X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524261413002

Well Details

Well ID: 0524261413002
Loading map...
Location: 00/13-14-052-26W4/2
Location Alias: 00/13-14-52-26 W4M
Location Alias 2: 00/13-14-052-26 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 14
County/Municipality: Stony Plain 135
Well Name: CEDAR CREEK ACH 13-14-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0021476
License Date: 1961-10-06
License Status: Suspension
Spud Date: 1961-10-07
Final Drill Date: 1961-10-18
Well Total Depth: 1548.40 m
Surface Hole Latitude: 53.496282
Surface Hole Longitude: -113.734088

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-10-06 Obtained License
1961-10-18 Finished Drilling
1961-10-18 Well Mode changed to Drilled and Cased
1961-10-19 Production Casing Operation Performed
1961-10-22 Perforation Treatment Performed - Jet Perforation
1961-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-09-12 Perforation Treatment Performed - Jet Perforation
1962-09-13 Perforation Treatment Performed - Cement Squeeze
1980-05-14 Perforation Treatment Performed - Jet Perforation
1980-05-16 Well Began Production
1980-05-16 Well Fluid changed to Crude Oil
1980-05-16 Well Mode changed to Pumping
1980-05-17 Well Fluid changed to Crude Oil
1980-05-17 Well Mode changed to Suspended
1983-05-01 Well Fluid changed to Crude Oil
1983-05-01 Well Mode changed to Flowing
1983-05-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-05-22 Perforation Treatment Performed - Jet Perforation
1983-05-22 Plug Back Performed
1983-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-05-24 Perforation Treatment Performed - Jet Perforation
1983-05-25 Perforation Treatment Performed - Jet Perforation
2005-09-01 Well Fluid changed to Crude Oil
2005-09-01 Well Mode changed to Suspended
2013-03-16 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-10-22 Perforation 1542.30 1543.20 7
1983-05-24 Packing Device Capped w/Cement 1304.20 1311.20 0
1983-05-25 Perforation 1256.30 1258.20 13
1961-10-23 Acid Treatment 1542.30 1543.20 0
1962-09-12 Perforation 1257.00 1258.80 13
1962-09-12 Acid Treatment 1257.00 1258.80 0
1962-09-13 Cement Squeeze 1257.00 1258.80 0
1980-05-14 Perforation 1239.90 1241.80 7
1983-05-22 Packing Device Capped w/Cement 1334.10 1341.10 0
1983-05-22 Perforation 1313.70 1315.50 13
1983-05-24 Perforation 1257.60 1259.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 125 0.0 0.0 0.0
1982 480 0.0 0.0 0.0
1983 5424 0.0 0.0 0.0
1984 8723 0.0 0.0 0.0
1985 8759 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 8567 0.0 0.0 0.0
1988 8783 0.0 0.0 0.0
1989 8735 0.0 0.0 0.0
1990 8683 0.0 0.0 0.0
1991 7930 0.0 0.0 0.0
1992 8596 0.0 0.0 0.0
1993 8215 0.0 0.0 0.0
1994 8719 0.0 0.0 0.0
1995 6519 0.0 0.0 0.0
1996 8703 0.0 0.0 0.0
1997 8340 0.0 0.0 0.0
1998 8175 0.0 0.0 0.0
1999 8479 0.0 0.0 0.0
2000 8386 0.0 0.0 0.0
2001 8097 0.0 0.0 0.0
2002 6408 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References