X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524260211000

Well Details

Well ID: 0524260211000
Loading map...
Location: 00/11-02-052-26W4/0
Location Alias: 00/11-02-52-26 W4M
Location Alias 2: 00/11-02-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 02
County/Municipality: Stony Plain 135
Well Name: CEDAR CREEK ACHE 11-2-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0252349
License Date: 2001-03-01
License Status: Issued
Spud Date: 2001-03-13
Final Drill Date: 2001-03-16
Well Total Depth: 1372.00 m
Surface Hole Latitude: 53.462290
Surface Hole Longitude: -113.731551

For data sources see[1][2]

Well History

Date Event
2001-03-01 Obtained License
2001-03-14 Surface Casing Operation Performed
2001-03-16 Finished Drilling
2001-03-16 Well Log Performed
2001-03-17 Production Casing Operation Performed
2001-03-17 Rig Released
2001-03-17 Well Mode changed to Drilled and Cased
2001-03-22 Perforation Treatment Performed - Jet Perforation
2001-03-22 Well Log Performed
2001-05-14 Well Began Production
2001-05-14 Well Fluid changed to Crude Oil
2001-05-14 Well Mode changed to Pumping
2001-11-15 Well Fluid changed to Crude Oil
2001-11-15 Well Mode changed to Suspended
2001-12-05 Perforation Treatment Performed - Cement Squeeze
2001-12-05 Plug Back Performed
2001-12-05 Well Fluid changed to Crude Oil
2001-12-05 Well Mode changed to Abandoned Zone
2001-12-07 Perforation Treatment Performed - Jet Perforation
2001-12-08 Perforation Treatment Performed - Jet Perforation
2001-12-08 Well Log Performed
2001-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-11 Plug Back Performed
2001-12-27 Perforation Treatment Performed - Fractured
2011-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-07 Plug Back Performed
2011-09-08 Perforation Treatment Performed - Jet Perforation
2011-09-10 Perforation Treatment Performed - Jet Perforation
2011-09-13 Well Fluid changed to Crude Oil
2011-09-13 Well Mode changed to Pumping
2013-05-28 Perforation Treatment Performed - Chemical Squeeze
2014-06-24 Perforation Treatment Performed - Cement Squeeze
2014-06-24 Plug Back Performed
2014-06-24 Well Fluid changed to Crude Oil
2014-06-24 Well Mode changed to Abandoned Zone
2014-07-02 Perforation Treatment Performed - Jet Perforation
2014-07-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-03-22 Perforation 1280.00 1281.00 14
2011-09-10 Perforation 1278.20 1279.00 10
2013-05-28 Chemical Squeeze 1278.20 1281.00 0
2014-06-24 Cement Squeeze 1278.20 1281.00 0
2014-07-02 Perforation 1343.00 1351.00 14
2014-07-02 Perforation 1339.00 1342.00 20
2014-07-02 Perforation 1343.00 1346.50 20
2001-12-05 Cement Squeeze 1280.00 1281.00 0
2001-12-07 Perforation 1355.50 1358.00 14
2001-12-08 Perforation 1343.00 1346.50 14
2001-12-08 Perforation 1347.50 1351.00 14
2001-12-11 Packing Device Capped w/Cement 1353.50 1354.50 0
2001-12-27 Fracture 1343.00 1351.00 0
2011-09-07 Packing Device Capped w/Cement 1332.00 1340.00 0
2011-09-08 Perforation 1280.00 1281.00 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4274 0.0 0.0 0.0
2011 2495 0.0 0.0 0.0
2012 6984 0.0 0.0 0.0
2013 8441 0.0 0.0 0.0
2014 4070 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-05-28 No Incident Encountered 0.00 0.00
2014-07-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References