If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0524233011000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.521421,"lon":-113.383901,"icon":""}]} |
| Location: 00/11-30-052-23W4/0 | |
| Location Alias: 00/11-30-52-23 W4M | |
| Location Alias 2: 00/11-30-052-23 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 052 | |
| Meridian: 4 | |
| Range: 23 | |
| Section: 30 | |
| County/Municipality: Strathcona County | |
| Well Name: IRETON CHAM IN 11-30-52-23 | |
| Operator Name: Legal Oil & Gas Ltd. | |
| License Number: 0005711 | |
| License Date: 1952-11-25 | |
| License Status: RecCertified | |
| Spud Date: 1952-11-26 | |
| Final Drill Date: 1952-12-08 | |
| Well Total Depth: 1140.60 m | |
| Surface Hole Latitude: 53.521421 | |
| Surface Hole Longitude: -113.383901 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1952-11-25 | Obtained License |
| 1952-12-06 | Drill Stem Test Performed |
| 1952-12-07 | Drill Stem Test Performed |
| 1952-12-08 | Finished Drilling |
| 1952-12-08 | Well Mode changed to Drilled and Cased |
| 1952-12-09 | Production Casing Operation Performed |
| 1952-12-11 | Perforation Treatment Performed - Bullet Perforation |
| 1952-12-13 | Perforation Treatment Performed - Cement Squeeze |
| 1952-12-14 | Perforation Treatment Performed - Bullet Perforation |
| 1952-12-16 | Perforation Treatment Performed - Bullet Perforation |
| 1953-02-02 | Well Began Production |
| 1953-02-02 | Well Fluid changed to Crude Oil |
| 1953-02-02 | Well Mode changed to Pumping |
| 1954-07-01 | Perforation Treatment Performed - Cement Squeeze |
| 1954-07-05 | Perforation Treatment Performed - Open-Hole Completion |
| 1954-09-18 | Perforation Treatment Performed - Jet Perforation |
| 1954-10-13 | Well Began Injection |
| 1954-10-13 | Well Fluid changed to Water |
| 1954-10-13 | Well Type changed to Disposal |
| 1955-05-31 | Perforation Treatment Performed - Open-Hole Completion |
| 1955-06-04 | Perforation Treatment Performed - Bullet Perforation |
| 1955-06-04 | Perforation Treatment Performed - Cement Squeeze |
| 1955-06-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1963-01-16 | Well Fluid changed to Water |
| 1963-01-16 | Well Mode changed to Suspended |
| 1963-01-16 | Well Type changed to Disposal |
| 1970-09-11 | Perforation Treatment Performed - Cement Plug |
| 1970-09-19 | Well Abandoned |
| 1970-09-19 | Well Fluid changed to Water |
| 1970-09-19 | Well Mode changed to Abandoned |
| 1970-09-19 | Well Type changed to Disposal |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1952-12-11 | Bullet Perforation | 1121.10 | 1122.30 | 20 |
| 1955-05-31 | Open Hole/Barefoot Completion | 1136.90 | 1140.60 | 0 |
| 1955-06-04 | Cement Squeeze | 1136.90 | 1140.60 | 0 |
| 1955-06-04 | Bullet Perforation | 1126.20 | 1129.30 | 3 |
| 1955-06-04 | Bullet Perforation | 1130.80 | 1133.90 | 3 |
| 1955-06-05 | Acid Treatment | 1126.20 | 1133.90 | 0 |
| 1970-09-11 | Cement Plug | 1082.00 | 1136.90 | 0 |
| 1952-12-11 | Bullet Perforation | 1118.30 | 1119.80 | 20 |
| 1952-12-13 | Cement Squeeze | 1118.30 | 1122.30 | 0 |
| 1952-12-14 | Bullet Perforation | 1121.40 | 1122.00 | 20 |
| 1952-12-16 | Bullet Perforation | 1120.70 | 1121.40 | 20 |
| 1952-12-16 | Bullet Perforation | 1118.60 | 1119.80 | 20 |
| 1954-07-01 | Cement Squeeze | 1118.60 | 1122.00 | 0 |
| 1954-07-05 | Open Hole/Barefoot Completion | 1136.90 | 1139.00 | 0 |
| 1954-09-18 | Perforation | 1137.80 | 1138.70 | 10 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 0 | 0.0 | 0.0 | 0.0 |
| 1968 | 0 | 0.0 | 0.0 | 0.0 |
| 1969 | 0 | 0.0 | 0.0 | 0.0 |
| 1970 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]