If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524263415002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.53931,"lon":-113.747335,"icon":""}]} |
Location: 00/15-34-052-26W4/2 | |
Location Alias: 00/15-34-52-26 W4M | |
Location Alias 2: 00/15-34-052-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 26 | |
Section: 34 | |
County/Municipality: Parkland County | |
Well Name: CEDAR CREEK ACH 15-34-52-26 | |
Operator Name: MAGA Energy Operations Ltd. | |
License Number: 0006996 | |
License Date: 1953-08-26 | |
License Status: Suspension | |
Spud Date: 1953-09-01 | |
Final Drill Date: 1953-10-11 | |
Well Total Depth: 1557.80 m | |
Surface Hole Latitude: 53.539310 | |
Surface Hole Longitude: -113.747335 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-08-26 | Obtained License |
1953-10-09 | Production Casing Operation Performed |
1953-10-11 | Finished Drilling |
1953-10-11 | Perforation Treatment Performed - Open-Hole Completion |
1953-10-11 | Well Mode changed to Drilled and Cased |
1971-09-07 | Perforation Treatment Performed - Cement Plug |
1971-09-07 | Perforation Treatment Performed - Open-Hole Completion |
1983-10-03 | Well Log Performed |
1983-10-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-10-26 | Well Log Performed |
1983-10-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-10-27 | Perforation Treatment Performed - Jet Perforation |
1983-11-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-11-07 | Perforation Treatment Performed - Jet Perforation |
1983-11-08 | Perforation Treatment Performed - Jet Perforation |
1983-11-25 | Well Began Production |
1983-11-25 | Well Fluid changed to Crude Oil |
1983-11-25 | Well Mode changed to Pumping |
1985-12-01 | Well Fluid changed to Crude Oil |
1985-12-01 | Well Mode changed to Suspended |
1986-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-10-29 | Perforation Treatment Performed - Fractured |
1986-11-05 | Well Fluid changed to Crude Oil |
1986-11-05 | Well Mode changed to Pumping |
1987-11-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-11-26 | Plug Back Performed |
1987-11-27 | Perforation Treatment Performed - Fractured |
1987-11-27 | Perforation Treatment Performed - Jet Perforation |
2008-11-19 | Perforation Treatment Performed - Jet Perforation |
2008-11-19 | Well Log Performed |
2009-08-15 | Perforation Treatment Performed - Chemical Squeeze |
2009-08-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2018-02-01 | Well Fluid changed to Crude Oil |
2018-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-10-11 | Open Hole/Barefoot Completion | 1549.60 | 1557.80 | 0 |
1986-10-29 | Acid Treatment | 1232.00 | 1233.20 | 0 |
1986-10-29 | Fracture | 1232.00 | 1233.20 | 0 |
1987-11-26 | Packing Device Capped w/Cement | 1525.00 | 1525.00 | 0 |
1987-11-27 | Perforation | 1227.60 | 1229.30 | 13 |
1987-11-27 | Fracture | 1227.60 | 1229.30 | 0 |
2008-11-19 | Perforation | 1229.00 | 1233.00 | 13 |
2009-08-15 | Chemical Squeeze | 1227.60 | 1233.20 | 0 |
2009-08-18 | Acid Treatment | 1227.60 | 1233.20 | 0 |
1971-09-07 | Cement Plug | 1553.90 | 1557.80 | 0 |
1971-09-07 | Open Hole/Barefoot Completion | 1549.60 | 1553.90 | 0 |
1983-10-26 | Packing Device Capped w/Cement | 1450.00 | 1529.70 | 0 |
1983-10-27 | Perforation | 1232.00 | 1233.20 | 7 |
1983-10-27 | Acid Treatment | 1232.00 | 1233.20 | 0 |
1983-11-02 | Acid Treatment | 1232.00 | 1233.20 | 0 |
1983-11-07 | Perforation | 1232.00 | 1233.20 | 7 |
1983-11-08 | Perforation | 1232.00 | 1233.20 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 864 | 0.0 | 0.0 | 0.0 |
1984 | 7187 | 0.0 | 0.0 | 0.0 |
1985 | 2375 | 0.0 | 0.0 | 0.0 |
1986 | 757 | 0.0 | 0.0 | 0.0 |
1987 | 588 | 0.0 | 0.0 | 0.0 |
1988 | 5995 | 0.0 | 0.0 | 0.0 |
1989 | 6431 | 0.0 | 0.0 | 0.0 |
1990 | 8519 | 0.0 | 0.0 | 0.0 |
1991 | 6995 | 0.0 | 0.0 | 0.0 |
1992 | 8536 | 0.0 | 0.0 | 0.0 |
1993 | 715 | 0.0 | 0.0 | 0.0 |
1994 | 1818 | 0.0 | 0.0 | 0.0 |
1995 | 5965 | 0.0 | 0.0 | 0.0 |
1996 | 8514 | 0.0 | 0.0 | 0.0 |
1997 | 8184 | 0.0 | 0.0 | 0.0 |
1998 | 8671 | 0.0 | 0.0 | 0.0 |
1999 | 8433 | 0.0 | 0.0 | 0.0 |
2000 | 8521 | 0.0 | 0.0 | 0.0 |
2001 | 8657 | 0.0 | 0.0 | 0.0 |
2002 | 8604 | 0.0 | 0.0 | 0.0 |
2003 | 8422 | 0.0 | 0.0 | 0.0 |
2004 | 8783 | 0.0 | 0.0 | 0.0 |
2005 | 7138 | 0.0 | 0.0 | 0.0 |
2006 | 8509 | 0.0 | 0.0 | 0.0 |
2007 | 8701 | 0.0 | 0.0 | 0.0 |
2008 | 7936 | 0.0 | 0.0 | 0.0 |
2009 | 8440 | 0.0 | 0.0 | 0.0 |
2010 | 8532 | 0.0 | 0.0 | 0.0 |
2011 | 6853 | 0.0 | 0.0 | 0.0 |
2012 | 8713 | 0.0 | 0.0 | 0.0 |
2013 | 8728 | 0.0 | 0.0 | 0.0 |
2014 | 8687 | 0.0 | 0.0 | 0.0 |
2015 | 8368 | 0.0 | 0.0 | 0.0 |
2016 | 8323 | 0.0 | 0.0 | 0.0 |
2017 | 888 | 0.0 | 0.0 | 0.0 |
For data sources see[5]