X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524261414024

Well Details

Well ID: 0524261414024
Loading map...
Location: 02/14-14-052-26W4/4
Location Alias: 02/14-14-52-26 W4M
Location Alias 2: 02/14-14-052-26 W4/04
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 14
County/Municipality: Stony Plain 135
Well Name: CEDAR CREEK ACH 14-14-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0035721
License Date: 1969-01-30
License Status: Suspension
Spud Date: 1969-02-04
Final Drill Date: 1969-02-17
Well Total Depth: 1546.90 m
Surface Hole Latitude: 53.496627
Surface Hole Longitude: -113.730080

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-01-30 Obtained License
1969-02-04 Direction Drilling Operation Performed - 98
1969-02-17 Finished Drilling
1969-02-17 Well Mode changed to Drilled and Cased
1969-02-18 Production Casing Operation Performed
1969-03-02 Perforation Treatment Performed - Acid Wash - No Pressure
1969-03-02 Perforation Treatment Performed - Jet Perforation
1980-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-02-15 Perforation Treatment Performed - Jet Perforation
1980-02-17 Perforation Treatment Performed - Jet Perforation
1986-11-03 Perforation Treatment Performed - Jet Perforation
1994-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-23 Plug Back Performed
1994-06-24 Perforation Treatment Performed - Jet Perforation
1994-06-25 Perforation Treatment Performed - Fractured
2009-01-08 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2009-01-08 Plug Back Performed
2009-01-08 Well Log Performed
2009-01-10 Perforation Treatment Performed - Jet Perforation
2009-01-10 Well Log Performed
2009-01-12 Perforation Treatment Performed - Fractured
2009-02-02 Well Began Production
2009-02-02 Well Fluid changed to Crude Oil
2009-02-02 Well Mode changed to Pumping
2017-07-21 Well Fluid changed to Crude Oil
2017-07-21 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1969-02-04 1348.70 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-03-02 Perforation 1537.10 1537.70 13
1994-06-25 Fracture 1243.50 1249.00 0
2009-01-08 Packing Dev Cpd w/Res-Gyp Cem 1252.00 1255.00 0
2009-01-10 Perforation 1223.50 1225.00 17
2009-01-12 Fracture 1223.50 1225.00 0
1969-03-02 Acid Wash 1537.10 1537.70 0
1980-02-14 Packing Device Capped w/Cement 1510.40 1516.40 0
1980-02-15 Perforation 1256.70 1258.80 13
1980-02-17 Perforation 1256.70 1258.80 13
1986-11-03 Perforation 1256.70 1258.80 13
1986-11-03 Perforation 1309.70 1311.80 13
1994-06-23 Packing Device Capped w/Cement 1292.00 1300.00 0
1994-06-24 Perforation 1243.50 1249.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 7455 0.0 0.0 0.0
2010 8444 0.0 0.0 0.0
2011 8574 0.0 0.0 0.0
2012 8708 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8354 0.0 0.0 0.0
2015 336 0.0 0.0 0.0

For data sources see[6]

References