X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524261404002

Well Details

Well ID: 0524261404002
Loading map...
Location: 00/04-14-052-26W4/2
Location Alias: 00/04-14-52-26 W4M
Location Alias 2: 00/04-14-052-26 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 14
County/Municipality: Stony Plain 135
Well Name: CHEVRON ACHESON 4-14-52-26
Operator Name: Chevron Canada Limited
License Number: 0022170
License Date: 1962-03-02
License Status: RecExempt
Spud Date: 1962-03-14
Final Drill Date: 1962-03-31
Well Total Depth: 1539.20 m
Surface Hole Latitude: 53.485616
Surface Hole Longitude: -113.735837

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-03-02 Obtained License
1962-03-14 Direction Drilling Operation Performed - 98
1962-03-31 Finished Drilling
1962-03-31 Lost Circulation Occurred
1962-03-31 Well Mode changed to Drilled and Cased
1962-04-01 Drill Stem Test Performed
1962-04-02 Drill Stem Test Performed
1962-04-03 Production Casing Operation Performed
1962-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-04-05 Perforation Treatment Performed - Acid Wash - No Pressure
1962-04-05 Perforation Treatment Performed - Jet Perforation
1979-05-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-05-06 Perforation Treatment Performed - Jet Perforation
1979-05-08 Perforation Treatment Performed - Jet Perforation
1979-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-13 Perforation Treatment Performed - Acid Wash - No Pressure
1979-12-22 Well Began Production
1979-12-22 Well Fluid changed to Crude Oil
1979-12-22 Well Mode changed to Pumping
1980-06-11 Well Fluid changed to Crude Oil
1980-06-11 Well Mode changed to Suspended
1982-01-01 Well Fluid changed to Crude Oil
1982-01-01 Well Mode changed to Pumping
1982-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-05-13 Perforation Treatment Performed - Jet Perforation
1982-05-13 Well Fluid changed to Crude Oil
1982-05-13 Well Mode changed to Abandoned Zone
1997-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-23 Plug Back Performed
1997-09-27 Well Log Performed
1997-11-03 Perforation Treatment Performed - Jet Perforation
1997-11-03 Well Log Performed
1997-11-04 Perforation Treatment Performed - Cement Plug
1997-11-04 Perforation Treatment Performed - Remedial Casing
1997-11-16 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1962-03-14 1417.30 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-04-05 Perforation 1532.50 1534.10 13
1982-05-13 Perforation 1239.60 1241.10 13
1997-09-23 Packing Device Capped w/Cement 1222.00 1230.00 0
1997-11-03 Perforation 988.00 989.00 13
1997-11-04 Remedial Casing Cementing 988.00 989.00 0
1997-11-04 Cement Plug 990.00 990.10 0
1962-04-05 Acid Wash 1532.50 1534.10 0
1962-04-05 Acid Treatment 1532.50 1534.10 0
1979-05-05 Packing Device Capped w/Cement 1524.00 1524.00 0
1979-05-06 Perforation 1449.00 1452.10 7
1979-05-08 Perforation 1439.30 1441.10 13
1979-05-10 Acid Treatment 1439.30 1441.10 0
1979-06-13 Acid Wash 1439.30 1441.10 0
1982-05-12 Packing Device Capped w/Cement 1393.00 1402.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 125 0.0 0.0 0.0
1980 1789 0.0 0.0 0.0
1982 2016 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1962-03-31 Lost Circulation 1538.90 1538.90

For data sources see[7]

References