X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262216000

Well Details

Well ID: 0524262216000
Loading map...
Location: 00/16-22-052-26W4/0
Location Alias: 00/16-22-52-26 W4M
Location Alias 2: 00/16-22-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 22
County/Municipality: Stony Plain 135
Well Name: CEDAR CREEK ACH 16-22-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0003921
License Date: 1951-12-10
License Status: Issued
Spud Date: 1952-03-30
Final Drill Date: 1952-04-25
Well Total Depth: 1588.00 m
Surface Hole Latitude: 53.510280
Surface Hole Longitude: -113.741186

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-12-10 Obtained License
1952-04-09 Drill Stem Test Performed
1952-04-18 Liner Casing Operation Performed
1952-04-21 Drill Stem Test Performed
1952-04-25 Finished Drilling
1952-04-25 Well Mode changed to Drilled and Cased
1952-04-27 Perforation Treatment Performed - Jet Perforation
1952-06-25 Well Began Production
1952-06-25 Well Fluid changed to Crude Oil
1952-06-25 Well Mode changed to Flowing
1979-06-01 Perforation Treatment Performed - Chemical Squeeze
1979-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-01 Well Log Performed
1983-11-02 Perforation Treatment Performed - Cement Squeeze
1983-11-05 Perforation Treatment Performed - Jet Perforation
1983-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-10 Well Fluid changed to Crude Oil
1983-11-10 Well Mode changed to Pumping
1990-02-01 Well Fluid changed to Crude Oil
1990-02-01 Well Mode changed to Suspended
1991-04-01 Well Fluid changed to Crude Oil
1991-04-01 Well Mode changed to Flowing
1991-04-03 Well Fluid changed to Crude Oil
1991-04-03 Well Mode changed to Suspended
1992-10-24 Well Log Performed
1992-10-25 Perforation Treatment Performed - Open-Hole Completion
1992-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-26 Perforation Treatment Performed - Jet Perforation
1992-10-26 Well Log Performed
1992-10-27 Well Log Performed
1992-11-03 Well Fluid changed to Crude Oil
1992-11-03 Well Mode changed to Flowing
1996-05-16 Perforation Treatment Performed - Jet Perforation
1996-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-21 Perforation Treatment Performed - Fractured
1996-10-30 Well Fluid changed to Crude Oil
1996-10-30 Well Mode changed to Flowing
2004-11-09 Well Log Performed
2006-07-14 Well Fluid changed to Crude Oil
2006-07-14 Well Mode changed to Suspended
2010-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-09 Plug Back Performed
2010-08-09 Well Fluid changed to Crude Oil
2010-08-09 Well Mode changed to Abandoned Zone
2010-08-10 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2010-08-10 Plug Back Performed
2010-08-10 Well Log Performed
2010-08-11 Perforation Treatment Performed - Jet Perforation
2010-08-11 Well Log Performed
2010-08-16 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-04-27 Perforation 1536.80 1542.90 7
1992-10-26 Perforation 1544.40 1544.90 20
1992-10-26 Perforation 1546.60 1547.10 20
1992-10-26 Perforation 1548.80 1549.30 20
1992-10-26 Perforation 1551.00 1551.50 20
1992-10-26 Perforation 1553.20 1553.70 20
1992-10-26 Perforation 1555.40 1555.90 20
1992-10-26 Acid Treatment 1535.70 1555.90 0
1996-05-16 Perforation 1254.00 1257.00 14
1996-05-17 Acid Treatment 1254.00 1257.00 0
1996-05-21 Fracture 1254.00 1257.00 0
1979-06-01 Chemical Squeeze 1536.80 1542.90 0
2010-08-09 Packing Device Capped w/Cement 1407.70 1529.00 0
2010-08-10 Packing Dev Cpd w/Res-Gyp Cem 1247.00 1250.00 0
2010-08-11 Perforation 1236.50 1239.50 20
2010-08-16 Fracture 1236.50 1239.50 0
1979-08-03 Acid Treatment 1536.80 1542.90 0
1983-11-02 Cement Squeeze 1536.80 1542.90 0
1983-11-05 Perforation 1535.70 1536.70 13
1983-11-07 Acid Treatment 1535.70 1536.70 0
1992-10-25 Open Hole/Barefoot Completion 1555.10 1588.00 0
1992-10-26 Perforation 1540.00 1540.50 20
1992-10-26 Perforation 1542.20 1542.70 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1977 1389 0.0 0.0 0.0
1978 3602 0.0 0.0 0.0
1979 6221 0.0 0.0 0.0
1980 7332 0.0 0.0 0.0
1981 7087 0.0 0.0 0.0
1982 8353 0.0 0.0 0.0
1983 7566 0.0 0.0 0.0
1984 8297 0.0 0.0 0.0
1985 7415 0.0 0.0 0.0
1986 312 0.0 0.0 0.0
1991 50 0.0 0.0 0.0
1992 828 0.0 0.0 0.0
1993 3315 0.0 0.0 0.0
1994 3259 0.0 0.0 0.0
1996 90 0.0 0.0 0.0
1997 2820 0.0 0.0 0.0
1998 8610 0.0 0.0 0.0
1999 5939 0.0 0.0 0.0
2000 5553 0.0 0.0 0.0
2001 8402 0.0 0.0 0.0
2002 7114 0.0 0.0 0.0
2003 8118 0.0 0.0 0.0
2004 1792 0.0 0.0 0.0
2005 3920 0.0 0.0 0.0

For data sources see[5]

References