X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524253014002

Well Details

Well ID: 0524253014002
Loading map...
Location: 00/14-30-052-25W4/2
Location Alias: 00/14-30-52-25 W4M
Location Alias 2: 00/14-30-052-25 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 25
Section: 30
County/Municipality: Edmonton
Well Name: DUE WEST ACH EAST 14-30-52-25
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0028519
License Date: 1965-07-07
License Status: Abandoned
Spud Date: 1965-07-07
Final Drill Date: 1965-07-15
Well Total Depth: 1277.10 m
Surface Hole Latitude: 53.524879
Surface Hole Longitude: -113.679689

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-07-07 Obtained License
1965-07-15 Finished Drilling
1965-07-16 Production Casing Operation Performed
1965-07-25 Perforation Treatment Performed - Jet Perforation
1965-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-07-29 Perforation Treatment Performed - Cement Squeeze
1965-07-31 Perforation Treatment Performed - Jet Perforation
1966-05-24 Perforation Treatment Performed - Acid Wash - No Pressure
1966-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-01 Perforation Treatment Performed - Fractured
1982-07-28 Perforation Treatment Performed - Jet Perforation
1982-07-28 Well Mode changed to Drilled and Cased
1982-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-25 Perforation Treatment Performed - Fractured
1984-03-07 Well Began Production
1984-03-07 Well Fluid changed to Crude Oil
1984-03-07 Well Mode changed to Flowing
1984-12-06 Well Log Performed
1985-01-01 Well Fluid changed to Crude Oil
1985-01-01 Well Mode changed to Suspended
1985-07-01 Well Fluid changed to Crude Oil
1985-07-01 Well Mode changed to Pumping
1986-01-31 Well Fluid changed to Crude Oil
1986-01-31 Well Mode changed to Suspended
1988-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-24 Perforation Treatment Performed - Cement Squeeze
1988-08-24 Well Fluid changed to Crude Oil
1988-08-24 Well Mode changed to Abandoned Zone
1988-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-27 Perforation Treatment Performed - Cement Squeeze
1988-09-01 Perforation Treatment Performed - Jet Perforation
1988-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-14 Well Log Performed
1994-07-08 Perforation Treatment Performed - Jet Perforation
1996-05-15 Perforation Treatment Performed - Jet Perforation
1996-05-15 Well Log Performed
1996-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-16 Perforation Treatment Performed - Cement Squeeze
1996-05-18 Well Log Performed
1996-06-04 Perforation Treatment Performed - Jet Perforation
1996-06-05 Perforation Treatment Performed - Jet Perforation
1996-06-05 Well Log Performed
1996-06-11 Perforation Treatment Performed - Fractured
1997-02-24 Well Log Performed
2010-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-26 Perforation Treatment Performed - Jet Perforation
2010-08-26 Plug Back Performed
2010-08-26 Well Log Performed
2010-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-04 Plug Back Performed
2010-10-04 Well Log Performed
2010-10-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-07-25 Perforation 1234.10 1235.40 7
1982-07-29 Acid Treatment 1155.80 1157.90 0
1984-02-25 Fracture 1155.80 1157.90 0
1988-08-24 Acid Treatment 1155.80 1157.90 0
1988-08-24 Cement Squeeze 1155.80 1157.90 0
1988-08-27 Acid Treatment 1220.10 1221.60 0
1988-08-27 Cement Squeeze 1220.10 1221.60 0
1988-09-01 Perforation 1245.40 1247.20 13
1988-09-04 Acid Treatment 1245.40 1247.20 0
1994-07-08 Perforation 1245.40 1247.20 13
1996-05-15 Perforation 1253.00 1253.30 99
1965-07-29 Acid Treatment 1234.10 1235.40 0
1996-05-16 Cement Squeeze 1253.00 1253.30 0
1996-05-16 Acid Treatment 1245.40 1247.20 0
1996-05-16 Cement Squeeze 1245.40 1247.20 0
1996-06-04 Perforation 1243.60 1246.00 20
1996-06-05 Perforation 1243.60 1246.00 20
1996-06-11 Fracture 1243.60 1246.00 0
2010-08-26 Packing Device Capped w/Cement 1234.00 1242.00 0
2010-08-26 Perforation 285.00 286.00 13
2010-10-04 Packing Device Capped w/Cement 270.00 278.00 0
1965-07-29 Cement Squeeze 1234.10 1235.40 0
1965-07-31 Perforation 1220.10 1221.60 7
1966-05-24 Acid Wash 1220.10 1221.60 0
1966-05-25 Acid Treatment 1220.10 1221.60 0
1966-10-01 Acid Treatment 1220.10 1221.60 0
1966-10-01 Fracture 1220.10 1221.60 0
1982-07-28 Perforation 1155.80 1157.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 3392 0.0 0.0 0.0
1985 3360 0.0 0.0 0.0
1986 696 0.0 0.0 0.0

For data sources see[5]

References