X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525090610003

Well Details

Well ID: 0525090610003
Loading map...
Location: 00/10-06-052-09W5/3
Location Alias: 00/10-06-52-09 W5M
Location Alias 2: 00/10-06-052-09 W5/03
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 09
Section: 06
County/Municipality: Yellowhead County
Well Name: PETRUS BIGORAY 10-6-52-9
Operator Name: Petrus Resources Corp.
License Number: 0325880
License Date: 2005-02-07
License Status: Abandoned
Spud Date: 2005-03-06
Final Drill Date: 2005-03-13
Well Total Depth: 1995.00 m
Surface Hole Latitude: 53.462827
Surface Hole Longitude: -115.312285

For data sources see[1][2]

Well History

Date Event
2005-02-07 Obtained License
2005-03-08 Surface Casing Operation Performed
2005-03-13 Finished Drilling
2005-03-13 Well Log Performed
2005-03-13 Well Mode changed to Drilled and Cased
2005-03-15 Production Casing Operation Performed
2005-03-16 Rig Released
2005-06-01 Perforation Treatment Performed - Jet Perforation
2005-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-05 Plug Back Performed
2005-06-06 Perforation Treatment Performed - Jet Perforation
2005-06-08 Perforation Treatment Performed - Fractured
2005-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-10 Plug Back Performed
2005-06-11 Perforation Treatment Performed - Jet Perforation
2007-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-05-30 Plug Back Performed
2007-05-30 Well Mode changed to Abandoned Zone
2007-05-31 Well Abandoned
2007-05-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-06-01 Perforation 1947.00 1952.00 17
2005-06-05 Packing Device Capped w/Cement 1936.00 1944.00 0
2005-06-06 Perforation 1924.50 1926.50 17
2005-06-08 Fracture 1924.50 1926.50 0
2005-06-10 Packing Device Capped w/Cement 1913.00 1921.00 0
2005-06-11 Perforation 1893.00 1897.50 17
2005-06-11 Perforation 1889.00 1893.00 17
2007-05-30 Packing Device Capped w/Cement 1872.00 1880.00 0

For data sources see[4]



References