X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262214000

Well Details

Well ID: 0524262214000
Loading map...
Location: 00/14-22-052-26W4/0
Location Alias: 00/14-22-52-26 W4M
Location Alias 2: 00/14-22-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 22
County/Municipality: Stony Plain 135
Well Name: CHEVRON ACHESON 14-22L-52-26
Operator Name: Chevron Canada Limited
License Number: 0007138
License Date: 1953-10-02
License Status: RecExempt
Spud Date: 1953-10-10
Final Drill Date: 1953-11-02
Well Total Depth: 1558.40 m
Surface Hole Latitude: 53.510258
Surface Hole Longitude: -113.752179

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-10-02 Obtained License
1953-10-22 Drill Stem Test Performed
1953-10-31 Production Casing Operation Performed
1953-11-02 Finished Drilling
1953-11-02 Perforation Treatment Performed - Open-Hole Completion
1953-11-02 Well Mode changed to Drilled and Cased
1953-11-05 Well Began Production
1953-11-05 Well Fluid changed to Crude Oil
1953-11-05 Well Mode changed to Flowing
1962-05-08 Well Fluid changed to Crude Oil
1962-05-08 Well Mode changed to Pumping
1984-02-22 Well Fluid changed to Crude Oil
1984-02-22 Well Mode changed to Suspended
1996-05-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-10 Plug Back Performed
1996-05-10 Well Fluid changed to Crude Oil
1996-05-10 Well Mode changed to Abandoned Zone
1996-05-11 Perforation Treatment Performed - Jet Perforation
1996-05-11 Well Log Performed
1996-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-22 Plug Back Performed
1997-09-22 Well Log Performed
1997-11-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-11-02 Open Hole/Barefoot Completion 1556.90 1558.40 0
1996-05-10 Packing Device Capped w/Cement 1541.00 1549.00 0
1996-05-11 Perforation 1253.30 1255.00 13
1996-05-12 Acid Treatment 1253.30 1255.00 0
1997-09-22 Packing Device Capped w/Cement 1230.00 1238.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0

For data sources see[5]

References