sources see[1][2]

Well History

Date Event
1989-04-27 Obtained License
1989-05-22 Surface Casing Operation Performed
1989-05-23 Direction Drilling Operation Performed - Deviate
1989-05-27 Finished Drilling
1989-05-27 Well Log Performed
1989-05-27 Well Mode changed to Drilled and Cased
1989-05-29 Production Casing Operation Performed
1989-05-29 Rig Released
1989-06-02 Well Log Performed
1989-06-07 Well Log Performed
1989-06-09 Perforation Treatment Performed - Jet Perforation
1989-06-09 Well Log Performed
1989-07-22 Well Began Production
1989-07-22 Well Fluid changed to Crude Oil
1989-07-22 Well Mode changed to Pumping
1990-07-25 Perforation Treatment Performed - Jet Perforation
1990-07-25 Well Log Performed
1991-06-17 Well Fluid changed to Crude Oil
1991-06-17 Well Mode changed to Suspended
1992-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-28 Plug Back Performed
1992-11-28 Well Abandoned
1992-11-28 Well Fluid changed to Crude Oil
1992-11-28 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-05-23 430.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-06-09 Perforation 1161.50 1165.50 13
1990-07-25 Perforation 1159.00 1160.00 13
1992-11-28 Packing Device Capped w/Cement 1142.00 1150.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 3412 0.0 0.0 0.0
1990 8365 0.0 0.0 0.0
1991 2648 0.0 0.0 0.0

For data sources see[6]

References