X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524263611020

Well Details

Well ID: 0524263611020
Loading map...
Location: 02/11-36-052-26W4/0
Location Alias: 02/11-36-52-26 W4M
Location Alias 2: 02/11-36-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 36
County/Municipality: Edmonton
Well Name: CEDAR CREEK ACHE 11-36-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0140267
License Date: 1989-06-29
License Status: Abandoned
Spud Date: 1989-07-18
Final Drill Date: 1989-07-26
Well Total Depth: 1318.00 m
Surface Hole Latitude: 53.536078
Surface Hole Longitude: -113.704702

For data sources see[1][2]

Well History

Date Event
1989-06-29 Obtained License
1989-07-19 Surface Casing Operation Performed
1989-07-20 Direction Drilling Operation Performed - Deviate
1989-07-26 Finished Drilling
1989-07-26 Well Log Performed
1989-07-26 Well Mode changed to Drilled and Cased
1989-07-27 Production Casing Operation Performed
1989-07-27 Rig Released
1989-07-31 Well Log Performed
1989-08-01 Perforation Treatment Performed - Jet Perforation
1989-08-09 Perforation Treatment Performed - Jet Perforation
1989-08-09 Well Log Performed
1989-09-02 Well Began Production
1989-09-02 Well Fluid changed to Crude Oil
1989-09-02 Well Mode changed to Pumping
1989-11-27 Well Log Performed
1989-11-28 Perforation Treatment Performed - Jet Perforation
1990-05-30 Perforation Treatment Performed - Jet Perforation
1990-05-30 Well Log Performed
1991-09-16 Well Log Performed
1991-09-17 Perforation Treatment Performed - Cement Squeeze
1991-09-17 Plug Back Performed
1991-09-17 Well Fluid changed to Crude Oil
1991-09-17 Well Mode changed to Abandoned Zone
1991-10-28 Well Log Performed
1991-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-29 Perforation Treatment Performed - Jet Perforation
1991-10-29 Well Log Performed
1992-04-02 Well Log Performed
2008-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-28 Plug Back Performed
2008-09-28 Well Log Performed
2013-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-08-23 Perforation Treatment Performed - Jet Perforation
2013-08-23 Well Log Performed
2013-08-25 Perforation Treatment Performed - Cement Plug
2013-08-25 Perforation Treatment Performed - Remedial Casing
2013-10-05 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-07-20 329.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-08-01 Perforation 1267.00 1271.00 14
2013-08-23 Perforation 512.00 514.00 13
2013-08-25 Remedial Casing Cementing 512.00 514.00 0
2013-08-25 Cement Plug 389.50 514.00 0
1989-08-09 Perforation 1271.00 1272.00 14
1989-11-28 Perforation 1270.50 1272.50 14
1990-05-30 Perforation 1267.00 1272.50 13
1991-09-17 Cement Squeeze 1267.00 1272.50 0
1991-10-29 Perforation 1309.00 1313.00 13
1991-10-29 Acid Treatment 1309.00 1313.00 0
2008-09-28 Packing Device Capped w/Cement 1287.00 1295.00 0
2013-08-23 Packing Device Capped w/Cement 1245.00 1255.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 2760 0.0 0.0 0.0
1990 7656 0.0 0.0 0.0
1991 5664 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References