X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525180602000

Well Details

Well ID: 0525180602000
Loading map...
Location: 00/02-06-052-18W5/0
Location Alias: 00/02-06-52-18 W5M
Location Alias 2: 00/02-06-052-18 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 18
Section: 06
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ EDSON 2-6-52-18
Operator Name: Tourmaline Oil Corp.
License Number: 0459941
License Date: 2013-10-09
License Status: Issued
Spud Date: 2013-11-09
Final Drill Date: 2013-11-30
Well Total Depth: 4928.00 m
Surface Hole Latitude: 53.439549
Surface Hole Longitude: -116.620005

For data sources see[1][2]

Well History

Date Event
2013-10-09 Obtained License
2013-11-09 Lost Circulation Occurred
2013-11-11 Surface Casing Operation Performed
2013-11-17 Direction Drilling Operation Performed - Deviate
2013-11-19 Well Log Performed
2013-11-20 Intermediate Casing Operation Performed
2013-11-22 Direction Drilling Operation Performed - Horizontal
2013-11-30 Finished Drilling
2013-11-30 Well Mode changed to Drilled and Cased
2013-12-01 Well Log Performed
2013-12-06 Production Casing Operation Performed
2013-12-08 Rig Released
2014-02-02 Well Log Performed
2014-02-04 Perforation Treatment Performed - Abrasa-Jet Perforation
2014-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-09 Well Began Production
2014-02-09 Well Fluid changed to Gas
2014-02-09 Well Mode changed to Flowing
2020-04-15 Well Fluid changed to Gas
2020-04-15 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-11-09 Patterson-UTI Drilling Co. Canada 14E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-11-17 2434.70 Deviate (5 - 79 degrees)
2013-11-22 2897.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-02-04 Hydra Jet Perforation 4871.70 4883.90 0
2014-02-07 Multi-Stage Fracture 4259.70 4259.80 0
2014-02-07 Multi-Stage Fracture 4182.10 4182.20 0
2014-02-07 Multi-Stage Fracture 4104.10 4104.20 0
2014-02-07 Multi-Stage Fracture 4025.90 4026.00 0
2014-02-07 Multi-Stage Fracture 3947.70 3947.80 0
2014-02-08 Multi-Stage Fracture 3869.40 3869.50 0
2014-02-08 Multi-Stage Fracture 3789.70 3789.80 0
2014-02-08 Multi-Stage Fracture 3711.80 3711.90 0
2014-02-08 Multi-Stage Fracture 3634.30 3634.40 0
2014-02-08 Multi-Stage Fracture 3556.10 3556.20 0
2014-02-04 Acid Treatment 4871.70 4883.90 0
2014-02-08 Multi-Stage Fracture 3478.50 3478.60 0
2014-02-08 Multi-Stage Fracture 3401.40 3401.50 0
2014-02-08 Multi-Stage Fracture 3323.40 3323.50 0
2014-02-08 Multi-Stage Fracture 3245.50 3245.60 0
2014-02-08 Multi-Stage Fracture 3167.70 3167.80 0
2014-02-08 Multi-Stage Fracture 3090.30 3090.40 0
2014-02-08 Multi-Stage Fracture 3012.80 3012.90 0
2014-02-08 Multi-Stage Fracture 2946.90 2947.00 0
2014-02-06 Multi-Stage Fracture 4805.90 4806.00 0
2014-02-07 Multi-Stage Fracture 4727.90 4728.00 0
2014-02-07 Multi-Stage Fracture 4650.00 4650.10 0
2014-02-07 Multi-Stage Fracture 4572.20 4572.30 0
2014-02-07 Multi-Stage Fracture 4494.60 4494.70 0
2014-02-07 Multi-Stage Fracture 4415.80 4415.90 0
2014-02-07 Multi-Stage Fracture 4337.50 4337.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-02-06 2014-02-08 2,773 7,131 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.6278 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 6.9188 N/A
silica crystalline 14808-60-7 100 6.9188 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 7.6747 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.4283 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0104 N/A
dibromoacetonitrile 3252-43-5 100 0.0104 N/A
non-hazardous ingredients Not Available 100 0.0104 N/A
polyethylene glycol 25322-68-3 100 0.0104 N/A
sodium bromide 7647-15-6 100 0.0104 N/A
CC-77 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1838 N/A
non-hazardous ingredients Not Available 100 0.1838 N/A
FR-9 Trican Friction Reducer distillates (petroleum). hydrotreated light 64742-47-8 100 0.0869 N/A
non-hazardous ingredients Not Available 100 0.0869 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.0689 N/A
isopropanol 67-63-0 100 0.0689 N/A
methanol 67-56-1 100 0.0689 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.0689 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0689 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-02-04 2014-02-08 Surface Water - River 7065
2014-02-04 2014-02-04 Recycled Fracturing Water (treated at well site) 67

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6425 0.0 0.0 0.0
2015 4896 0.0 0.0 0.0
2016 8548 0.0 0.0 0.0
2017 4165 0.0 0.0 0.0
2018 8093 0.0 0.0 0.0
2019 8330 0.0 0.0 0.0
2020 1926 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-09 Lost Circulation 129.00 267.00
2014-02-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References