If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0524262206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.502777,"lon":-113.752184,"icon":""}]} |
| Location: 00/06-22-052-26W4/0 | |
| Location Alias: 00/06-22-52-26 W4M | |
| Location Alias 2: 00/06-22-052-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 052 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 22 | |
| County/Municipality: Stony Plain 135 | |
| Well Name: CHEVRON ACHESON IN 6-22-52-26 | |
| Operator Name: Chevron Canada Limited | |
| License Number: 0006513 | |
| License Date: 1953-05-30 | |
| License Status: RecExempt | |
| Spud Date: 1953-09-07 | |
| Final Drill Date: 1953-10-03 | |
| Well Total Depth: 1667.60 m | |
| Surface Hole Latitude: 53.502777 | |
| Surface Hole Longitude: -113.752184 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1953-05-30 | Obtained License |
| 1953-09-16 | Drill Stem Test Performed |
| 1953-09-18 | Drill Stem Test Performed |
| 1953-09-24 | Drill Stem Test Performed |
| 1953-10-03 | Drill Stem Test Performed |
| 1953-10-03 | Finished Drilling |
| 1953-10-03 | Well Mode changed to Drilled and Cased |
| 1953-10-04 | Drill Stem Test Performed |
| 1953-10-05 | Production Casing Operation Performed |
| 1953-10-07 | Perforation Treatment Performed - Open-Hole Completion |
| 1953-10-07 | Well Began Injection |
| 1953-10-07 | Well Fluid changed to Water |
| 1953-10-07 | Well Type changed to Disposal |
| 1957-09-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1961-11-30 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1962-05-12 | Perforation Treatment Performed - Open-Hole Completion |
| 1968-05-02 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1968-05-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-06-15 | Well Fluid changed to Water |
| 1988-06-15 | Well Mode changed to Suspended |
| 1988-06-15 | Well Type changed to Disposal |
| 1996-03-21 | Well Fluid changed to Water |
| 1996-03-21 | Well Mode changed to Closed |
| 1996-03-21 | Well Type changed to Disposal |
| 1996-07-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-07-21 | Plug Back Performed |
| 1996-07-21 | Well Fluid changed to Water |
| 1996-07-21 | Well Mode changed to Abandoned Zone |
| 1996-07-21 | Well Type changed to Disposal |
| 1996-07-22 | Well Log Performed |
| 1996-11-08 | Well Log Performed |
| 1996-11-18 | Perforation Treatment Performed - Cement Plug |
| 1996-11-18 | Plug Back Performed |
| 1996-11-19 | Perforation Treatment Performed - Cement Plug |
| 1996-11-19 | Perforation Treatment Performed - Jet Perforation |
| 1996-11-19 | Plug Back Performed |
| 1996-11-19 | Well Log Performed |
| 1996-11-20 | Perforation Treatment Performed - Remedial Casing |
| 1996-11-22 | Well Abandoned |
| 1996-11-22 | Well Fluid changed to Water |
| 1996-11-22 | Well Mode changed to Abandoned |
| 1996-11-22 | Well Type changed to Disposal |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1953-10-07 | Open Hole/Barefoot Completion | 1606.60 | 1667.60 | 0 |
| 1996-11-19 | Perforation | 400.00 | 401.00 | 14 |
| 1996-11-20 | Remedial Casing Cementing | 400.00 | 401.00 | 0 |
| 1957-09-05 | Acid Treatment | 1606.60 | 1667.60 | 0 |
| 1961-11-30 | Acid Wash | 1606.60 | 1667.60 | 0 |
| 1962-05-12 | Open Hole/Barefoot Completion | 1606.60 | 1657.20 | 0 |
| 1968-05-02 | Acid Wash | 1646.50 | 1657.20 | 0 |
| 1968-05-03 | Acid Treatment | 1606.60 | 1646.50 | 0 |
| 1996-07-21 | Packing Device Capped w/Cement | 1577.00 | 1589.00 | 0 |
| 1996-11-18 | Cement Plug | 725.00 | 1576.00 | 0 |
| 1996-11-19 | Cement Plug | 717.00 | 725.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 0 | 0.0 | 0.0 | 0.0 |
| 1968 | 0 | 0.0 | 0.0 | 0.0 |
| 1969 | 0 | 0.0 | 0.0 | 0.0 |
| 1970 | 0 | 0.0 | 0.0 | 0.0 |
| 1971 | 0 | 0.0 | 0.0 | 0.0 |
| 1972 | 0 | 0.0 | 0.0 | 0.0 |
| 1973 | 0 | 0.0 | 0.0 | 0.0 |
| 1974 | 0 | 0.0 | 0.0 | 0.0 |
| 1975 | 0 | 0.0 | 0.0 | 0.0 |
| 1976 | 0 | 0.0 | 0.0 | 0.0 |
| 1977 | 0 | 0.0 | 0.0 | 0.0 |
| 1978 | 0 | 0.0 | 0.0 | 0.0 |
| 1979 | 0 | 0.0 | 0.0 | 0.0 |
| 1980 | 0 | 0.0 | 0.0 | 0.0 |
| 1981 | 0 | 0.0 | 0.0 | 0.0 |
| 1982 | 0 | 0.0 | 0.0 | 0.0 |
| 1983 | 0 | 0.0 | 0.0 | 0.0 |
| 1984 | 0 | 0.0 | 0.0 | 0.0 |
| 1985 | 0 | 0.0 | 0.0 | 0.0 |
| 1986 | 0 | 0.0 | 0.0 | 0.0 |
| 1987 | 0 | 0.0 | 0.0 | 0.0 |
| 1988 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]