If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0525112316000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.499222,"lon":-115.499094,"icon":""}]} |
| Location: 00/16-23-052-11W5/0 | |
| Location Alias: 00/16-23-52-11 W5M | |
| Location Alias 2: 00/16-23-052-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 052 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 23 | |
| County/Municipality: Yellowhead County | |
| Well Name: NRI NORVIL 16-23-52-11 | |
| Operator Name: Clearview Resources Ltd. | |
| License Number: 0462463 | |
| License Date: 2013-12-16 | |
| License Status: Amended | |
| Spud Date: 2014-02-25 | |
| Final Drill Date: 2014-03-14 | |
| Well Total Depth: 3380.00 m | |
| Surface Hole Latitude: 53.499222 | |
| Surface Hole Longitude: -115.499094 |
| Date | Event |
|---|---|
| 2013-12-16 | Obtained License |
| 2014-02-28 | Surface Casing Operation Performed |
| 2014-03-05 | Direction Drilling Operation Performed - Deviate |
| 2014-03-07 | Direction Drilling Operation Performed - Horizontal |
| 2014-03-07 | Well Log Performed |
| 2014-03-08 | Intermediate Casing Operation Performed |
| 2014-03-14 | Finished Drilling |
| 2014-03-14 | Well Log Performed |
| 2014-03-14 | Well Mode changed to Drilled and Cased |
| 2014-03-16 | Liner Casing Operation Performed |
| 2014-03-17 | Rig Released |
| 2014-03-20 | Well Log Performed |
| 2014-03-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-03-23 | Perforation Treatment Performed - Open-Hole Completion |
| 2014-04-04 | Well Began Production |
| 2014-04-04 | Well Fluid changed to Gas |
| 2014-04-04 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-02-25 | Precision Drilling Corporation | 422 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-03-05 | 1701.00 | Deviate (5 - 79 degrees) |
| 2014-03-07 | 2122.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-03-23 | Open Hole/Barefoot Completion | 3366.60 | 3380.00 | 0 |
| 2014-03-23 | Multi-Stage Fracture | 2528.30 | 2529.30 | 0 |
| 2014-03-23 | Multi-Stage Fracture | 2401.70 | 2402.70 | 0 |
| 2014-03-23 | Multi-Stage Fracture | 2248.60 | 2249.60 | 0 |
| 2014-03-23 | Multi-Stage Fracture | 3319.60 | 3334.50 | 0 |
| 2014-03-23 | Multi-Stage Fracture | 3221.80 | 3222.80 | 0 |
| 2014-03-23 | Multi-Stage Fracture | 3121.80 | 3122.80 | 0 |
| 2014-03-23 | Multi-Stage Fracture | 3023.10 | 3024.10 | 0 |
| 2014-03-23 | Multi-Stage Fracture | 2923.80 | 2924.80 | 0 |
| 2014-03-23 | Multi-Stage Fracture | 2824.40 | 2825.40 | 0 |
| 2014-03-23 | Multi-Stage Fracture | 2726.40 | 2727.40 | 0 |
| 2014-03-23 | Multi-Stage Fracture | 2627.60 | 2628.60 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-03-23 | 2014-03-23 | 1,979 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | frac oil | Not Available | 100 | 74.7926 | N/A | |||
| TriProp 20/40 | Trican | corundum | 1302-74-5 | 100 | 23.4744 | N/A | ||
| mullite | 1302-93-8 | 100 | 23.4744 | N/A | ||||
| HB-4 | Trican | Breaker | 1.2.4-trimethylbenzene | 95-63-6 | 100 | 0.3403 | N/A | |
| decane | 124-18-5 | 100 | 0.3403 | N/A | ||||
| distillates (petroleum). straight-run middle | 64741-44-2 | 100 | 0.3403 | N/A | ||||
| dodecane | 112-40-3 | 100 | 0.3403 | N/A | ||||
| hexadecane | 544-76-3 | 100 | 0.3403 | N/A | ||||
| magnesium oxide | 1309-48-4 | 100 | 0.3403 | N/A | ||||
| n-hexane | 110-54-3 | 100 | 0.3403 | N/A | ||||
| tridecane | 629-50-5 | 100 | 0.3403 | N/A | ||||
| undecane | 1120-21-4 | 100 | 0.3403 | N/A | ||||
| xylene | 1330-20-7 | 100 | 0.3403 | N/A | ||||
| HX-4 | Trican | Crosslinker | 2-dibutylaminoethanol | 102-81-8 | 100 | 0.5682 | N/A | |
| ferric sulfate | 10028-22-5 | 100 | 0.5682 | N/A | ||||
| HG-5 | Trican | Gelling Agent | phosphoric acid C8-16 alkylester | 115120-49-5 | 100 | 0.6616 | N/A | |
| S-12 | Trican | Surfactant | ethylbenzene | 100-41-4 | 100 | 0.1626 | N/A | |
| isopropanol | 67-63-0 | 100 | 0.1626 | N/A | ||||
| xylene | 1330-20-7 | 100 | 0.1626 | N/A |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2014 | 6438 | 0.0 | 0.0 | 0.0 |
| 2015 | 8298 | 0.0 | 0.0 | 0.0 |
| 2016 | 7948 | 0.0 | 0.0 | 0.0 |
| 2017 | 8663 | 0.0 | 0.0 | 0.0 |
| 2018 | 8039 | 0.0 | 0.0 | 0.0 |
| 2019 | 7679 | 0.0 | 0.0 | 0.0 |
| 2020 | 2088 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-03-17 | No Incident Encountered | 0.00 | 0.00 |
| 2014-04-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]