X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524272214002

Well Details

Well ID: 0524272214002
Loading map...
Location: 00/14-22-052-27W4/2
Location Alias: 00/14-22-52-27 W4M
Location Alias 2: 00/14-22-052-27 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 27
Section: 22
County/Municipality: Parkland County
Well Name: NEW JORDON SPRUCE GROVE 14-22-52-27
Operator Name: Petronas Energy Canada Ltd.
License Number: 0115214
License Date: 1985-06-10
License Status: RecCertified
Spud Date: 1985-06-15
Final Drill Date: 1985-06-26
Well Total Depth: 1480.00 m
Surface Hole Latitude: 53.508108
Surface Hole Longitude: -113.898539

For data sources see[1][2]

Well History

Date Event
1985-06-10 Obtained License
1985-06-16 Surface Casing Operation Performed
1985-06-18 Direction Drilling Operation Performed - Deviate
1985-06-26 Finished Drilling
1985-06-27 Drill Stem Test Performed
1985-06-28 Drill Stem Test Performed
1985-06-28 Well Log Performed
1985-06-29 Drill Stem Test Performed
1985-06-30 Production Casing Operation Performed
1985-06-30 Rig Released
1985-08-06 Well Log Performed
1985-08-15 Well Log Performed
1985-08-16 Perforation Treatment Performed - Jet Perforation
1985-08-16 Well Log Performed
1985-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-08-21 Perforation Treatment Performed - Jet Perforation
1985-08-21 Plug Back Performed
1985-08-21 Well Log Performed
1985-08-24 Perforation Treatment Performed - Jet Perforation
1985-08-24 Well Log Performed
1985-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-25 Well Mode changed to Drilled and Cased
1992-12-08 Well Began Production
1992-12-08 Well Fluid changed to Gas
1992-12-08 Well Mode changed to Flowing
1996-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-18 Plug Back Performed
1996-03-18 Well Log Performed
1996-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-19 Plug Back Performed
1996-03-19 Well Abandoned
1996-03-19 Well Fluid changed to Gas
1996-03-19 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-06-18 744.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-08-16 Perforation 1400.00 1402.00 13
1985-08-24 Perforation 1312.50 1314.00 13
1985-08-24 Perforation 1316.80 1318.00 13
1985-10-20 Acid Treatment 1380.50 1388.00 0
1996-03-18 Packing Device Capped w/Cement 1356.00 1365.00 0
1996-03-19 Packing Device Capped w/Cement 1272.00 1280.00 0
1985-08-16 Perforation 1404.00 1406.00 13
1985-08-16 Perforation 1407.00 1408.00 13
1985-08-17 Acid Treatment 1400.00 1408.00 0
1985-08-21 Packing Device Capped w/Cement 1398.00 1398.00 0
1985-08-21 Perforation 1380.50 1385.50 13
1985-08-21 Perforation 1385.50 1388.00 13
1985-08-24 Perforation 1295.00 1295.80 13
1985-08-24 Perforation 1305.40 1307.10 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 573 0.0 0.0 0.0
1993 8569 0.0 0.0 0.0
1994 8643 0.0 0.0 0.0
1995 5564 0.0 0.0 0.0

For data sources see[6]

References