If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0524263507000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.533745,"lon":-113.723703,"icon":""}]} |
| Location: 00/07-35-052-26W4/0 | |
| Location Alias: 00/07-35-52-26 W4M | |
| Location Alias 2: 00/07-35-052-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 052 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 35 | |
| County/Municipality: Parkland County | |
| Well Name: CEDAR CREEK ACH 7-35-52-26 | |
| Operator Name: MAGA Energy Operations Ltd. | |
| License Number: 0004502 | |
| License Date: 1952-04-16 | |
| License Status: Issued | |
| Spud Date: 1952-04-13 | |
| Final Drill Date: 1952-05-13 | |
| Well Total Depth: 1591.00 m | |
| Surface Hole Latitude: 53.533745 | |
| Surface Hole Longitude: -113.723703 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1952-04-16 | Obtained License |
| 1952-05-08 | Intermediate Casing Operation Performed |
| 1952-05-13 | Finished Drilling |
| 1952-05-13 | Perforation Treatment Performed - Open-Hole Completion |
| 1952-05-13 | Well Mode changed to Drilled and Cased |
| 1952-05-14 | Well Began Production |
| 1952-05-14 | Well Fluid changed to Crude Oil |
| 1952-05-14 | Well Mode changed to Pumping |
| 1975-06-18 | Well Fluid changed to Crude Oil |
| 1975-06-18 | Well Mode changed to Flowing |
| 1984-07-24 | Well Log Performed |
| 1984-08-08 | Well Log Performed |
| 1987-12-07 | Well Fluid changed to Crude Oil |
| 1987-12-07 | Well Mode changed to Pumping |
| 1991-07-08 | Well Log Performed |
| 1991-07-09 | Perforation Treatment Performed - Open-Hole Completion |
| 1991-07-09 | Well Log Performed |
| 1991-07-10 | Perforation Treatment Performed - Cement Plug |
| 1991-07-10 | Perforation Treatment Performed - Open-Hole Completion |
| 1991-07-11 | Liner Casing Operation Performed |
| 1991-07-11 | Perforation Treatment Performed - Cement Squeeze |
| 1992-09-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-09-28 | Perforation Treatment Performed - Jet Perforation |
| 1992-09-29 | Perforation Treatment Performed - Jet Perforation |
| 1992-09-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-10-15 | Well Fluid changed to Crude Oil |
| 1992-10-15 | Well Mode changed to Pumping |
| 2004-04-14 | Perforation Treatment Performed - Jet Perforation |
| 2004-04-14 | Well Log Performed |
| 2005-06-08 | Perforation Treatment Performed - Jet Perforation |
| 2005-06-26 | Perforation Treatment Performed - Cement Squeeze |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1952-05-13 | Open Hole/Barefoot Completion | 1508.20 | 1557.50 | 0 |
| 1992-09-28 | Perforation | 1545.60 | 1546.10 | 20 |
| 1992-09-28 | Perforation | 1547.80 | 1548.30 | 20 |
