If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0524262116002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.509963,"lon":-113.765723,"icon":""}]} |
| Location: 00/16-21-052-26W4/2 | |
| Location Alias: 00/16-21-52-26 W4M | |
| Location Alias 2: 00/16-21-052-26 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 052 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 21 | |
| County/Municipality: Stony Plain 135 | |
| Well Name: CEDAR CREEK ACH 16-21-52-26 | |
| Operator Name: MAGA Energy Operations Ltd. | |
| License Number: 0009479 | |
| License Date: 1955-05-20 | |
| License Status: Suspension | |
| Spud Date: 1955-05-30 | |
| Final Drill Date: 1955-06-27 | |
| Well Total Depth: 1600.80 m | |
| Surface Hole Latitude: 53.509963 | |
| Surface Hole Longitude: -113.765723 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1955-05-20 | Obtained License |
| 1955-06-08 | Drill Stem Test Performed |
| 1955-06-15 | Drill Stem Test Performed |
| 1955-06-23 | Drill Stem Test Performed |
| 1955-06-27 | Drill Stem Test Performed |
| 1955-06-27 | Finished Drilling |
| 1955-06-29 | Production Casing Operation Performed |
| 1958-03-03 | Perforation Treatment Performed - Bullet Perforation |
| 1958-03-08 | Well Mode changed to Drilled and Cased |
| 1964-05-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1964-08-26 | Well Began Production |
| 1964-08-26 | Well Fluid changed to Gas |
| 1964-08-26 | Well Mode changed to Flowing |
| 1973-03-13 | Well Fluid changed to Gas |
| 1973-03-13 | Well Mode changed to Suspended |
| 1973-05-04 | Perforation Treatment Performed - Cement Squeeze |
| 1973-05-04 | Well Fluid changed to Gas |
| 1973-05-04 | Well Mode changed to Suspended |
| 1996-09-22 | Well Fluid changed to Gas |
| 1996-09-22 | Well Mode changed to Suspended |
| 2010-12-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-12-05 | Plug Back Performed |
| 2010-12-05 | Well Fluid changed to Gas |
| 2010-12-05 | Well Mode changed to Abandoned Zone |
| 2010-12-08 | Perforation Treatment Performed - Cement Plug |
| 2010-12-08 | Perforation Treatment Performed - Jet Perforation |
| 2010-12-08 | Plug Back Performed |
| 2010-12-09 | Perforation Treatment Performed - Cement Plug |
| 2010-12-09 | Perforation Treatment Performed - Jet Perforation |
| 2010-12-09 | Plug Back Performed |
| 2010-12-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-12-10 | Perforation Treatment Performed - Jet Perforation |
| 2010-12-10 | Plug Back Performed |
| 2010-12-11 | Perforation Treatment Performed - Cement Squeeze |
| 2010-12-11 | Plug Back Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1958-03-03 | Bullet Perforation | 1273.10 | 1273.80 | 13 |
| 2010-12-08 | Perforation | 600.00 | 600.50 | 20 |
| 2010-12-08 | Cement Plug | 575.90 | 645.30 | 0 |
| 2010-12-09 | Perforation | 545.00 | 545.50 | 20 |
| 2010-12-09 | Perforation | 515.00 | 515.50 | 20 |
| 2010-12-09 | Cement Plug | 478.00 | 570.10 | 0 |
| 2010-12-10 | Perforation | 371.00 | 372.00 | 20 |
| 2010-12-10 | Packing Device Capped w/Cement | 356.00 | 364.00 | 0 |
| 2010-12-10 | Perforation | 341.00 | 342.00 | 20 |
| 2010-12-11 | Cement Squeeze | 341.00 | 342.00 | 0 |
| 1958-03-03 | Bullet Perforation | 1268.60 | 1269.80 | 13 |
| 1958-03-03 | Bullet Perforation | 1262.50 | 1265.50 | 13 |
| 1958-03-03 | Bullet Perforation | 1255.20 | 1257.00 | 13 |
| 1958-03-03 | Bullet Perforation | 1046.10 | 1047.90 | 13 |
| 1964-05-20 | Acid Treatment | 1255.20 | 1273.80 | 0 |
| 1973-05-04 | Cement Squeeze | 1255.20 | 1273.80 | 0 |
| 2010-12-05 | Packing Device Capped w/Cement | 1020.00 | 1028.00 | 0 |
| 2010-12-08 | Perforation | 625.00 | 625.50 | 20 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 672 | 0.0 | 0.0 | 0.0 |
| 1968 | 960 | 0.0 | 0.0 | 0.0 |
| 1969 | 2424 | 0.0 | 0.0 | 0.0 |
| 1970 | 7704 | 0.0 | 0.0 | 0.0 |
| 1971 | 5401 | 0.0 | 0.0 | 0.0 |
For data sources see[5]