X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524261601000

Well Details

Well ID: 0524261601000
Loading map...
Location: 00/01-16-052-26W4/0
Location Alias: 00/01-16-52-26 W4M
Location Alias 2: 00/01-16-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 16
County/Municipality: Stony Plain 135
Well Name: CEDAR CREEK GSPIKE 1-16-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0021171
License Date: 1961-08-08
License Status: Abandoned
Spud Date: 1961-08-15
Final Drill Date: 1994-07-27
Well Total Depth: 1558.00 m
Surface Hole Latitude: 53.484974
Surface Hole Longitude: -113.765738

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-08-08 Obtained License
1961-09-01 Well Mode changed to Drilled and Cased
1961-09-02 Drill Stem Test Performed
1961-09-03 Production Casing Operation Performed
1961-09-05 Perforation Treatment Performed - Open-Hole Completion
1961-09-15 Well Began Production
1961-09-15 Well Fluid changed to Crude Oil
1961-09-15 Well Mode changed to Flowing
1977-04-05 Perforation Treatment Performed - Jet Perforation
1977-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-09 Well Fluid changed to Crude Oil
1980-07-09 Well Mode changed to Pumping
1982-05-07 Well Fluid changed to Crude Oil
1982-05-07 Well Mode changed to Suspended
1982-09-23 Well Fluid changed to Crude Oil
1982-09-23 Well Mode changed to Pumping
1985-10-01 Well Fluid changed to Crude Oil
1985-10-01 Well Mode changed to Suspended
1994-03-22 Well Fluid changed to Crude Oil
1994-03-22 Well Mode changed to Pumping
1994-07-27 Finished Drilling
1994-07-27 Perforation Treatment Performed - Cement Squeeze
1994-07-27 Perforation Treatment Performed - Open-Hole Completion
1994-07-28 Perforation Treatment Performed - Jet Perforation
1995-09-16 Perforation Treatment Performed - Bridge Plug No Cement Required
1995-09-16 Perforation Treatment Performed - Jet Perforation
1995-09-16 Well Fluid changed to Crude Oil
1995-09-16 Well Mode changed to Abandoned Zone
1995-10-22 Perforation Treatment Performed - Jet Perforation
1995-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-06 Plug Back Performed
1996-10-07 Perforation Treatment Performed - Jet Perforation
2014-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-08-10 Perforation Treatment Performed - Cement Squeeze
2014-08-10 Perforation Treatment Performed - Jet Perforation
2014-08-10 Plug Back Performed
2014-08-10 Well Log Performed
2014-08-11 Perforation Treatment Performed - Remedial Casing
2014-08-12 Perforation Treatment Performed - Remedial Casing
2014-08-22 Well Log Performed
2014-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-09-04 Perforation Treatment Performed - Jet Perforation
2014-09-04 Well Log Performed
2014-09-05 Perforation Treatment Performed - Jet Perforation
2014-09-05 Perforation Treatment Performed - Remedial Casing
2014-09-05 Well Log Performed
2014-09-06 Perforation Treatment Performed - Cement Plug
2014-09-06 Perforation Treatment Performed - Remedial Casing
2014-09-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-09-05 Open Hole/Barefoot Completion 1550.50 1553.60 0
1995-10-22 Perforation 1297.00 1298.00 17
1995-10-23 Acid Treatment 1292.00 1298.00 0
1996-10-06 Packing Device Capped w/Cement 1264.30 1272.30 0
1996-10-07 Perforation 1044.00 1048.00 14
2014-08-10 Acid Treatment 1044.00 1048.00 0
2014-08-10 Cement Squeeze 1044.00 1048.00 0
2014-08-10 Packing Device Capped w/Cement 1027.00 1040.00 0
2014-08-10 Perforation 517.00 519.00 13
2014-08-10 Perforation 306.50 308.50 13
2014-08-11 Remedial Casing Cementing 517.00 519.00 0
1977-04-05 Perforation 1552.00 1553.30 13
2014-08-12 Remedial Casing Cementing 306.50 308.50 0
2014-09-04 Packing Device Capped w/Cement 500.00 510.00 0
2014-09-04 Packing Device Capped w/Cement 286.00 296.00 0
2014-09-04 Perforation 258.00 260.00 13
2014-09-05 Remedial Casing Cementing 258.00 260.00 0
2014-09-05 Perforation 210.50 212.50 13
2014-09-06 Remedial Casing Cementing 210.50 212.50 0
2014-09-06 Cement Plug 64.00 212.50 0
1977-04-06 Acid Treatment 1550.50 1553.60 0
1994-07-27 Cement Squeeze 1550.50 1553.60 0
1994-07-27 Open Hole/Barefoot Completion 1550.50 1558.00 0
1994-07-28 Perforation 1556.00 1557.00 17
1995-09-16 Bridge Plug, No Cement 1500.00 1500.30 0
1995-09-16 Perforation 1322.70 1324.30 17
1995-10-22 Perforation 1292.00 1294.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1249 0.0 0.0 0.0
1968 1201 0.0 0.0 0.0
1969 2469 0.0 0.0 0.0
1970 3771 0.0 0.0 0.0
1971 3876 0.0 0.0 0.0
1972 5192 0.0 0.0 0.0
1973 7584 0.0 0.0 0.0
1974 8010 0.0 0.0 0.0
1975 5576 0.0 0.0 0.0
1976 5193 0.0 0.0 0.0
1977 4671 0.0 0.0 0.0
1978 4263 0.0 0.0 0.0
1979 8075 0.0 0.0 0.0
1980 8393 0.0 0.0 0.0
1981 8177 0.0 0.0 0.0
1982 5208 0.0 0.0 0.0
1983 7403 0.0 0.0 0.0
1984 8430 0.0 0.0 0.0
1985 5861 0.0 0.0 0.0
1994 3160 0.0 0.0 0.0
1995 1452 0.0 0.0 0.0
1996 2016 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-10-09 No Incident Encountered 0.00 0.00
2014-09-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References