X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525041111000

Well Details

Well ID: 0525041111000
Loading map...
Location: 00/11-11-052-04W5/0
Location Alias: 00/11-11-52-04 W5M
Location Alias 2: 00/11-11-052-04 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 04
Section: 11
County/Municipality: Parkland County
Well Name: HADRIAN WABAMUN 11-11-52-4
Operator Name: Zargon Oil & Gas Ltd.
License Number: 0178306
License Date: 1995-06-02
License Status: Issued
Spud Date: 1995-06-11
Final Drill Date: 1995-06-18
Well Total Depth: 1546.00 m
Surface Hole Latitude: 53.477776
Surface Hole Longitude: -114.483267

For data sources see[1][2]

Well History

Date Event
1995-06-02 Obtained License
1995-06-12 Surface Casing Operation Performed
1995-06-15 Well Log Performed
1995-06-17 Drill Stem Test Performed
1995-06-18 Finished Drilling
1995-06-18 Well Log Performed
1995-06-18 Well Mode changed to Drilled and Cased
1995-06-19 Drill Stem Test Performed
1995-06-20 Drill Stem Test Performed
1995-06-21 Production Casing Operation Performed
1995-06-21 Rig Released
1996-03-12 Well Log Performed
1996-03-14 Well Log Performed
1996-03-15 Perforation Treatment Performed - Jet Perforation
1997-06-01 Well Began Production
1997-06-01 Well Fluid changed to Gas
1997-06-01 Well Mode changed to Flowing
1999-08-01 Well Fluid changed to Gas
1999-08-01 Well Mode changed to Suspended
2001-09-12 Perforation Treatment Performed - Jet Perforation
2002-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-04-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-24 Perforation Treatment Performed - Jet Perforation
2005-04-24 Plug Back Performed
2005-04-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-15 Perforation 1443.50 1445.00 14
2001-09-12 Perforation 1473.00 1474.00 13
2002-01-22 Acid Treatment 1473.00 1474.00 0
2005-04-24 Packing Device Capped w/Cement 1462.00 1470.00 0
2005-04-24 Perforation 1311.00 1316.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4642 0.0 0.0 0.0
1998 7653 0.0 0.0 0.0
1999 24 0.0 0.0 0.0

For data sources see[5]

References