If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524262312002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.506672,"lon":-113.734815,"icon":""}]} |
Location: 00/12-23-052-26W4/2 | |
Location Alias: 00/12-23-52-26 W4M | |
Location Alias 2: 00/12-23-052-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 26 | |
Section: 23 | |
County/Municipality: Stony Plain 135 | |
Well Name: CEDAR CREEK ACH 12-23-52-26 | |
Operator Name: MAGA Energy Operations Ltd. | |
License Number: 0003598 | |
License Date: 1951-10-11 | |
License Status: Issued | |
Spud Date: 1951-10-12 | |
Final Drill Date: 1951-11-07 | |
Well Total Depth: 1557.50 m | |
Surface Hole Latitude: 53.506672 | |
Surface Hole Longitude: -113.734815 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-10-11 | Obtained License |
1951-10-25 | Drill Stem Test Performed |
1951-10-31 | Drill Stem Test Performed |
1951-11-04 | Production Casing Operation Performed |
1951-11-07 | Finished Drilling |
1951-11-07 | Perforation Treatment Performed - Open-Hole Completion |
1951-11-07 | Well Mode changed to Drilled and Cased |
1965-12-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1965-12-04 | Perforation Treatment Performed - Open-Hole Completion |
1982-02-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-02-19 | Perforation Treatment Performed - Jet Perforation |
1982-04-13 | Well Began Production |
1982-04-13 | Well Fluid changed to Crude Oil |
1982-04-13 | Well Mode changed to Pumping |
1988-08-25 | Well Log Performed |
1988-08-26 | Perforation Treatment Performed - Jet Perforation |
1988-08-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-12-10 | Perforation Treatment Performed - Cement Squeeze |
2005-12-10 | Plug Back Performed |
2006-01-10 | Perforation Treatment Performed - Open-Hole Completion |
2006-01-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-01-11 | Plug Back Performed |
2006-01-11 | Well Log Performed |
2006-01-12 | Perforation Treatment Performed - Jet Perforation |
2006-01-14 | Well Log Performed |
2006-01-15 | Perforation Treatment Performed - Jet Perforation |
2006-01-15 | Well Log Performed |
2006-01-19 | Perforation Treatment Performed - Jet Perforation |
2006-01-19 | Well Log Performed |
2008-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-02-08 | Plug Back Performed |
2008-02-08 | Well Log Performed |
2008-02-11 | Perforation Treatment Performed - Jet Perforation |
2008-02-11 | Well Log Performed |
2010-02-01 | Well Log Performed |
2013-02-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2013-02-02 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-11-07 | Open Hole/Barefoot Completion | 1542.60 | 1557.50 | 0 |
2006-01-11 | Packing Device Capped w/Cement | 1526.00 | 1535.00 | 0 |
2006-01-12 | Perforation | 1341.10 | 1343.00 | 20 |
2006-01-15 | Perforation | 1331.50 | 1335.00 | 20 |
2006-01-19 | Perforation | 1322.20 | 1325.30 | 20 |
2008-02-08 | Packing Device Capped w/Cement | 1307.00 | 1315.00 | 0 |
2008-02-11 | Perforation | 1248.50 | 1253.30 | 20 |
2013-02-01 | Acid Treatment | 1248.50 | 1253.30 | 0 |
2013-02-02 | Perforation | 1247.00 | 1252.80 | 2 |
1965-12-04 | Packing Device Capped w/Cement | 1556.30 | 1556.30 | 0 |
1965-12-04 | Open Hole/Barefoot Completion | 1542.60 | 1556.30 | 0 |
1982-02-18 | Packing Device Capped w/Cement | 1286.70 | 1295.00 | 0 |
1982-02-19 | Perforation | 1251.50 | 1255.80 | 10 |
1988-08-26 | Perforation | 1251.50 | 1260.00 | 13 |
1988-08-27 | Acid Treatment | 1251.50 | 1260.00 | 0 |
2005-12-10 | Cement Squeeze | 1251.50 | 1260.00 | 0 |
2006-01-10 | Open Hole/Barefoot Completion | 1542.60 | 1556.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 1960 | 0.0 | 0.0 | 0.0 |
1983 | 3855 | 0.0 | 0.0 | 0.0 |
1984 | 6670 | 0.0 | 0.0 | 0.0 |
1985 | 8162 | 0.0 | 0.0 | 0.0 |
1986 | 8687 | 0.0 | 0.0 | 0.0 |
1987 | 7811 | 0.0 | 0.0 | 0.0 |
1988 | 8562 | 0.0 | 0.0 | 0.0 |
1989 | 8403 | 0.0 | 0.0 | 0.0 |
1990 | 8263 | 0.0 | 0.0 | 0.0 |
1991 | 7523 | 0.0 | 0.0 | 0.0 |
1992 | 8695 | 0.0 | 0.0 | 0.0 |
1993 | 7863 | 0.0 | 0.0 | 0.0 |
1994 | 8739 | 0.0 | 0.0 | 0.0 |
1995 | 2218 | 0.0 | 0.0 | 0.0 |
1996 | 8600 | 0.0 | 0.0 | 0.0 |
1997 | 7182 | 0.0 | 0.0 | 0.0 |
1998 | 8663 | 0.0 | 0.0 | 0.0 |
1999 | 8658 | 0.0 | 0.0 | 0.0 |
2000 | 8402 | 0.0 | 0.0 | 0.0 |
2001 | 8550 | 0.0 | 0.0 | 0.0 |
2002 | 8402 | 0.0 | 0.0 | 0.0 |
2003 | 7704 | 0.0 | 0.0 | 0.0 |
2004 | 6868 | 0.0 | 0.0 | 0.0 |
2006 | 6263 | 0.0 | 0.0 | 0.0 |
2008 | 6154 | 0.0 | 0.0 | 0.0 |
2009 | 8669 | 0.0 | 0.0 | 0.0 |
2010 | 8547 | 0.0 | 0.0 | 0.0 |
2011 | 8713 | 0.0 | 0.0 | 0.0 |
2012 | 6532 | 0.0 | 0.0 | 0.0 |
2013 | 8458 | 0.0 | 0.0 | 0.0 |
2014 | 8656 | 0.0 | 0.0 | 0.0 |
2015 | 8439 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8750 | 0.0 | 0.0 | 0.0 |
2019 | 8611 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-02-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]