If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0525121309020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.496321,"lon":-115.649907,"icon":""}]} |
Location: 02/09-13-052-12W5/0 | |
Location Alias: 02/09-13-52-12 W5M | |
Location Alias 2: 02/09-13-052-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 5 | |
Range: 12 | |
Section: 13 | |
County/Municipality: Yellowhead County | |
Well Name: TANGLE CREEK CARROT 9-13-52-12 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0484670 | |
License Date: 2017-07-24 | |
License Status: Issued | |
Spud Date: 2017-08-17 | |
Final Drill Date: 2017-09-04 | |
Well Total Depth: 3865.00 m | |
Surface Hole Latitude: 53.496321 | |
Surface Hole Longitude: -115.649907 |
Date | Event |
---|---|
2017-07-24 | Obtained License |
2017-08-19 | Surface Casing Operation Performed |
2017-08-22 | Direction Drilling Operation Performed - Deviate |
2017-08-24 | Direction Drilling Operation Performed - Horizontal |
2017-08-27 | Intermediate Casing Operation Performed |
2017-09-04 | Finished Drilling |
2017-09-04 | Well Mode changed to Drilled and Cased |
2017-09-06 | Liner Casing Operation Performed |
2017-09-07 | Rig Released |
2017-09-16 | Well Log Performed |
2017-09-30 | Perforation Treatment Performed - Open-Hole Completion |
2017-10-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-10-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-10-19 | Well Began Production |
2017-10-19 | Well Fluid changed to Crude Oil |
2017-10-19 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-08-17 | Trinidad Drilling Ltd. | 22 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-08-22 | 1764.60 | Deviate (5 - 79 degrees) |
2017-08-24 | 2390.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-09-30 | Open Hole/Barefoot Completion | 3835.00 | 3865.00 | 0 |
2017-10-01 | Multi-Stage Fracture | 3382.20 | 3382.70 | 0 |
2017-10-01 | Multi-Stage Fracture | 3329.20 | 3329.70 | 0 |
2017-10-01 | Multi-Stage Fracture | 3274.70 | 3275.30 | 0 |
2017-10-01 | Multi-Stage Fracture | 3220.40 | 3221.00 | 0 |
2017-10-01 | Multi-Stage Fracture | 3155.60 | 3156.20 | 0 |
2017-10-02 | Multi-Stage Fracture | 3101.90 | 3102.40 | 0 |
2017-10-02 | Multi-Stage Fracture | 3048.90 | 3049.50 | 0 |
2017-10-02 | Multi-Stage Fracture | 2995.20 | 2995.80 | 0 |
2017-10-02 | Multi-Stage Fracture | 2927.80 | 2928.30 | 0 |
2017-10-02 | Multi-Stage Fracture | 2875.10 | 2875.70 | 0 |
2017-10-01 | Multi-Stage Fracture | 3834.10 | 3835.00 | 0 |
2017-10-02 | Multi-Stage Fracture | 2820.60 | 2821.20 | 0 |
2017-10-02 | Multi-Stage Fracture | 2767.90 | 2768.40 | 0 |
2017-10-02 | Multi-Stage Fracture | 2715.60 | 2716.10 | 0 |
2017-10-02 | Multi-Stage Fracture | 2663.10 | 2663.60 | 0 |
2017-10-02 | Multi-Stage Fracture | 2609.80 | 2610.30 | 0 |
2017-10-02 | Multi-Stage Fracture | 2557.50 | 2558.00 | 0 |
2017-10-02 | Multi-Stage Fracture | 2504.90 | 2505.40 | 0 |
2017-10-01 | Multi-Stage Fracture | 3779.90 | 3780.40 | 0 |
2017-10-01 | Multi-Stage Fracture | 3728.20 | 3728.70 | 0 |
2017-10-01 | Multi-Stage Fracture | 3675.40 | 3676.00 | 0 |
2017-10-01 | Multi-Stage Fracture | 3609.20 | 3609.70 | 0 |
2017-10-01 | Multi-Stage Fracture | 3555.90 | 3556.40 | 0 |
2017-10-01 | Multi-Stage Fracture | 3502.30 | 3502.80 | 0 |
2017-10-01 | Multi-Stage Fracture | 3450.00 | 3450.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-10-01 | 2017-10-02 | 2,173 | 4,035 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | Not Available | 100 | 15.6158 | N/A | |||
Water | 7732-18-5 | 100 | 74.5174 | N/A | ||||
30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 8.2218 | N/A | ||
40/70 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 2.2514 | N/A | ||
Econocide B1008 (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0074 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0074 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0074 | N/A | ||||
SCS-8 (Clay Control) | Step Energy Services | Clay Control | Inorganic Salt | Not Available | 100 | 0.1118 | N/A | |
SFR-102S (Friction Reducer) | STEP Energy Services | Friction Reducer | Distillates. Petroleum. Hydrotreated Light | 64742-47-8 | 100 | 0.0372 | N/A | |
Proprietary | Trade Secret | 100 | 0.0372 | N/A | ||||
KCNS-2 (Surfactant) | Kinetichem | Surfactant | Citrus terpenes | 68647-72-3 | 100 | 0.0745 | N/A | |
Isopropyl Alcohol | 67-63-0 | 100 | 0.0745 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-09-18 | 2017-09-30 | Groundwater - Non-saline less than or equal to 150m deep | 3200 |
2017-09-23 | 2017-09-30 | Surface Water - Runoff | 900 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 1607 | 0.0 | 0.0 | 0.0 |
2018 | 8028 | 0.0 | 0.0 | 0.0 |
2019 | 8426 | 0.0 | 0.0 | 0.0 |
2020 | 2152 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-09-07 | No Incident Encountered | 0.00 | 0.00 |
2017-10-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]