X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524260408024

Well Details

Well ID: 0524260408024
Loading map...
Location: 02/08-04-052-26W4/4
Location Alias: 02/08-04-52-26 W4M
Location Alias 2: 02/08-04-052-26 W4/04
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 04
County/Municipality: Stony Plain 135
Well Name: CEDAR CREEK GSPIKE 8-4-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0213987
License Date: 1998-03-03
License Status: Issued
Spud Date: 1998-06-13
Final Drill Date: 1998-06-23
Well Total Depth: 1578.00 m
Surface Hole Latitude: 53.459857
Surface Hole Longitude: -113.767422

For data sources see[1][2]

Well History

Date Event
1998-03-03 Obtained License
1998-06-14 Surface Casing Operation Performed
1998-06-17 Direction Drilling Operation Performed - Deviate
1998-06-23 Finished Drilling
1998-06-23 Lost Circulation Occurred
1998-06-23 Well Log Performed
1998-06-23 Well Mode changed to Drilled and Cased
1998-06-24 Drill Stem Test Performed
1998-06-24 Well Log Performed
1998-06-25 Drill Stem Test Performed
1998-06-25 Lost Circulation Occurred
1998-06-25 Well Log Performed
1998-06-26 Drill Stem Test Performed
1998-06-28 Production Casing Operation Performed
1998-06-28 Rig Released
1998-07-09 Well Log Performed
1998-07-17 Well Log Performed
1998-07-18 Perforation Treatment Performed - Jet Perforation
1998-07-18 Well Log Performed
2001-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-26 Perforation Treatment Performed - Jet Perforation
2001-06-26 Plug Back Performed
2001-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-27 Perforation Treatment Performed - Jet Perforation
2001-06-27 Plug Back Performed
2001-06-28 Plug Back Performed
2011-06-10 Perforation Treatment Performed - Cement Squeeze
2011-06-10 Plug Back Performed
2011-06-13 Perforation Treatment Performed - Jet Perforation
2011-06-15 Perforation Treatment Performed - Jet Perforation
2011-06-22 Perforation Treatment Performed - Fractured
2011-08-15 Well Began Production
2011-08-15 Well Fluid changed to Crude Oil
2011-08-15 Well Mode changed to Pumping
2012-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-11 Plug Back Performed
2012-02-11 Well Fluid changed to Crude Oil
2012-02-11 Well Log Performed
2012-02-11 Well Mode changed to Abandoned Zone
2012-02-12 Perforation Treatment Performed - Jet Perforation
2012-02-13 Perforation Treatment Performed - Jet Perforation
2012-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-11-14 Perforation Treatment Performed - Jet Perforation
2012-11-14 Plug Back Performed
2012-11-16 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-06-17 971.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-07-18 Perforation 1462.00 1465.00 17
2011-06-10 Cement Squeeze 1290.00 1292.00 0
2011-06-13 Perforation 1379.00 1380.00 20
2011-06-13 Perforation 1381.00 1383.00 20
2011-06-13 Perforation 1330.00 1331.00 20
2011-06-13 Perforation 1333.00 1334.00 20
2011-06-13 Perforation 1334.50 1336.00 20
2011-06-15 Perforation 1323.00 1325.00 20
2011-06-22 Fracture 1323.00 1325.00 0
2012-02-11 Packing Device Capped w/Cement 1307.00 1315.00 0
2012-02-12 Perforation 1291.10 1292.50 3
2001-06-26 Packing Device Capped w/Cement 1447.00 1455.00 0
2012-02-13 Perforation 1289.60 1290.80 3
2012-11-14 Packing Device Capped w/Cement 1275.00 1283.00 0
2012-11-14 Perforation 1208.00 1214.00 20
2012-11-16 Fracture 1208.00 1214.00 0
2001-06-26 Perforation 1379.00 1380.00 20
2001-06-26 Perforation 1381.00 1383.00 20
2001-06-26 Perforation 1330.00 1331.00 20
2001-06-26 Perforation 1333.00 1334.00 20
2001-06-26 Perforation 1334.50 1336.00 20
2001-06-27 Packing Device Capped w/Cement 1316.00 1324.00 0
2001-06-27 Perforation 1290.00 1292.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2060 0.0 0.0 0.0
2012 342 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-06-23 Lost Circulation 1578.00 1578.00
1998-06-25 Lost Circulation 1578.00 1578.00
2013-01-15 No Incident Encountered 0.00 0.00

For data sources see[7]

References