X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525152110000

Well Details

Well ID: 0525152110000
Loading map...
Location: 00/10-21-052-15W5/0
Location Alias: 00/10-21-52-15 W5M
Location Alias 2: 00/10-21-052-15 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 15
Section: 21
County/Municipality: Yellowhead County
Well Name: TALISMAN ET AL EDSON 10-21-52-15
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0065817
License Date: 1977-09-21
License Status: Suspension
Spud Date: 1978-02-03
Final Drill Date: 1978-03-23
Well Total Depth: 3566.20 m
Surface Hole Latitude: 53.506585
Surface Hole Longitude: -116.148258

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-09-21 Obtained License
1978-02-05 Lost Circulation Occurred
1978-03-23 Finished Drilling
1978-03-27 Production Casing Operation Performed
1978-09-28 Well Mode changed to Drilled and Cased
1979-02-26 Well Log Performed
1979-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-29 Perforation Treatment Performed - Jet Perforation
1988-10-01 Well Began Production
1988-10-01 Well Fluid changed to Gas
1988-10-01 Well Mode changed to Flowing
1989-01-09 Well Log Performed
1989-01-18 Perforation Treatment Performed - Jet Perforation
1989-01-18 Well Log Performed
1989-01-21 Well Log Performed
1989-01-22 Well Log Performed
1989-01-26 Well Log Performed
1989-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-02-22 Perforation Treatment Performed - Jet Perforation
2008-02-22 Perforation Treatment Performed - Remedial Casing
2010-07-01 Well Fluid changed to Gas
2010-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-08-29 Perforation 2998.30 2998.90 13
2008-02-22 Perforation 2807.50 2808.00 7
2008-02-22 Remedial Casing Cementing 2807.50 2808.00 0
1979-08-29 Perforation 2996.50 2997.40 13
1979-08-29 Perforation 2984.50 2985.80 13
1979-08-29 Acid Treatment 2984.50 2998.90 0
1989-01-18 Perforation 2984.50 2986.00 20
1989-01-18 Perforation 2996.50 2999.00 20
1989-01-18 Perforation 3004.00 3008.50 20
1989-01-27 Acid Treatment 2984.50 3008.50 0
1989-01-29 Acid Treatment 2984.50 3008.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 75 0.0 0.0 0.0
1988 2189 0.0 0.0 0.0
1989 6276 0.0 0.0 0.0
1990 8476 0.0 0.0 0.0
1991 7887 0.0 0.0 0.0
1992 8615 0.0 0.0 0.0
1993 8291 0.0 0.0 0.0
1994 8557 0.0 0.0 0.0
1995 8175 0.0 0.0 0.0
1996 8419 0.0 0.0 0.0
1997 8285 0.0 0.0 0.0
1998 8419 0.0 0.0 0.0
1999 8417 0.0 0.0 0.0
2000 8248 0.0 0.0 0.0
2001 8603 0.0 0.0 0.0
2002 8333 0.0 0.0 0.0
2003 8292 0.0 0.0 0.0
2004 8243 0.0 0.0 0.0
2005 8191 0.0 0.0 0.0
2006 8080 0.0 0.0 0.0
2007 8313 0.0 0.0 0.0
2008 552 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-02-05 Lost Circulation 76.20 117.70

For data sources see[6]

References