| 1992-09-28 | Perforation | 1550.00 | 1550.50 | 20 |
| 1992-09-28 | Acid Treatment | 1527.00 | 1550.50 | 0 |
| 1992-09-29 | Perforation | 1419.80 | 1421.00 | 16 |
| 1992-09-30 | Acid Treatment | 1419.80 | 1421.00 | 0 |
| 2004-04-14 | Perforation | 1535.00 | 1535.50 | 20 |
| 2005-06-08 | Perforation | 1522.50 | 1524.50 | 20 |
| 2005-06-26 | Cement Squeeze | 1419.80 | 1421.00 | 0 |
| 1991-07-09 | Open Hole/Barefoot Completion | 1508.20 | 1591.00 | 0 |
| 1991-07-10 | Cement Plug | 1588.00 | 1591.00 | 0 |
| 1991-07-10 | Open Hole/Barefoot Completion | 1508.20 | 1588.00 | 0 |
| 1991-07-11 | Cement Squeeze | 1508.20 | 1588.00 | 0 |
| 1992-09-28 | Perforation | 1527.00 | 1527.50 | 20 |
| 1992-09-28 | Perforation | 1539.00 | 1539.50 | 20 |
| 1992-09-28 | Perforation | 1541.20 | 1544.70 | 20 |
| 1992-09-28 | Perforation | 1543.40 | 1543.90 | 20 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 5500 | 0.0 | 0.0 | 0.0 |
| 1968 | 6508 | 0.0 | 0.0 | 0.0 |
| 1969 | 7006 | 0.0 | 0.0 | 0.0 |
| 1970 | 6443 | 0.0 | 0.0 | 0.0 |
| 1971 | 5294 | 0.0 | 0.0 | 0.0 |
| 1972 | 5878 | 0.0 | 0.0 | 0.0 |
| 1973 | 7544 | 0.0 | 0.0 | 0.0 |
| 1974 | 5544 | 0.0 | 0.0 | 0.0 |
| 1975 | 4355 | 0.0 | 0.0 | 0.0 |
| 1976 | 4156 | 0.0 | 0.0 | 0.0 |
| 1977 | 4830 | 0.0 | 0.0 | 0.0 |
| 1978 | 6681 | 0.0 | 0.0 | 0.0 |
| 1979 | 8310 | 0.0 | 0.0 | 0.0 |
| 1980 | 7966 | 0.0 | 0.0 | 0.0 |
| 1981 | 7174 | 0.0 | 0.0 | 0.0 |
| 1982 | 7056 | 0.0 | 0.0 | 0.0 |
| 1983 | 6706 | 0.0 | 0.0 | 0.0 |
| 1984 | 7926 | 0.0 | 0.0 | 0.0 |
| 1985 | 7838 | 0.0 | 0.0 | 0.0 |
| 1986 | 5359 | 0.0 | 0.0 | 0.0 |
| 1987 | 7131 | 0.0 | 0.0 | 0.0 |
| 1988 | 8232 | 0.0 | 0.0 | 0.0 |
| 1989 | 7799 | 0.0 | 0.0 | 0.0 |
| 1990 | 4629 | 0.0 | 0.0 | 0.0 |
| 1992 | 1401 | 0.0 | 0.0 | 0.0 |
| 1993 | 6346 | 0.0 | 0.0 | 0.0 |
| 1994 | 4480 | 0.0 | 0.0 | 0.0 |
| 1996 | 1917 | 0.0 | 0.0 | 0.0 |
| 1997 | 7024 | 0.0 | 0.0 | 0.0 |
| 1998 | 8554 | 0.0 | 0.0 | 0.0 |
| 1999 | 2089 | 0.0 | 0.0 | 0.0 |
| 2000 | 553 | 0.0 | 0.0 | 0.0 |
| 2001 | 885 | 0.0 | 0.0 | 0.0 |
| 2002 | 86 | 0.0 | 0.0 | 0.0 |
| 2003 | 6202 | 0.0 | 0.0 | 0.0 |
| 2004 | 8496 | 0.0 | 0.0 | 0.0 |
| 2005 | 7608 | 0.0 | 0.0 | 0.0 |
| 2006 | 8279 | 0.0 | 0.0 | 0.0 |
| 2007 | 7608 | 0.0 | 0.0 | 0.0 |
| 2008 | 8752 | 0.0 | 0.0 | 0.0 |
| 2009 | 8520 | 0.0 | 0.0 | 0.0 |
| 2010 | 8320 | 0.0 | 0.0 | 0.0 |
| 2011 | 8753 | 0.0 | 0.0 | 0.0 |
| 2012 | 8748 | 0.0 | 0.0 | 0.0 |
| 2013 | 8731 | 0.0 | 0.0 | 0.0 |
| 2014 | 8659 | 0.0 | 0.0 | 0.0 |
| 2015 | 8542 | 0.0 | 0.0 | 0.0 |
| 2016 | 7535 | 0.0 | 0.0 | 0.0 |
| 2017 | 7359 | 0.0 | 0.0 | 0.0 |
| 2018 | 8642 | 0.0 | 0.0 | 0.0 |
| 2019 | 8198 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]