X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262305000

Well Details

Well ID: 0524262305000
Loading map...
Location: 00/05-23-052-26W4/0
Location Alias: 00/05-23-52-26 W4M
Location Alias 2: 00/05-23-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 23
County/Municipality: Stony Plain 135
Well Name: 1107882 ACC ACHESON 5-23-52-26
Operator Name: Obsidian Energy Ltd.
License Number: 0003304
License Date: 1951-08-10
License Status: RecCertified
Spud Date: 1951-08-11
Final Drill Date: 1951-09-12
Well Total Depth: 1586.00 m
Surface Hole Latitude: 53.503352
Surface Hole Longitude: -113.734817

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-08-10 Obtained License
1951-08-28 Drill Stem Test Performed
1951-08-29 Drill Stem Test Performed
1951-09-09 Production Casing Operation Performed
1951-09-12 Finished Drilling
1951-09-12 Perforation Treatment Performed - Open-Hole Completion
1951-09-12 Well Mode changed to Drilled and Cased
1951-09-13 Well Began Production
1951-09-13 Well Fluid changed to Crude Oil
1951-09-13 Well Mode changed to Flowing
1951-09-17 Well Log Performed
1972-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-14 Perforation Treatment Performed - Cement Plug
1978-09-14 Perforation Treatment Performed - Open-Hole Completion
1978-09-15 Perforation Treatment Performed - Acid Wash - No Pressure
1983-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-08-22 Perforation Treatment Performed - Jet Perforation
1983-08-22 Well Fluid changed to Crude Oil
1983-08-22 Well Mode changed to Abandoned Zone
1984-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-09-12 Plug Back Performed
1984-09-13 Perforation Treatment Performed - Jet Perforation
1993-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-29 Perforation Treatment Performed - Cement Squeeze
1993-04-29 Plug Back Performed
1993-05-01 Perforation Treatment Performed - Jet Perforation
1993-05-06 Perforation Treatment Performed - Open-Hole Completion
1993-05-07 Well Log Performed
1993-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-10 Perforation Treatment Performed - Jet Perforation
1993-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-11 Perforation Treatment Performed - Cement Squeeze
1993-05-13 Well Type changed to Observation
1996-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-24 Plug Back Performed
1996-05-24 Well Mode changed to Abandoned Zone
1996-05-24 Well Type changed to Observation
1996-05-25 Perforation Treatment Performed - Jet Perforation
1996-05-25 Well Log Performed
1996-05-26 Perforation Treatment Performed - Fractured
1998-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-04 Plug Back Performed
1998-11-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-09-12 Open Hole/Barefoot Completion 1542.00 1549.60 0
1993-04-29 Acid Treatment 1167.00 1170.00 0
1993-04-29 Cement Squeeze 1167.00 1170.00 0
1993-05-01 Perforation 1249.00 1251.00 13
1993-05-06 Open Hole/Barefoot Completion 1542.00 1586.00 0
1993-05-08 Acid Treatment 1249.00 1251.00 0
1993-05-10 Perforation 1247.00 1251.00 14
1993-05-11 Acid Treatment 1247.00 1251.00 0
1993-05-11 Cement Squeeze 1247.00 1251.00 0
1996-05-24 Packing Device Capped w/Cement 1522.00 1530.00 0
1996-05-25 Perforation 1232.00 1234.50 13
1972-11-08 Acid Treatment 1542.00 1549.60 0
1996-05-25 Perforation 1236.00 1237.50 13
1996-05-26 Fracture 1232.00 1237.50 0
1998-11-04 Packing Device Capped w/Cement 1217.00 1225.00 0
1978-09-14 Cement Plug 1542.90 1549.60 0
1978-09-14 Open Hole/Barefoot Completion 1542.00 1542.90 0
1978-09-15 Acid Wash 1542.00 1542.90 0
1983-08-19 Packing Device Capped w/Cement 1505.40 1505.40 0
1983-08-22 Perforation 1249.00 1251.00 13
1984-09-12 Packing Device Capped w/Cement 1228.50 1236.50 0
1984-09-13 Perforation 1167.00 1170.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2663 0.0 0.0 0.0
1968 2355 0.0 0.0 0.0
1969 3040 0.0 0.0 0.0
1970 3851 0.0 0.0 0.0
1971 3472 0.0 0.0 0.0
1972 5978 0.0 0.0 0.0
1973 4239 0.0 0.0 0.0
1974 5825 0.0 0.0 0.0
1975 5127 0.0 0.0 0.0
1976 4746 0.0 0.0 0.0
1977 4979 0.0 0.0 0.0
1978 4486 0.0 0.0 0.0

For data sources see[5]

References