X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525113011000

Well Details

Well ID: 0525113011000
Loading map...
Location: 00/11-30-052-11W5/0
Location Alias: 00/11-30-52-11 W5M
Location Alias 2: 00/11-30-052-11 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 11
Section: 30
County/Municipality: Yellowhead County
Well Name: BEI CARROT 11-30-52-11
Operator Name: Tangle Creek Energy Ltd.
License Number: 0081548
License Date: 1980-03-07
License Status: Issued
Spud Date: 1980-03-24
Final Drill Date: 1980-04-09
Well Total Depth: 2129.00 m
Surface Hole Latitude: 53.522380
Surface Hole Longitude: -115.615371

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-03-07 Obtained License
1980-04-09 Finished Drilling
1980-04-12 Production Casing Operation Performed
1980-04-13 Well Mode changed to Drilled and Cased
1980-06-19 Perforation Treatment Performed - Jet Perforation
1980-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-21 Perforation Treatment Performed - Fractured
1980-07-04 Perforation Treatment Performed - Jet Perforation
1980-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-10 Perforation Treatment Performed - Jet Perforation
1980-07-17 Perforation Treatment Performed - Fractured
1980-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-28 Perforation Treatment Performed - Jet Perforation
1980-07-30 Perforation Treatment Performed - Fractured
1984-10-06 Perforation Treatment Performed - Cement Squeeze
1984-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-23 Well Began Production
1985-11-23 Well Fluid changed to Gas
1985-11-23 Well Mode changed to Flowing
2003-06-01 Well Fluid changed to Gas
2003-06-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-06-19 Perforation 2096.00 2098.50 13
1980-07-17 Fracture 2085.50 2091.50 0
1980-07-28 Perforation 2067.00 2070.00 13
1980-07-28 Acid Treatment 2067.00 2070.00 0
1980-07-30 Fracture 2067.00 2070.00 0
1984-10-06 Cement Squeeze 2067.00 2070.00 0
1984-10-24 Acid Treatment 2085.50 2098.50 0
1984-11-01 Acid Treatment 2085.50 2098.50 0
1980-06-20 Acid Treatment 2096.00 2098.50 0
1980-06-21 Fracture 2096.00 2098.50 0
1980-07-04 Perforation 2085.50 2087.00 13
1980-07-04 Perforation 2090.00 2091.50 13
1980-07-07 Acid Treatment 2085.50 2091.50 0
1980-07-10 Perforation 2085.50 2087.00 13
1980-07-10 Perforation 2090.00 2091.50 13
1980-07-10 Acid Treatment 2085.50 2091.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 999 0.0 0.0 0.0
1986 5483 0.0 0.0 0.0
1987 5746 0.0 0.0 0.0
1988 2843 0.0 0.0 0.0
1989 7937 0.0 0.0 0.0
1990 5502 0.0 0.0 0.0
1991 1741 0.0 0.0 0.0
1992 6035 0.0 0.0 0.0
1993 6315 0.0 0.0 0.0
1994 7361 0.0 0.0 0.0
1995 8439 0.0 0.0 0.0
1996 8439 0.0 0.0 0.0
1997 8051 0.0 0.0 0.0
1998 8422 0.0 0.0 0.0
1999 8626 0.0 0.0 0.0
2000 8772 0.0 0.0 0.0
2001 8753 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8615 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8623 0.0 0.0 0.0
2008 8759 0.0 0.0 0.0
2009 8711 0.0 0.0 0.0
2010 8295 0.0 0.0 0.0
2011 7377 0.0 0.0 0.0
2012 8498 0.0 0.0 0.0
2013 5879 0.0 0.0 0.0
2014 7050 0.0 0.0 0.0
2016 4440 0.0 0.0 0.0
2017 8519 0.0 0.0 0.0
2018 8063 0.0 0.0 0.0
2019 7463 0.0 0.0 0.0
2020 1920 0.0 0.0 0.0

For data sources see[5]

References