If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524263512003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.535696,"lon":-113.734874,"icon":""}]} |
Location: 00/12-35-052-26W4/3 | |
Location Alias: 00/12-35-52-26 W4M | |
Location Alias 2: 00/12-35-052-26 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 26 | |
Section: 35 | |
County/Municipality: Parkland County | |
Well Name: CEDAR CREEK ACH 12-35-52-26 | |
Operator Name: MAGA Energy Operations Ltd. | |
License Number: 0002738 | |
License Date: 1951-03-30 | |
License Status: Suspension | |
Spud Date: 1951-04-07 | |
Final Drill Date: 1951-05-05 | |
Well Total Depth: 1594.00 m | |
Surface Hole Latitude: 53.535696 | |
Surface Hole Longitude: -113.734874 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-03-30 | Obtained License |
1951-04-25 | Drill Stem Test Performed |
1951-04-26 | Drill Stem Test Performed |
1951-04-27 | Drill Stem Test Performed |
1951-04-30 | Production Casing Operation Performed |
1951-05-05 | Finished Drilling |
1951-05-05 | Perforation Treatment Performed - Open-Hole Completion |
1951-05-05 | Well Mode changed to Drilled and Cased |
1982-10-30 | Perforation Treatment Performed - Cement Plug |
1982-10-30 | Perforation Treatment Performed - Jet Perforation |
1982-10-30 | Perforation Treatment Performed - Open-Hole Completion |
1984-08-31 | Perforation Treatment Performed - Open-Hole Completion |
1984-09-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-09-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-07-27 | Well Log Performed |
1985-10-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-10-27 | Plug Back Performed |
1985-10-29 | Perforation Treatment Performed - Jet Perforation |
1985-10-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-09-28 | Well Log Performed |
1993-01-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-01-26 | Perforation Treatment Performed - Jet Perforation |
1993-01-26 | Well Log Performed |
1993-01-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-01-27 | Perforation Treatment Performed - Cement Squeeze |
1993-01-27 | Well Log Performed |
1993-01-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-01-28 | Perforation Treatment Performed - Cement Squeeze |
1993-01-30 | Perforation Treatment Performed - Open-Hole Completion |
1993-02-04 | Perforation Treatment Performed - Open-Hole Completion |
1996-01-24 | Well Log Performed |
1996-07-08 | Well Log Performed |
1996-11-21 | Well Log Performed |
1996-11-22 | Well Log Performed |
2003-09-17 | Well Log Performed |
2003-09-18 | Well Log Performed |
2003-09-22 | Well Log Performed |
2004-06-28 | Perforation Treatment Performed - Cement Plug |
2004-08-10 | Well Log Performed |
2004-08-12 | Well Log Performed |
2004-08-13 | Perforation Treatment Performed - Jet Perforation |
2004-08-13 | Well Log Performed |
2006-07-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-07-07 | Plug Back Performed |
2006-07-10 | Perforation Treatment Performed - Jet Perforation |
2006-07-12 | Perforation Treatment Performed - Fractured |
2006-08-20 | Well Began Production |
2006-08-20 | Well Fluid changed to Crude Oil |
2006-08-20 | Well Mode changed to Pumping |
2010-05-15 | Perforation Treatment Performed - Jet Perforation |
2010-05-15 | Well Log Performed |
2010-05-16 | Well Log Performed |
2010-05-18 | Well Fluid changed to Crude Oil |
2010-05-18 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-05-05 | Open Hole/Barefoot Completion | 1526.10 | 1559.10 | 0 |
1985-10-31 | Acid Treatment | 1434.10 | 1435.10 | 0 |
1993-01-26 | Perforation | 1440.00 | 1440.30 | 24 |
1993-01-26 | Acid Treatment | 1434.10 | 1440.30 | 0 |
1993-01-26 | Perforation | 1438.00 | 1438.30 | 24 |
1993-01-27 | Acid Treatment | 1434.10 | 1440.30 | 0 |
1993-01-27 | Cement Squeeze | 1434.10 | 1440.30 | 0 |
1993-01-28 | Acid Treatment | 1434.10 | 1435.10 | 0 |
1993-01-28 | Cement Squeeze | 1434.10 | 1435.10 | 0 |
1993-01-30 | Open Hole/Barefoot Completion | 1526.10 | 1559.10 | 0 |
1993-02-04 | Open Hole/Barefoot Completion | 1526.10 | 1594.00 | 0 |
1982-10-30 | Cement Plug | 1538.80 | 1559.10 | 0 |
2004-06-28 | Cement Plug | 1536.00 | 1538.00 | 0 |
2004-08-13 | Perforation | 1533.50 | 1535.50 | 13 |
2006-07-07 | Packing Device Capped w/Cement | 1512.00 | 1520.00 | 0 |
2006-07-10 | Perforation | 1237.00 | 1240.00 | 17 |
2006-07-12 | Fracture | 1237.00 | 1240.00 | 0 |
2010-05-15 | Perforation | 1255.10 | 1255.30 | 1 |
2010-05-15 | Perforation | 1255.40 | 1255.60 | 1 |
2010-05-15 | Perforation | 1255.70 | 1255.90 | 1 |
2010-05-15 | Perforation | 1256.00 | 1256.20 | 1 |
2010-05-15 | Perforation | 1256.30 | 1256.50 | 1 |
1982-10-30 | Open Hole/Barefoot Completion | 1526.10 | 1538.80 | 0 |
2010-05-15 | Perforation | 1256.80 | 1256.90 | 1 |
2010-05-15 | Perforation | 1257.10 | 1257.20 | 1 |
2010-05-15 | Perforation | 1257.50 | 1257.80 | 1 |
1982-10-30 | Perforation | 1534.80 | 1536.30 | 13 |
1984-08-31 | Open Hole/Barefoot Completion | 1526.10 | 1541.60 | 0 |
1984-09-19 | Acid Treatment | 1535.50 | 1536.70 | 0 |
1984-09-20 | Acid Treatment | 1526.10 | 1538.30 | 0 |
1985-10-27 | Packing Device Capped w/Cement | 1487.70 | 1504.80 | 0 |
1985-10-29 | Perforation | 1434.10 | 1435.10 | 21 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 744 | 0.0 | 0.0 | 0.0 |
2007 | 8683 | 0.0 | 0.0 | 0.0 |
2008 | 8675 | 0.0 | 0.0 | 0.0 |
2009 | 8485 | 0.0 | 0.0 | 0.0 |
2010 | 3038 | 0.0 | 0.0 | 0.0 |
For data sources see[5]