X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262208000

Well Details

Well ID: 0524262208000
Loading map...
Location: 00/08-22-052-26W4/0
Location Alias: 00/08-22-52-26 W4M
Location Alias 2: 00/08-22-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 22
County/Municipality: Stony Plain 135
Well Name: CEDAR CREEK ACH 8-22-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0003486
License Date: 1951-09-15
License Status: Issued
Spud Date: 1951-09-16
Final Drill Date: 1951-10-16
Well Total Depth: 1589.00 m
Surface Hole Latitude: 53.503072
Surface Hole Longitude: -113.740200

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-09-15 Obtained License
1951-09-22 Drill Stem Test Performed
1951-09-27 Drill Stem Test Performed
1951-10-02 Drill Stem Test Performed
1951-10-12 Production Casing Operation Performed
1951-10-16 Finished Drilling
1951-10-16 Well Mode changed to Drilled and Cased
1951-10-17 Perforation Treatment Performed - Open-Hole Completion
1951-10-17 Well Began Production
1951-10-17 Well Fluid changed to Crude Oil
1951-10-17 Well Mode changed to Flowing
1969-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1969-02-13 Well Fluid changed to Crude Oil
1969-02-13 Well Mode changed to Abandoned Zone
1969-02-15 Perforation Treatment Performed - Jet Perforation
1972-05-31 Perforation Treatment Performed - Open-Hole Completion
1972-06-02 Well Fluid changed to Crude Oil
1972-06-02 Well Mode changed to Flowing
1975-02-04 Perforation Treatment Performed - Cement Plug
1975-02-04 Perforation Treatment Performed - Open-Hole Completion
1979-07-13 Well Fluid changed to Crude Oil
1979-07-13 Well Mode changed to Pumping
1985-10-23 Well Fluid changed to Crude Oil
1985-10-23 Well Mode changed to Suspended
1986-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-03-12 Plug Back Performed
1986-03-12 Well Fluid changed to Crude Oil
1986-03-12 Well Mode changed to Abandoned Zone
1989-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-18 Perforation Treatment Performed - Open-Hole Completion
1993-04-18 Well Fluid changed to Crude Oil
1993-04-18 Well Mode changed to Suspended
1993-04-19 Well Log Performed
1996-04-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-12 Plug Back Performed
1996-04-12 Well Fluid changed to Crude Oil
1996-04-12 Well Log Performed
1996-04-12 Well Mode changed to Abandoned Zone
1996-04-13 Perforation Treatment Performed - Jet Perforation
1996-04-13 Well Log Performed
2006-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-18 Plug Back Performed
2006-10-18 Well Log Performed
2006-10-19 Perforation Treatment Performed - Jet Perforation
2006-10-19 Well Log Performed
2006-10-21 Perforation Treatment Performed - Remedial Casing
2006-10-23 Perforation Treatment Performed - Jet Perforation
2006-10-23 Well Log Performed
2006-11-07 Perforation Treatment Performed - Fractured
2007-07-04 Well Log Performed
2007-07-05 Perforation Treatment Performed - Cement Squeeze
2007-07-05 Plug Back Performed
2007-07-13 Perforation Treatment Performed - Jet Perforation
2007-07-16 Perforation Treatment Performed - Cement Squeeze
2007-07-20 Perforation Treatment Performed - Jet Perforation
2007-07-20 Well Log Performed
2007-07-23 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-10-17 Open Hole/Barefoot Completion 1539.80 1550.20 0
1996-04-12 Packing Device Capped w/Cement 1529.00 1537.00 0
1996-04-13 Perforation 1248.00 1250.00 14
2006-10-18 Packing Device Capped w/Cement 1232.00 1240.00 0
2006-10-19 Perforation 1075.00 1076.00 13
2006-10-19 Perforation 900.00 901.00 13
2006-10-21 Remedial Casing Cementing 1075.00 1076.00 0
2006-10-21 Remedial Casing Cementing 900.00 901.00 0
2006-10-23 Perforation 1033.00 1036.00 13
2006-11-07 Fracture 1033.00 1036.00 0
2007-07-05 Cement Squeeze 1033.00 1036.00 0
1969-02-13 Packing Device Capped w/Cement 1261.90 1266.40 0
2007-07-13 Perforation 1250.60 1257.70 10
2007-07-13 Perforation 1248.00 1250.00 14
2007-07-16 Cement Squeeze 1248.00 1251.70 0
2007-07-20 Perforation 1233.50 1236.50 17
2007-07-23 Fracture 1233.50 1236.50 0
1969-02-15 Perforation 1250.60 1252.70 10
1972-05-31 Open Hole/Barefoot Completion 1539.80 1550.20 0
1975-02-04 Cement Plug 1543.50 1550.20 0
1975-02-04 Open Hole/Barefoot Completion 1539.80 1543.50 0
1986-03-12 Packing Device Capped w/Cement 1522.00 1522.00 0
1989-01-19 Acid Treatment 1250.60 1252.70 0
1993-04-18 Open Hole/Barefoot Completion 1539.80 1589.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2535 0.0 0.0 0.0
1968 1919 0.0 0.0 0.0
1972 3304 0.0 0.0 0.0
1973 4476 0.0 0.0 0.0
1974 6889 0.0 0.0 0.0
1975 8150 0.0 0.0 0.0
1976 7083 0.0 0.0 0.0
1977 6827 0.0 0.0 0.0
1978 7429 0.0 0.0 0.0
1979 7255 0.0 0.0 0.0
1980 8067 0.0 0.0 0.0
1981 8656 0.0 0.0 0.0
1982 7961 0.0 0.0 0.0
1983 8022 0.0 0.0 0.0
1984 7903 0.0 0.0 0.0
1985 6794 0.0 0.0 0.0

For data sources see[5]

References