X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524251916000

Well Details

Well ID: 0524251916000
Loading map...
Location: 00/16-19-052-25W4/0
Location Alias: 00/16-19-52-25 W4M
Location Alias 2: 00/16-19-052-25 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 25
Section: 19
County/Municipality: Edmonton
Well Name: LEDDY ACHESON EAST 16-19-52-25
Operator Name: Leddy Exploration Limited
License Number: 0014968
License Date: 1958-03-11
License Status: RecCertified
Spud Date: 1958-03-11
Final Drill Date: 1958-03-26
Well Total Depth: 1285.30 m
Surface Hole Latitude: 53.510344
Surface Hole Longitude: -113.667568

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-03-11 Obtained License
1958-03-22 Drill Stem Test Performed
1958-03-24 Drill Stem Test Performed
1958-03-26 Finished Drilling
1958-03-26 Production Casing Operation Performed
1958-04-14 Perforation Treatment Performed - Bullet Perforation
1958-06-13 Well Mode changed to Drilled and Cased
1976-03-01 Perforation Treatment Performed - Jet Perforation
1976-03-02 Perforation Treatment Performed - Acid Wash - No Pressure
1979-09-27 Well Began Production
1979-09-27 Well Fluid changed to Gas
1979-09-27 Well Mode changed to Flowing
1981-01-01 Well Fluid changed to Gas
1981-01-01 Well Mode changed to Suspended
2002-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-25 Plug Back Performed
2002-03-25 Well Fluid changed to Gas
2002-03-25 Well Mode changed to Abandoned Zone
2002-05-03 Well Abandoned
2002-05-03 Well Fluid changed to Gas
2002-05-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-04-14 Bullet Perforation 1213.10 1216.50 20
1976-03-01 Perforation 1220.70 1223.20 13
1976-03-02 Acid Wash 1220.70 1223.20 0
2002-03-25 Packing Device Capped w/Cement 1205.00 1213.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 48 0.0 0.0 0.0

For data sources see[5]

References