If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0525120515000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.45285,"lon":-115.735175,"icon":""}]} |
Location: 00/15-05-052-12W5/0 | |
Location Alias: 00/15-05-52-12 W5M | |
Location Alias 2: 00/15-05-052-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 5 | |
Range: 12 | |
Section: 05 | |
County/Municipality: Yellowhead County | |
Well Name: BEI HZ CARROT 15-5-52-12 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0471326 | |
License Date: 2014-11-12 | |
License Status: Issued | |
Spud Date: 2014-11-25 | |
Final Drill Date: 2014-12-10 | |
Well Total Depth: 3588.00 m | |
Surface Hole Latitude: 53.452850 | |
Surface Hole Longitude: -115.735175 |
Date | Event |
---|---|
2014-11-12 | Obtained License |
2014-11-27 | Surface Casing Operation Performed |
2014-11-30 | Direction Drilling Operation Performed - Deviate |
2014-12-03 | Direction Drilling Operation Performed - Horizontal |
2014-12-05 | Intermediate Casing Operation Performed |
2014-12-10 | Finished Drilling |
2014-12-10 | Well Log Performed |
2014-12-10 | Well Mode changed to Drilled and Cased |
2014-12-12 | Liner Casing Operation Performed |
2014-12-12 | Rig Released |
2014-12-16 | Perforation Treatment Performed - Open-Hole Completion |
2015-01-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-01-17 | Well Began Production |
2015-01-17 | Well Fluid changed to Gas |
2015-01-17 | Well Mode changed to Flowing |
2016-02-04 | Well Fluid changed to Gas |
2016-02-04 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-11-25 | Nabors Drilling Limited | 15 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-11-30 | 1917.40 | Deviate (5 - 79 degrees) |
2014-12-03 | 2463.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-12-16 | Open Hole/Barefoot Completion | 3540.00 | 3588.00 | 0 |
2015-01-07 | Multi-Stage Fracture | 2845.30 | 2845.40 | 0 |
2015-01-07 | Multi-Stage Fracture | 2760.50 | 2760.60 | 0 |
2015-01-07 | Multi-Stage Fracture | 2676.50 | 2676.60 | 0 |
2015-01-07 | Multi-Stage Fracture | 2592.40 | 2592.50 | 0 |
2015-01-07 | Multi-Stage Fracture | 3517.70 | 3517.80 | 0 |
2015-01-07 | Multi-Stage Fracture | 3442.80 | 3442.90 | 0 |
2015-01-07 | Multi-Stage Fracture | 3360.10 | 3360.20 | 0 |
2015-01-07 | Multi-Stage Fracture | 3276.40 | 3276.50 | 0 |
2015-01-07 | Multi-Stage Fracture | 3179.00 | 3179.10 | 0 |
2015-01-07 | Multi-Stage Fracture | 3095.80 | 3095.90 | 0 |
2015-01-07 | Multi-Stage Fracture | 3012.20 | 3012.30 | 0 |
2015-01-07 | Multi-Stage Fracture | 2930.30 | 2930.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-01-07 | 2015-01-07 | 2,290 | 543 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 42.9645 | N/A | |||
FRAC SAND. 30/50 WHITE | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 26.9419 | N/A | ||
2K7 Solution W-M | Baker Hughes | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0345 | N/A | |
Methanol | 67-56-1 | 100 | 0.0345 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0345 | N/A | ||||
Breaker N | Baker Hughes | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0098 | N/A | |
Nitrogen | Baker Hughes | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 29.5687 | N/A | |
MaxPerm-20A | Baker Hughes | Friction Reducer | Non-hazardous | 9014 | 100 | 0.36 | N/A | |
Oxyalkylated alcohol | 9014 | 100 | 0.36 | N/A | ||||
Petroleum distillates | 64742-47-8 | 100 | 0.36 | N/A | ||||
Polyacrylate | 9014 | 100 | 0.36 | N/A | ||||
FAW-26 | Baker Hughes | Surfactant | 1-Butoxy-2-propanol | 5131-66-8 | 100 | 0.1202 | N/A | |
Diethanolamine | 111-42-2 | 100 | 0.1203 | N/A | ||||
Ethanol | 64-17-5 | 100 | 0.1202 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.1202 | N/A | ||||
Polyoxyalkylene sulfate | 68891-29-2 | 100 | 0.1202 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-12-16 | 2015-01-09 | Central Water Distribution Facility | 264 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 1185 | 0.0 | 0.0 | 0.0 |
2016 | 8590 | 0.0 | 0.0 | 0.0 |
2017 | 6839 | 0.0 | 0.0 | 0.0 |
2018 | 7055 | 0.0 | 0.0 | 0.0 |
2019 | 7680 | 0.0 | 0.0 | 0.0 |
2020 | 1320 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-12-10 | No Incident Encountered | 0.00 | 0.00 |
2014-12-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]