X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262304003

Well Details

Well ID: 0524262304003
Loading map...
Location: 00/04-23-052-26W4/3
Location Alias: 00/04-23-52-26 W4M
Location Alias 2: 00/04-23-052-26 W4/03
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 23
County/Municipality: Stony Plain 135
Well Name: CEDAR CREEK ACH 4-23-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0003134
License Date: 1951-07-03
License Status: Suspension
Spud Date: 1951-07-07
Final Drill Date: 1951-08-03
Well Total Depth: 1551.40 m
Surface Hole Latitude: 53.499461
Surface Hole Longitude: -113.734820

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-07-03 Obtained License
1951-07-20 Drill Stem Test Performed
1951-07-21 Drill Stem Test Performed
1951-07-24 Drill Stem Test Performed
1951-07-25 Drill Stem Test Performed
1951-07-26 Drill Stem Test Performed
1951-07-31 Drill Stem Test Performed
1951-08-03 Finished Drilling
1951-08-03 Well Mode changed to Drilled and Cased
1951-08-04 Production Casing Operation Performed
1951-08-07 Well Log Performed
1951-08-09 Perforation Treatment Performed - Open-Hole Completion
1951-09-19 Drill Stem Test Performed
1983-08-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-08-12 Perforation Treatment Performed - Jet Perforation
1983-08-16 Perforation Treatment Performed - Jet Perforation
1986-11-14 Perforation Treatment Performed - Jet Perforation
1989-02-23 Well Log Performed
1989-02-24 Perforation Treatment Performed - Jet Perforation
1989-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-05 Perforation Treatment Performed - Fractured
2009-03-13 Perforation Treatment Performed - Cement Squeeze
2009-03-13 Plug Back Performed
2009-03-19 Perforation Treatment Performed - Jet Perforation
2009-03-19 Well Log Performed
2009-03-20 Perforation Treatment Performed - Jet Perforation
2009-03-21 Perforation Treatment Performed - Jet Perforation
2009-03-25 Well Log Performed
2009-04-01 Well Began Production
2009-04-01 Well Fluid changed to Crude Oil
2009-04-01 Well Mode changed to Pumping
2009-05-28 Perforation Treatment Performed - Chemical Squeeze
2010-08-30 Perforation Treatment Performed - Chemical Squeeze
2011-01-23 Perforation Treatment Performed - Chemical Squeeze
2012-06-18 Well Fluid changed to Crude Oil
2012-06-18 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-08-09 Open Hole/Barefoot Completion 1539.20 1551.40 0
2009-03-13 Cement Squeeze 1246.50 1251.00 0
2009-03-19 Perforation 1319.20 1319.80 5
2009-03-19 Perforation 1316.00 1317.50 3
2009-03-20 Perforation 1314.30 1315.70 5
2009-03-21 Perforation 1315.80 1317.00 3
2009-05-28 Chemical Squeeze 1314.30 1317.50 0
2010-08-30 Chemical Squeeze 1314.30 1317.50 0
2011-01-23 Chemical Squeeze 1314.30 1317.50 0
1983-08-11 Packing Device Capped w/Cement 1349.50 1349.50 0
1983-08-12 Perforation 1250.00 1251.00 13
1983-08-16 Perforation 1247.00 1250.00 13
1986-11-14 Perforation 1246.50 1248.00 13
1986-11-14 Perforation 1248.50 1250.00 13
1989-02-24 Perforation 1246.50 1250.00 13
1989-02-25 Acid Treatment 1246.50 1251.00 0
1991-03-05 Fracture 1246.50 1251.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 5994 0.0 0.0 0.0
2010 6072 0.0 0.0 0.0
2011 5307 0.0 0.0 0.0

For data sources see[5]

References