X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524250407000

Well Details

Well ID: 0524250407000
Loading map...
Location: 00/07-04-052-25W4/0
Location Alias: 00/07-04-52-25 W4M
Location Alias 2: 00/07-04-052-25 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 25
Section: 04
County/Municipality: Edmonton
Well Name: CEDAR CREEK ARM 7-4-52-25
Operator Name: MAGA Energy Operations Ltd.
License Number: 0002713
License Date: 1951-03-19
License Status: Issued
Spud Date: 1951-03-29
Final Drill Date: 1951-04-23
Well Total Depth: 1252.70 m
Surface Hole Latitude: 53.459568
Surface Hole Longitude: -113.624157

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-03-19 Obtained License
1951-04-10 Drill Stem Test Performed
1951-04-11 Drill Stem Test Performed
1951-04-16 Drill Stem Test Performed
1951-04-19 Drill Stem Test Performed
1951-04-20 Drill Stem Test Performed
1951-04-22 Drill Stem Test Performed
1951-04-23 Finished Drilling
1951-04-23 Well Mode changed to Drilled and Cased
1951-04-24 Production Casing Operation Performed
1951-05-13 Perforation Treatment Performed - Jet Perforation
1951-05-13 Well Began Production
1951-05-13 Well Fluid changed to Crude Oil
1951-05-13 Well Mode changed to Pumping
1951-05-16 Perforation Treatment Performed - Bullet Perforation
1951-05-16 Perforation Treatment Performed - Jet Perforation
1951-11-10 Perforation Treatment Performed - Cement Plug
1996-11-05 Perforation Treatment Performed - Jet Perforation
2008-10-28 Well Fluid changed to Crude Oil
2008-10-28 Well Mode changed to Suspended
2009-02-02 Well Fluid changed to Crude Oil
2009-02-02 Well Mode changed to Pumping
2009-03-24 Perforation Treatment Performed - Chemical Squeeze
2013-02-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-05-13 Perforation 1232.90 1234.40 20
1951-05-16 Bullet Perforation 1234.40 1236.00 13
1951-05-16 Perforation 1234.40 1236.00 13
1951-11-10 Cement Plug 1234.40 1252.70 0
1996-11-05 Perforation 1231.50 1234.00 11
2009-03-24 Chemical Squeeze 1231.50 1234.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5206 0.0 0.0 0.0
1968 6146 0.0 0.0 0.0
1969 5323 0.0 0.0 0.0
1970 6156 0.0 0.0 0.0
1971 6890 0.0 0.0 0.0
1972 7645 0.0 0.0 0.0
1973 8036 0.0 0.0 0.0
1974 8214 0.0 0.0 0.0
1975 8695 0.0 0.0 0.0
1976 8603 0.0 0.0 0.0
1977 8501 0.0 0.0 0.0
1978 8615 0.0 0.0 0.0
1979 7894 0.0 0.0 0.0
1980 8614 0.0 0.0 0.0
1981 7412 0.0 0.0 0.0
1982 8694 0.0 0.0 0.0
1983 8583 0.0 0.0 0.0
1984 8783 0.0 0.0 0.0
1985 8584 0.0 0.0 0.0
1986 8674 0.0 0.0 0.0
1987 8715 0.0 0.0 0.0
1988 8779 0.0 0.0 0.0
1989 8682 0.0 0.0 0.0
1990 8735 0.0 0.0 0.0
1991 8743 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8711 0.0 0.0 0.0
1994 8687 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8443 0.0 0.0 0.0
1999 7399 0.0 0.0 0.0
2000 7539 0.0 0.0 0.0
2001 7424 0.0 0.0 0.0
2002 8413 0.0 0.0 0.0
2003 5985 0.0 0.0 0.0
2004 6217 0.0 0.0 0.0
2005 4867 0.0 0.0 0.0
2006 714 0.0 0.0 0.0
2007 2592 0.0 0.0 0.0
2009 6530 0.0 0.0 0.0
2010 8058 0.0 0.0 0.0
2011 8167 0.0 0.0 0.0
2012 8757 0.0 0.0 0.0
2013 8308 0.0 0.0 0.0
2014 8547 0.0 0.0 0.0
2015 8716 0.0 0.0 0.0
2016 8675 0.0 0.0 0.0
2017 7913 0.0 0.0 0.0
2018 8334 0.0 0.0 0.0
2019 8520 0.0 0.0 0.0
2020 1883 0.0 0.0 0.0

For data sources see[5]

References