If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524263401002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.528492,"lon":-113.74047,"icon":""}]} |
Location: 00/01-34-052-26W4/2 | |
Location Alias: 00/01-34-52-26 W4M | |
Location Alias 2: 00/01-34-052-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 26 | |
Section: 34 | |
County/Municipality: Parkland County | |
Well Name: CEDAR CREEK ACH 1-34-52-26 | |
Operator Name: MAGA Energy Operations Ltd. | |
License Number: 0003976 | |
License Date: 1951-12-21 | |
License Status: Suspension | |
Spud Date: 1952-01-01 | |
Final Drill Date: 1952-02-09 | |
Well Total Depth: 1567.00 m | |
Surface Hole Latitude: 53.528492 | |
Surface Hole Longitude: -113.740470 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-12-21 | Obtained License |
1952-02-06 | Production Casing Operation Performed |
1952-02-09 | Finished Drilling |
1952-02-09 | Perforation Treatment Performed - Open-Hole Completion |
1952-02-09 | Well Mode changed to Drilled and Cased |
1968-08-14 | Perforation Treatment Performed - Open-Hole Completion |
1984-07-24 | Well Log Performed |
1985-03-22 | Well Log Performed |
1985-06-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-06-15 | Plug Back Performed |
1985-06-16 | Perforation Treatment Performed - Jet Perforation |
1985-09-01 | Well Began Production |
1985-09-01 | Well Fluid changed to Crude Oil |
1985-09-01 | Well Mode changed to Pumping |
1986-09-06 | Perforation Treatment Performed - Fractured |
2010-12-22 | Well Fluid changed to Crude Oil |
2010-12-22 | Well Mode changed to Suspended |
2011-07-24 | Well Log Performed |
2011-09-20 | Perforation Treatment Performed - Cement Plug |
2011-09-20 | Perforation Treatment Performed - Cement Squeeze |
2011-09-24 | Well Log Performed |
2011-10-23 | Perforation Treatment Performed - Jet Perforation |
2011-10-23 | Well Log Performed |
2011-10-24 | Perforation Treatment Performed - Cement Plug |
2011-10-24 | Perforation Treatment Performed - Remedial Casing |
2011-10-25 | Perforation Treatment Performed - Jet Perforation |
2011-10-25 | Well Log Performed |
2011-10-26 | Perforation Treatment Performed - Cement Plug |
2011-10-26 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-02-09 | Open Hole/Barefoot Completion | 1541.70 | 1559.40 | 0 |
2011-10-24 | Cement Plug | 791.00 | 881.00 | 0 |
2011-10-25 | Perforation | 678.00 | 683.00 | 13 |
2011-10-26 | Remedial Casing Cementing | 678.00 | 683.00 | 0 |
2011-10-26 | Cement Plug | 550.30 | 683.00 | 0 |
1968-08-14 | Open Hole/Barefoot Completion | 1541.70 | 1567.00 | 0 |
1985-06-15 | Packing Device Capped w/Cement | 1488.00 | 1488.00 | 0 |
1985-06-16 | Perforation | 1246.00 | 1248.00 | 13 |
1986-09-06 | Fracture | 1246.00 | 1248.00 | 0 |
2011-09-20 | Cement Squeeze | 1246.00 | 1248.00 | 0 |
2011-09-20 | Cement Plug | 1146.20 | 1254.00 | 0 |
2011-10-23 | Perforation | 869.00 | 874.00 | 13 |
2011-10-24 | Remedial Casing Cementing | 869.00 | 874.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 2267 | 0.0 | 0.0 | 0.0 |
1986 | 1916 | 0.0 | 0.0 | 0.0 |
1987 | 5952 | 0.0 | 0.0 | 0.0 |
1988 | 7283 | 0.0 | 0.0 | 0.0 |
1989 | 8420 | 0.0 | 0.0 | 0.0 |
1990 | 8019 | 0.0 | 0.0 | 0.0 |
1991 | 8570 | 0.0 | 0.0 | 0.0 |
1992 | 8514 | 0.0 | 0.0 | 0.0 |
1993 | 7814 | 0.0 | 0.0 | 0.0 |
1994 | 8666 | 0.0 | 0.0 | 0.0 |
1995 | 8163 | 0.0 | 0.0 | 0.0 |
1996 | 8751 | 0.0 | 0.0 | 0.0 |
1997 | 8378 | 0.0 | 0.0 | 0.0 |
1998 | 8618 | 0.0 | 0.0 | 0.0 |
1999 | 8688 | 0.0 | 0.0 | 0.0 |
2000 | 8311 | 0.0 | 0.0 | 0.0 |
2001 | 8091 | 0.0 | 0.0 | 0.0 |
2002 | 7170 | 0.0 | 0.0 | 0.0 |
2003 | 7420 | 0.0 | 0.0 | 0.0 |
2004 | 7545 | 0.0 | 0.0 | 0.0 |
2005 | 7414 | 0.0 | 0.0 | 0.0 |
2006 | 7729 | 0.0 | 0.0 | 0.0 |
2007 | 8697 | 0.0 | 0.0 | 0.0 |
2008 | 5693 | 0.0 | 0.0 | 0.0 |
2009 | 2852 | 0.0 | 0.0 | 0.0 |
For data sources see[5]