X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524253108000

Well Details

Well ID: 0524253108000
Loading map...
Location: 00/08-31-052-25W4/0
Location Alias: 00/08-31-52-25 W4M
Location Alias 2: 00/08-31-052-25 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 25
Section: 31
County/Municipality: Edmonton
Well Name: DUE WEST ACH EAST 8-31-52-25
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0027438
License Date: 1964-12-28
License Status: RecCertified
Spud Date: 1965-03-01
Final Drill Date: 1965-03-14
Well Total Depth: 1275.90 m
Surface Hole Latitude: 53.532124
Surface Hole Longitude: -113.667561

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-12-28 Obtained License
1965-03-01 Direction Drilling Operation Performed - 98
1965-03-14 Finished Drilling
1965-03-14 Well Mode changed to Drilled and Cased
1965-03-15 Production Casing Operation Performed
1965-03-21 Perforation Treatment Performed - Bullet Perforation
1965-03-21 Well Began Production
1965-03-21 Well Fluid changed to Crude Oil
1965-03-21 Well Mode changed to Flowing
1965-10-24 Well Fluid changed to Crude Oil
1965-10-24 Well Mode changed to Pumping
1966-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-09 Well Fluid changed to Crude Oil
1966-05-09 Well Mode changed to Flowing
1967-11-30 Well Fluid changed to Crude Oil
1967-11-30 Well Mode changed to Pumping
1984-06-22 Perforation Treatment Performed - Jet Perforation
1984-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-14 Perforation Treatment Performed - Condensate Squeeze
1989-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-10 Perforation Treatment Performed - Chemical Squeeze
1996-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-12-20 Plug Back Performed
1996-12-20 Well Abandoned
1996-12-20 Well Fluid changed to Crude Oil
1996-12-20 Well Log Performed
1996-12-20 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1965-03-01 563.90 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-03-21 Bullet Perforation 1216.80 1218.30 7
1966-05-05 Acid Treatment 1216.80 1218.30 0
1984-06-22 Perforation 1217.10 1218.30 13
1984-06-24 Acid Treatment 1216.80 1218.30 0
1987-01-14 Condensate Squeeze 1216.80 1218.30 0
1989-09-13 Acid Treatment 1216.80 1218.30 0
1990-11-01 Acid Treatment 1216.80 1218.30 0
1993-05-10 Chemical Squeeze 1216.80 1218.30 0
1996-12-20 Packing Device Capped w/Cement 1197.00 1205.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 384 0.0 0.0 0.0
1968 3090 0.0 0.0 0.0
1969 2234 0.0 0.0 0.0
1970 1811 0.0 0.0 0.0
1971 2339 0.0 0.0 0.0
1972 2774 0.0 0.0 0.0
1973 5472 0.0 0.0 0.0
1974 4319 0.0 0.0 0.0
1975 4781 0.0 0.0 0.0
1976 5223 0.0 0.0 0.0
1977 5214 0.0 0.0 0.0
1978 6055 0.0 0.0 0.0
1979 4498 0.0 0.0 0.0
1980 4728 0.0 0.0 0.0
1981 5500 0.0 0.0 0.0
1982 6396 0.0 0.0 0.0
1983 5152 0.0 0.0 0.0
1984 7219 0.0 0.0 0.0
1985 7940 0.0 0.0 0.0
1986 8644 0.0 0.0 0.0
1987 8687 0.0 0.0 0.0
1988 8615 0.0 0.0 0.0
1989 8049 0.0 0.0 0.0
1990 8553 0.0 0.0 0.0
1991 3654 0.0 0.0 0.0
1993 1032 0.0 0.0 0.0

For data sources see[6]

References