X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262215002

Well Details

Well ID: 0524262215002
Loading map...
Location: 00/15-22-052-26W4/2
Location Alias: 00/15-22-52-26 W4M
Location Alias 2: 00/15-22-052-26 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 22
County/Municipality: Stony Plain 135
Well Name: CEDAR CREEK ACH 15-22-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0005144
License Date: 1952-08-15
License Status: Suspension
Spud Date: 1952-08-19
Final Drill Date: 1952-09-14
Well Total Depth: 1556.00 m
Surface Hole Latitude: 53.510268
Surface Hole Longitude: -113.747254

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-08-15 Obtained License
1952-08-30 Drill Stem Test Performed
1952-09-02 Drill Stem Test Performed
1952-09-05 Drill Stem Test Performed
1952-09-06 Drill Stem Test Performed
1952-09-12 Drill Stem Test Performed
1952-09-14 Finished Drilling
1952-09-14 Well Mode changed to Drilled and Cased
1952-09-15 Perforation Treatment Performed - Open-Hole Completion
1952-09-15 Production Casing Operation Performed
1978-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-21 Perforation Treatment Performed - Cement Squeeze
1980-01-24 Perforation Treatment Performed - Jet Perforation
1980-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-24 Plug Back Performed
1991-10-24 Well Log Performed
1991-10-26 Perforation Treatment Performed - Jet Perforation
1991-10-26 Well Log Performed
1991-11-17 Well Began Production
1991-11-17 Well Fluid changed to Gas
1991-11-17 Well Mode changed to Flowing
2000-01-01 Well Fluid changed to Gas
2000-01-01 Well Mode changed to Suspended
2002-01-14 Perforation Treatment Performed - Chemical Squeeze
2006-08-21 Perforation Treatment Performed - Fractured
2007-06-12 Well Fluid changed to Crude Oil
2007-06-12 Well Mode changed to Pumping
2014-01-01 Well Fluid changed to Crude Oil
2014-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-09-15 Open Hole/Barefoot Completion 1551.40 1556.00 0
1978-09-28 Acid Treatment 1551.40 1556.00 0
1980-01-21 Cement Squeeze 1551.40 1552.70 0
1980-01-24 Perforation 1552.10 1552.80 6
1980-01-26 Acid Treatment 1552.10 1552.80 0
1991-10-24 Packing Device Capped w/Cement 1529.00 1537.00 0
1991-10-26 Perforation 1247.90 1252.10 13
2002-01-14 Chemical Squeeze 1247.90 1252.10 0
2006-08-21 Fracture 1247.90 1252.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 814 0.0 0.0 0.0
1992 4444 0.0 0.0 0.0
1993 4850 0.0 0.0 0.0
1997 24 0.0 0.0 0.0
2007 4720 0.0 0.0 0.0
2008 8370 0.0 0.0 0.0
2009 8690 0.0 0.0 0.0
2010 5143 0.0 0.0 0.0
2011 6937 0.0 0.0 0.0
2012 3612 0.0 0.0 0.0

For data sources see[5]

References